Jump to content

sloots

Members
  • Posts

    3
  • Joined

  • Last visited

Everything posted by sloots

  1. Thanks. I already found the walkaround, but i am quite frustrated not to understand the way the heat transfer works. Do you know if a proper explanation exist somewhere? Didn't anyone get into the code? :-) As far as I am concerned, i'm good at maths, but not worse a penny in coding... Thanks anyway.
  2. Hello Everyone, I am not used to post on forum as usually one can find solutions in the past posts. But, regarding the heat management, I was wondering if someone could provide the maths it relies on. I couldn't find it. My issue seems to be common: I have 1 Duna PDU and 4 MEU-100 drills, (400 kW of core heat in total) with 8 small deployable radiators (same, 400 kW) The PDU alone with 4 small deployable radiators works fine. The 4 drills with 4 small deployable radiators works fine. The PDU + 4 drills + 8 of those radiators, and the drills are getting hot. Even with the PDU + only 1 drill with the 8 small radiators, I get the same result. I need to add a bunch of large deployables radiators to get everything to the optimal temperature. I have seen there was a bug back in 2018, but I guess it has been solved. I still did not find any clear explanation on the role of the max cooling (when it is higher than the required cooling), the 10% transfer rate, the 4x part temperature cooling... If someone can help or direct me to a post or link, it would be really nice.. And by the way, all RD's mods are awsome!!! Thanks
  3. Hi everyone. Argument of periapsis is the angle between the AN and the periapsis. The links listed above give good explanations (the best being Wikipedia). Still, I wonder on these specific contracts: How can you define an Arg to your Pe if you have a 0° inclination (which means that you should have no AN...)
×
×
  • Create New...