Jump to content

Operation "Lyra" - A Journey from pain to success!


thomj084

Recommended Posts

Hi EliteKerbalPlayers,

 I was told by @Dman979 that he would be very interested to see my mission report. But what the hell is my mission? Well, if you check out the content below, you'll see what I mean....

P.S. I would like to thank the following members for welcoming and assisting me by providing examples and useful advice :-

Spoiler

 

========================================================================================================== 

Lyra%20LDBS_zpsfn9oflbe.pngOPERATION "LYRA"  - LUNAR BASE DEPLOYMENT SYSTEMS (LBDS) and PLANETARY EXPLORATION

==========================================================================================================

 

Throughout the glorious times for kerbal space exploration, the idea of the first kerbonauts to land on Duna was developed by two scientists, Werner "Dick" Kerman and Ross "Hmmm" Kerman. The idea was dubbed the "Constellation" program. However, the administration for Kerbal Space Program decided that this idea was too risky and too costly. This is where the idea for the "Ares 1-A" Lunar base plan was developed by a brilliant engineer, Richard "Fellowes" Kerman. His blueprint is as shown below:

Ares%201-A%20Deployment%20Plan_zpshjxjeg

Ares%201-%20A%20Module%20Breakdown_zpshc

Again, many senior level management decided against this plan to be a reality. However, Wernher von Kerman and Gene Kerman stated that a deployment of such a base would be fantastic and would be the greatest milestone after the success of the Kerbal Space Station. Hence, they decided to speak to the brain child of the successful and orbiting space station program, Joel Kerman , a project manager who works within Kerbal Space Center.  Joel Kerman with the help of several engineers and watching a lot of space movies developed the idea. This mission was called Operation "Lyra" LBDS. The plan was to establish a lunar deployment capability that would be cheap, safe, reliable and achievable. It's purpose, to establish a Lunar Base on the surface of the Mun and to be the foundation for the future mission for Duna!  This mission got a green light ^_^ The design required the development of a Central Nervous System (CNS) that would have 5 Senior Docking Ports, a sheilfede, A probodyne slim core, around 7KW of battery, SAS and 2x Gigantor Solar Panels. This would be the foundation for the deployment system as well as the foundation for the new Mun Space Station.  The launch of this module was 2 weeks ago. 

044C95A80690F99401576E650C72FE80E8F71547

After the successful launch of the CNS system, Joel , Wernher and Gene Kerman had another dilemma. How do you safely land these modules (shown above) on the surface of any planet, let alone the Mun. That's when  the engineers, Zhetaan and Dman979 Kerman, developed the brilliant idea for an Orbital Skycrane (copied after some mission where they landed a rover on Duna using a similar design). This gave birth to the "Aspida" Orbital Skycrane (OSC).

Aspida%20-%20Orbital%20Skycrane_zpsuxwb3

After several successful tests on Kerbin with all the different Ares 1-A modules, it was decided to launch this system and these three heroes were about to make history, the world's first orbital docking around Mun since the first landing on the surface of the Mun, two years ago. The tension was high but there were no turning back, the rocket was ready to launch.

E1F924D6C1A17EF44B9D7801E655A093A7D76021

The launch went smoothly where the first and second stage managed to get this system to the designated apoapsis of 70km.

20160526225148_1_zpsrfxrfok7.jpg?t=14642

The third stage burn was so successful that the launch had provided the perfect transfer window to the Mun.  It took nearly half a day due to technical problems but the system managed to arrive at Mun. 

20160526230246_1_zps90qvy27q.jpg?t=14642

At this moment, the fairings holding Aspida OSC was deployed and the remaining fuel within the second last stage was used to establish the orbit around the Mun. This moment was perfect for the Aspida OSC to decouple (thanks to the pilots at KSC) and establish a rendezvous orbit to intercept the CNS which is now called "Lyra" Lunar Base Deployment System.

The intercept computers stated that it will take another couple of hour to reach 1.1k away from the other module. The tension to get this right was, even more, higher than the launch. However, after several hours the successful piloting and credible planning by Joel Kerman paid off, the OSC is now in docking range with the "Lyra" LBDS. The docking was a success and it was the beginning of a costly but prosperous programme for KSC.

20160526231247_1_zpsca6bk1m0.jpg?t=14642

9
 
 

 

Edited by thomj084
Format issues, Grammar, Logic
Link to comment
Share on other sites

============================================================================================================== 

 

Lyra%20LDBS_zpsfn9oflbe.png"LYRA" - ORBITAL REFUELING SYSTEM & CHS DEPLOYMENT MISSION

==============================================================================================================

So, after the successful deployment for the foundational pieces for "Lyra" Lunar Base Deployment Systems (LBDS), it was understood that the "Asipda" Orbital Skycrane (OSC) requires fuel to land all these modules on the lunar surface. Hence the Orbital Refueling System was launched to dock with the main LBDS Station. 

LyraORS_Launch_zpsvtf8rwkx.jpg

 

LyraORS_Orbit_zpsopjblv33.jpg

LyraORS_Dock_zps1bn9ybax.jpg

After the successful mandatory requirements for the LBDS were met, it was then decided to launch the CHS module (the main segment for the Ares 1-A Mun Base) to be docked with the LBDS station.

CHS_Launch_zps3tdrye2j.jpg

CHS_Orbit_zpsehsprp8d.jpg

CHS_Dock_zpszpwrjtie.jpg

CHS_Dock1_zpsihdsjtyf.jpg

After the successful docking of the CHS module,there was a waiting period of 30 minutes to land this module on the lunar surface, The landing area is precisely 22km away from the original landing made by Jebediah and Bob Kerman. The fairings around the CHS module were safely removed and it was successfully docked with Aspida OSC. The OSC then successfully established the route for the landing site dubbed "Ares 1-A". 

CHS_Deploy1_zpsietcujhk.jpg

CHS_Land1_zpsxyfeyveu.jpg

After several tense minutes of modifying and verifying all the flight controls and descent mechanisms, the first module for the Mun base has successfully landed on the surface of the Mun. The "Aspida" OSC then undocked with the CHS and landed successfully next to it. It was now a waiting game to get the right opportunity for the OSC to dock with the LBDS Station to be refueled and to get ready to deploy the other modules for the Mun Base.

CHS_Land2_zpshj7adnwd.jpg

Ariel1-A%20Deployment_zpsqqmfgdmj.jpg

Edited by thomj084
Grammar
Link to comment
Share on other sites

Wow @Tiber9, I was about to give up on the posting further content here when you liked it! I genuinely though people lost interest as there are other fantastic projects out there^_^. I appreciate the like.  So here is a further update about the mission.

B742B249EBEC8990C826671C18CFE6B0AEED191C

E0804D8245121540F44AE72CA5F1CE5BC239C2AE

I basically used the CHS module technique to land my next module, the Habitat module. However during my descent, I saved the habitat module but my sky crane (which was wobbly and nearly out of fuel) kamikazed onto another nearby area of the Mun. I'm just bloody fortunate that no Kerbonauts were lost but I lost about 202,000:blush:. So yeah! I have to launch a new sky crane but with more SAS controls! 

Edited by thomj084
Grammar
Link to comment
Share on other sites

So after long hours and some near destruction like experience, I present to you the following transcript.

KSC Flight Director: This is mission control, "Asipda" has just sent us a visual confirmation. We have now established "Ares 1-A" Mun Outpost

"Everyone shouts and screams full of joy and happiness"

Jill Kerman to the Board of Directors: See I told you ^_^

DDA10C3FA6F1611F9D403605759B3CB3B0B512EE

Edited by thomj084
Link to comment
Share on other sites

No problem! ^_^ I now need to land my Kerbonauts to start using this base! So I have already tested and developed my Orion MPMC. I'm now in the process of my final design for the "Altair" Lander. 

D5779E51F1A863370417A65B5FF20DA8E9DC8112

Edited by thomj084
Grammar, Picture
Link to comment
Share on other sites

Haha!

I like it! Sorry I didn't keep checking this, I forgot to subscribe.

If you haven't launched the second tug yet, I'd suggest adding a set of landing legs to it. That way, you don't have it flying off and exploding, and you can land it for future use.

Link to comment
Share on other sites

A further update to everyone! I have successfully now landed 6 Kerbonauts next to the Mun Base! Here are some pictures^_^

349CB5D6F3F0D751F7A8049D9D86B3644F38F858

The Launch of the unmanned "Altair" Lander Module through a probe and the 6 Kerbonaut crewed "Orion" MPMV that will rendezvous with the unmanned Lander Module.93B1496AFEBCA952DF83740C8F7C151F7B5BA504

The rendezvous and establishing the orbit with the "Orion" MPMV and the "Altair" Lander.

B7482371ECA6F0A49E962F61DBA8066D54713139

The successful landing of the "Altair" landing module.

AFD2A6E68D17AC82671D055E5B27215A2A4F9992

The flag planted on the "Farside Crater" where the base and the lander is.

E2A29036958F77618E83F580022961FE0D7D6D34

A photo poses from all 6 Kerbonauts in front of the Mun Base, Callsign "Ariel 1-A". Now these lot can get on and start working plus MOAR science ^_^

Edited by thomj084
Grammar
Link to comment
Share on other sites

Appreciate it @WellItExplodedAgain . Now this has been successful, my intention is to develop a successful rover design for further planetary explorations.  Since I'm using USI Life Support, I need to ensure they have all the necessary supplies & scientific capabilities to explore beyond the premises of the Mun Base! This would also be an adequate opportunity to design an ExoMars probe mission which I like to call ExoDuna to deploy a probe on Duna!

Link to comment
Share on other sites

6 hours ago, thomj084 said:

Appreciate it @WellItExplodedAgain . Now this has been successful, my intention is to develop a successful rover design for further planetary explorations.  Since I'm using USI Life Support, I need to ensure they have all the necessary supplies & scientific capabilities to explore beyond the premises of the Mun Base! This would also be an adequate opportunity to design an ExoMars probe mission which I like to call ExoDuna to deploy a probe on Duna!

I would love to help you out with your missions. Feel free to PM me if you need anything.

Link to comment
Share on other sites

This thread is quite old. Please consider starting a new thread rather than reviving this one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...