Pending official Artemis I plan.

Option discussed: If FTS battery work (requires rollback to VAB) is waived, TSM(U) repairs may be conducted at the pad, followed by a modified WDR with LH2 Fast Fill = path to September 21 NET launch.

📸Nathan Barker (@NASA_Nerd) for NSF. pic.twitter.com/1yjtGxSI0U

— Chris Bergin - NSF (@NASASpaceflight) September 6, 2022