Pending confirmation as always, but KSC guys arriving at work say there are engineers at the base of the pad right now. It's a big milestone in itself to get to prop loading of three cores at the same time, so it isn't unexpected for additional work being required. https://t.co/EjAWswSlV4

— Chris Bergin - NSF (@NASASpaceflight) January 10, 2018