Jump to content

Oliverm001x

Members
  • Posts

    221
  • Joined

  • Last visited

Everything posted by Oliverm001x

  1. If you want I can do a future mission, where I can launch numerous satellites (within capacity) to launch a constellation of your cubesats. I could propose that, for a reduced price per satellite.
  2. However does the deal stand for the smaller satellite then, as you signed the bigger one? I would take the smaller one for the initial price
  3. I would like to offer my launch vehicle the TOOLV to deliver your satellite to your intended orbit. The details are visible above, at my vehicle unveiling.
  4. My new rocket the "Titanium One Orbital Launch Vehicle" has just been published on the spacecraft exchange thread. With a capacity of 2.2 tonnes, if any payload providers are interested, please specify either here or on the other thread.
  5. Titanium One Orbital Launch Vehicle Images: The TOOLV is a relatively large rocket capable of carrying a variety of satellites ranging from low-high gain payloads. Payload Capacity: 2.2 Tonnes (LKO) Dimensions: Height: 19.1m Width: 2.2m (1.25m diameter fuselage) Length 2.2 meters. Cost to build: 12,090 Reusability: First stage is fully reusable costing 6,940. Cost to use: 15,717 We look forward to launching your payload, if you wish to utilize this launch vehicle please specify so in wither this thread, or the other one! KerbalX link: https://kerbalx.com/Oliverm001x/Titanium-One-Rocket_2
  6. I do not recall a concrete and definitive date, however I propose a minuscule overhaul, being that the LPs can start designing their 1.875 rockets now and post them, securing contracts post-launch and prior to the official "unveiling".
  7. That would be brilliant! (Is a new idea brewing )? Also:@Brent Kerman The whole purpose of this is that you design we launch, in order to avoid any foul play. If your rocket was not equipped with an antenna, that is not up to @TheEpicSquared to resolve. Now that the problem has been identified, you can go back to the drawing board and add the simple missing part. So TheEpicSquared in my eyes is not accountable for a mistake not made by him.
  8. MAJOR UPDATE!!! TheEpicSquared and I have proudly concurred on the idea of the Youtube channel idea, and are in the process of revamping it. So ladies and gentlemen, prepare for a new medium, which is video. So you may be wondering, what is going to b on the channel? Well, we will be posting a video of each launch, along with a monthly update revolving around the participant's standings. Thank you for your continuous support! The link for the Youtube Channel is found here!
  9. MAJOR UPDATE!!! TheEpicSquared and I have proudly concurred on the idea of the Youtube channel idea, and are in the process of revamping it. So ladies and gentlemen, prepare for a new medium, which is video. So you may be wondering, what is going to b on the channel? Well, we will be posting a video of each launch, along with a monthly update revolving around the participant's standings. Thank you for your continuous support! The link for the Youtube Channel is found here!
  10. 1. Yes 2. Testing is always a preferred thing to do. 3. Enough to conduct each specific mission + 20% (This is what I would say) 4. Yes, however approximately only 30% lengthwise, for the purpose of bending realism without going into the realm of complete structural integration. 5. & 6. Up to @TheEpicSquared We look forwards to your mission!
  11. I am going to be "hopping on the bandwagon" so to speak, by making a list of reservations as well... However to make names still available I state that you are only allowed to reserve three names in advance. To keep things more interesting and not have somebody hogging all of the good ones... Anyhow here are my three names: Francium Rutherford Beta
  12. Teaser Image: Titanium One- R&D not completed.... Up soon NOTE: I am not an imbecile and can see that the staging is not correct . (Before the torrent of comments) *cough cough @TheEpicSquared*cough cough....
×
×
  • Create New...