Jump to content

Set 9 Satellites and return to Kerbin Runway


Recommended Posts

This is my first Craft Designed for Re-entry, while working on this project I was having Overheating Problems on Re-entry and found some help on the Forums to make this project a success. The Thermal Control Systems were not necessary and were removed. The Craft is called Space Tech Sat-9, It is capable of deploying 9 Satellites from it's tail end into orbit and return to base by Runway. Deploying the Satellites was a real treat when watching them drift out of the structural work. Hope you enjoy it as much as I have.

Craft File

Space Tech Sat-9

p><p><img src=

p><p><img src=

p><p><img src=

Edited by castille7
Title Change
Link to comment
Share on other sites

This thread is quite old. Please consider starting a new thread rather than reviving this one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...