Previously posted in General, but advised tom popst here.. So here goes..
Maybe I am missing something with CLS.
So...
I am building my first space station / refuling station.
Just docked a PPD-24 Observation module with a UN-1T1 Pressurised node.
The two are attached using Clamp-O-Tron docking ports (states passible in the VAB inventory)..
Both hatches are open.
I am getting...
CLS has prevented Podesy from moving.
UN-1T1 Pressurised node is not in
Just saw this.
Someone actually posted in my CLS thread about the issue, provided good data and I issued an update.
Be sure you have 1.2.2.1 installed.
If the problem is still there, let me know IN THE CLS THREAD.