Jump to content

user1453

New Members
  • Posts

    3
  • Joined

  • Last visited

Reputation

2 Neutral
  1. 1951-03 tiny tim/wac SR fails due to engine failiure 1951-04 tiny tim/wac SR completes karmen uncrewed 1951-05 RD100/WAC unguided sounding rocket completes 3000kkm downrange 1951-06 2xtiny tim/2xwac completes sub orbital return contract 1951-08 2xtiny tim/2xwac completes Low space Bio 1 At this point there was a lull waiting for more paperwork capacity 1952-04-Bio 2 3xtiny tim/3xwac,Bio 3 3xtiny tim/3xwac, Photo 1 RD102, Failiure of RD102/AJ10-27 due tio engine shutown 1952-07-Failiure of RD102/AJ10-27 due to wind 1952-10-Photo 2 success RD102/AJ10-27 It was obeserved that in gerneral a crosswind was preferable 1952-11 Altitude 1 2xtiny tim/AJ10-27 1953-01-FO attempt caveman 1-fail due to rd102 suffering loss of performance 10s early 1953-04-FO attempt caveman 1-fail due to insufficient RCS to correct spin 1953-08-conracts for FO and FSO expire El presidente is ousted, having bankrupted the company, the new presedent vows to exploit the oil reserves of south america to make them great again .
  2. 1951/01/01-A new Dictator Gains control of French Guiana, he claims to be the reincarnation of Napolion and declares that he shall build an empire not by conquering other countries but by concoring the heavens. He funnels all of the nations funds into CORE aerospace A selection of American and German WW2 parts are locked in a warehouse with the coutries top engineers. "you may not leave until you have created a plane that breakes the sound barrier" 1951/02/18-First test if the X1, powered by 2 Jet engines, the plane breakes the sound barrier on the testflight and hits 15Km altitude, Sergei tries higher but nearly passes out. Unfortunately due to a peperwork mixup mission control was only able to credit this as a first flight 1951/02/19-Having remembered to file the appropriate paperwork, the X1 flys again, this time completing the Crewed supersonic and Xplanes low contracts, 4 days behind a competing spaceagency at brownsville mabey we need to feed the engineers more Pizza
×
×
  • Create New...