The X-38 Crew Return Vehicle: Part 2 - STS-136 - April 2007 In the beginnings of the program, the X-38 was scheduled to have an orbital test flight in 2001 but after several delays the craft would launch aboard Space Shuttle Discovery to be integrated with the International Space Station. Classified as an Assembly Mission, the CRVs test was one of the final Scheduled missions for the stations assembly, falling behind only the Centrifuge Accommodations Module. Discovery and the crew st
    • Like
    8