Jump to content

Search the Community

Showing results for tags 'assistance request'.

The search index is currently processing. Current results may not be complete.
  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Announcements
    • Welcome Aboard
  • Kerbal Space Program 1
    • KSP1 Discussion
    • KSP1 Suggestions & Development Discussion
    • KSP1 Challenges & Mission ideas
    • KSP1 The Spacecraft Exchange
    • KSP1 Mission Reports
    • KSP1 Gameplay and Technical Support
    • KSP1 Mods
    • KSP1 Expansions
  • Kerbal Space Program 2
    • KSP2 Dev Updates
    • KSP2 Discussion
    • KSP2 Suggestions and Development Discussion
    • Challenges & Mission Ideas
    • The KSP2 Spacecraft Exchange
    • Mission Reports
    • KSP2 Prelaunch Archive
  • Kerbal Space Program 2 Gameplay & Technical Support
    • KSP2 Gameplay Questions and Tutorials
    • KSP2 Technical Support (PC, unmodded installs)
    • KSP2 Technical Support (PC, modded installs)
  • Kerbal Space Program 2 Mods
    • KSP2 Mod Discussions
    • KSP2 Mod Releases
    • KSP2 Mod Development
  • Community
    • Science & Spaceflight
    • Kerbal Network
    • The Lounge
    • KSP Fan Works
  • International
    • International

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Twitter


About me


Location


Interests

Found 1 result

  1. In my latest career mode game I am planning to start a Laythe colony. I am using MKS and USI Life Support, with the lowest levels of Interstellar Extended's power and propulsion tech unlocked. In short, no transit times to Jool that would be less than two years or so, at least while carrying a reasonable (30+) number of passengers per trip. I plan to use the Cycler to only carry colonists, building more as time goes on to eventually have a voyage every year or so. Cargo deliveries can be done with traditional Hohmann Transfers. Unfortunately my math and coding skills are not up to the task of determining masses and orbital parameters for this vehicle. I am hoping you nice folks can help me figure these parts out. My questions are as follows: 1. How many ships would be needed for one to arrive at Jool every year? 2. What would be the parameters of the Cycler's initial orbit? 3. How much Delta-V would I need for course changes, ideally or worst case, per trip? Could I use the Joolian moons to reduce this? 4. Is there a more resource-efficient way of doing this cost-wise? I figure that the Cyclers will pay themselves off within two or three voyages because the fuel and construction costs to carry the supplies and crew would be far greater for a similar ship that had to decelerate at either end of the voyage. Once I unlock the more powerful fusion drives this design will be obsolete, but in the interim I have contracts to do things near Jool, and I want to simulate the rotation of specialist personnel that such a facility would experience. As for off-world infrastructure, I currently have a mining and science base on both the Mun and Minmus, a big orbital fuel processor around Minmus, Science/tourism station orbiting the Mun, a science base on Duna with a fuel plant on Ike, and a fuel depot in Geosynchronous orbit over Kerbin, with smaller tugs to carry fuel to crafts in LKO.
×
×
  • Create New...