Jump to content

Mission Logs & Press Reports


whitejj01

Recommended Posts

This thread is a place for me to post my mission logs/ksp press conferences and reports. Here's the first one; It's the first data ever recieved from the joolian system:

 

 

JOOL 1 sytem log:

 

 

System Startup:

waiting...

waiting...

waiting...

 

System Is Online

Begin SystCheck

 

solar1:online

solar2:online

solar3:online

RTG:online

 

mainComm:online

SecComm:online

 

imager:online

 

GRAVMAX:online

MYSTGOO:online

ACCEL:online

ATMO.F.S.V.:online

TEMP:online

BAR:online

 

SRFSCAN:online

 

SystCheck Complete

 

listening for telemetry signal...

listening for telemetry signal...

listening for telemetry signal...

Signal Acquired

 

Sending StatReport...

 

StatReport Recieved

 

Entering Remote Control Mode(MAIN)...

 

 

 

Link to comment
Share on other sites

Press Conference:

 

(Year 2, Day 36)

 

Gene Kerman:

"With the successful landing of the JOOL 1 probe, we step into a new era of exploration and discovery. a few hours ago we received JOOL 1's systems and status report; all systems are online and ready to perform their respective functions. 

 

In other news, the DunaSurveyor 1 spacecraft has completed its first orbit of Duna, and is beaming back thermal imaging pictures as we speak. DunaSurveyor's resource scanning module will be activated to scan the planet after its fifth orbit is complete, two days from now. Along with its sister satellites, this will provide us with enough information to begin the final selection process for the ARES 1 mission's landing site.

 

The ARES 1 HAB design is almost complete, with only a few more modifications to section 1's main structure to go. any questions?

 

Q: Sir, when can we expect bios of the ARES 1 crew?

A:the crew is currently occupied with their training. bios will be coming in about a week, when we do the final Psych Evaluations on them.

 

Q:the ARES 1's MAV is still orbiting duna, correct?

A: yes, that is correct.

Q:when can we expect the final site selection info, and how long after that will the MAV land?

A: you can expect the site to be released next wednesday. after that, the MAV will begin its descent within a day, once it comes into position over Duna.

No further questions at this time. thank you."

Link to comment
Share on other sites

This thread is quite old. Please consider starting a new thread rather than reviving this one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...