Around The Mun in hopefully less than 80 days final Chapter: Problem-solving and happy landings. At the KSC the engineers wanted to test out In situ mining so a test craft was assembled and sent to a likely crater that the Elcano Rover had found. The crew needed to replace a docking port that had been destroyed in a crash before they could attach to the miner. But a quick weld from Behnken took care of that and mining began. After 2 Kerbin days, the miner complet
    • Like
    2