Jump to content

Issue with dock connector within the middle of the craft


Recommended Posts

Hello,

First time poster and very new but I'm having a little issue. During liftoff off my Apollo/Saturn V style of launching to the moon and back. I've got a setup where the docking clamp is positioned within the craft. What happens is that around 15000 feet the craft starts to pull to the side at the docking point and rips the craft apart at this point. I've tried using struts but nothing is helping. I need my lander to connect to the top of the craft to carry them both to the moon.

I have the craft file here it uses KWRocketry, Chatter & Procedural Fairings.

Craft File: https://skydrive.live.com/redir?resid=95EF8AE748BCC910!13799&authkey=!AFUOArR8xaFNw6Y

2013-07-25_00001.jpg

Link to comment
Share on other sites

This thread is quite old. Please consider starting a new thread rather than reviving this one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...