Jump to content

Search the Community

Showing results for tags 'Vulcain engine'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Announcements
    • Welcome Aboard
  • Kerbal Space Program 1
    • KSP1 Discussion
    • KSP1 Suggestions & Development Discussion
    • KSP1 Challenges & Mission ideas
    • KSP1 The Spacecraft Exchange
    • KSP1 Mission Reports
    • KSP1 Gameplay and Technical Support
    • KSP1 Mods
    • KSP1 Expansions
  • Kerbal Space Program 2
    • KSP2 Dev Updates
    • KSP2 Discussion
    • KSP2 Suggestions and Development Discussion
    • Challenges & Mission Ideas
    • The KSP2 Spacecraft Exchange
    • Mission Reports
    • KSP2 Prelaunch Archive
  • Kerbal Space Program 2 Gameplay & Technical Support
    • KSP2 Gameplay Questions and Tutorials
    • KSP2 Technical Support (PC, unmodded installs)
    • KSP2 Technical Support (PC, modded installs)
  • Kerbal Space Program 2 Mods
    • KSP2 Mod Discussions
    • KSP2 Mod Releases
    • KSP2 Mod Development
  • Community
    • Science & Spaceflight
    • Kerbal Network
    • The Lounge
    • KSP Fan Works
  • International
    • International

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Twitter


About me


Location


Interests

Found 1 result

  1. The currently cited price of the Ariane 6 is €75 million($80 million) for the two SRB version and €115 million($125 million) for the four SRB version. But this is 2 and 3 times higher than the price of the Falcon 9 used at $40 million. If ArianeSpace proceeds to offer the Ariane 6 at those prices then like ULA they will be driven to the brink of bankruptcy. It is important to note the high price of the Ariane 6 is coming solely from the high price of the solid side boosters. Note the €40 million added to the price for the two added SRBs of the four SRB version compared to the price of the two SRB version suggests a price for two SRB’s as €40 million. But this would mean the entire rest of the rocket aside from the SRB’s would be €35 million. The two SRB’s on the two SRB version would cost more than the price for the entire rest of the rocket. This gives us a clue for what is going so terribly wrong with the pricing of the Ariane 6. Usually, with solid side boosters their size in mass is ~1/10th the size of the core stage. But with the Ariane 6 the side boosters are the size of the core stage itself. Imagine how high would be the price of the Delta IV and Atlas 5 if those familiar side boosters they often use were each 10 times their current size. So based on that I wanted to see what could be done if we eliminated the SRB’s and just added 1 or 2 additional Vulcains to the core for sufficient thrust for take-off. So that’s the challenge: What would be the payload to LEO if the Ariane 5 core had 1 or 2 additional Vulcains added to the core and no SRB’s? I stated the Ariane 5 core because its propellant mass and dry mass are known, while the numbers for the Ariane 6 core are up in the air. Note with only 2 Vulcains on the core and no SRB’s you could only use a small second stage for it to be able to lift off. I recommend the Ariane 4 H10 hydrolox upper stage at ~10 ton propellant load. With 3 Vulcains on the core though you would have sufficient take-off thrust for a larger upper stage; it could be 30, 40, or even 50 tons propellant load. Robert Clark
×
×
  • Create New...