Jump to content

Talverd

Members
  • Posts

    96
  • Joined

  • Last visited

Posts posted by Talverd

  1. STS-41-E_FORUM.png

     STS - 41-E, September 20th - September 27th, 1982
    Let Freedom Ring

     

    Ramping Up:

    Originally built as a prototype for the Landing & Approach tests portion of the shuttle program, Freedom now sits atop LC-39A ready to begin it's first endeavor into space. The name Freedom is unique among the other orbiters as it does not come from a historical vessel or aircraft, it comes from the idea of freedom itself. Breaking free from the chains of Earth; allowing Kerbalkind to have the freedom to breach into the great unknown. The first orbital flight of OV-101 certainly has a packed schedule. STS-41-E is carrying 3 commercial satellites and will be the first flight to demonstrate the use of the Manned Maneuvering Unit. The MMU is expected to become a staple of the shuttle program, as its uses ranging from satellite recovery to station building are extremely valuable to NASDA. The three satellites carried on board this mission are WCom-10 and OmniSat 2 and 3. STS-41-E is also the last scheduled shuttle landing at Edwards Airforce Base before the first landing back at the Kennedy Space Center.

     

    Crew:

    Commander: John Kerman

    Pilot: Nick Kerman

    Mission Specialist: Admore Kerman

    Mission Specialist:  Finlay Kerman

    Mission Specialist:  Steffen Kerman

    Orbiter:  OV-101 "Freedom"

     

    unknown.png

    Left to right, front to back: John Kerman, Nick Kerman, Admore Kerman, Finlay Kerman, Steffen Kerman. 

     

    unknown.png

    "T-minus 7 minutes and 20 seconds, crew arm now retracting.."

     

    unknown.png

    "GOX arm now being retracted, we are still GO at T-minus 2 minutes and 14 seconds."

     

    unknown.png

    "Ground launch sequencer is go for auto-sequence start. GO at T-minus 30."

     

    unknown.png

    "T-minus 10, 9, 8, 7, 6.."

     

    unknown.png

    "Go for main engine start; 4, 3, 2,1.."

     

    unknown.png

    "Liftoff of Space Shuttle Freedom, slipping the surly bonds of Earth for the first time!"

     

    unknown.png

     

     

    unknown.png

    "Roll program." "We copy your roll, Freedom. Godspeed."

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    MECO and ET seperation.

     

    unknown.png

    OMS -1 

     

    unknown.png

    OMS - 2

     

    unknown.png

    Beginning on-orbit activities.

     

    unknown.png

     

     

    unknown.png

    WCom-10 sits in the rear of the payload bay. OmniSat 2 & 3 are inside the two sunshields. Wcom-10 will be the first deployment. 

     

    unknown.png

    WCom-10

     

    unknown.png

    Deployment of WCom-10.

     

    unknown.png

     

     

    unknown.png

    Crew will wait a day to release both OmniSats. 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Omnisat 2

     

    unknown.png

    Spin-up and deployment of Omnisat 2.

     

    unknown.png

    Crew will wait 2 orbits before beginning deployment sequence of OmniSat 3.

     

    unknown.png

    OmniSat 3. 

     

    unknown.png

    Deployment.

     

    unknown.png

     

     

    unknown.png

    Next up is the EVA phase of the mission. Admore Kerman will step outside of Freedom and strap into one of the MMU's outside. There are two for redundancy.

     

    unknown.png

    Admore emerges and begins making his way to the MMU.

     

    unknown.png

    Admore preparing to detach the MMU. 

     

    unknown.png

    Away.

     

    unknown.png

    Admore will spend the next half hour performing various maneuvers inside the confines of the orbiters payload bay, assuring all systems and translation controls are performing nominally. 

     

    unknown.png

    Moving to the rear of the orbiter.

     

    unknown.png

    Admore photographed by John. 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    After double-checking everything, Admore begins to leave the safety of the shuttle's payload bay.

     

    unknown.png

     

     

    unknown.png

    He is now the first truly untethered spacewalker. While the MTP allowed users to maneuver freely without the use of a tether, it was never used this far away from a spacecraft.

     

    unknown.png

    Admore Kerman adrift above the Earth.

     

    unknown.png

    Admore when interviewed would later state that while he looked lonely out there, "I couldn't hear myself think. Houston was constantly asking for O2 and fuel updates, Steffen was asking when it was his turn, it was a mess."

     

    unknown.png

    "I wouldn't trade it for anything, though. The experience was awe-inspiring."

     

    unknown.png

    After some time, Admore returns to Freedom.

     

    unknown.png

     

     

    unknown.png

    MMU stowed.

     

    unknown.png

    Climbing back inside. 
     

    unknown.png

    The sun sets on a very productive mission.

     

    unknown.png

    After a few more days, Freedom is prepared for re-entry and landing. 

     

    unknown.png

    Retro fire.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

     unknown.png

    Freedom touches down safely. The old bird proves she's capable. 

  2. STS-41-D_FORUM.png

     STS - 41-D, August 9th - August 14th, 1982
    Western Communications

     

    WCom:

    As the shuttle continues to make great strides forward, many commercial partners are itching to have their satellites and other payloads flown aboard. One of these companies with a vested interest in the program is Western Communications. They've worked with NASDA before and their specialty in GEO communication satellites is certainly beneficial to the agency. The first commercial payload flown onboard the shuttle will be a pair of their newest satellites, WCom-8 and WCom-9. Many in the agency look forward to this mission as it opens the door for many commercial ventures in the future.  This mission also marks the  switch over to the program year numbering scheme. Due to a high number of expected flights (and a fear to use the number 13), NASDA managers thought it best to do away with the sequential numbering scheme for the foreseeable future. 

    Breaking it down as to avoid confusion:

    STS - Space Transportation System

    4 - Fourth operational year of the program.

    1 - Designates the launch site, 1 is Kennedy 2 is Vandenberg

    D - Designates the scheduling sequence, goes through Z. 

    Crew:

    Commander: Neil Kerman

    Pilot: Ednand Kerman

    Mission Specialist: Luwise Kerman 

    Mission Specialist:  Cerlong Kerman 

    Mission Specialist:  Gerski Kerman

    Orbiter:  OV-103 "Intrepid" 

     

    unknown.png

    Left to right: Neil Kerman, Ednand Kerman, Luwise Kerman, Cerlong Kerman, Gerski Kerman. 

     

    unknown.png

    Liftoff.

     

    unknown.png

    "We're rolling." "Roger roll." 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    OMS -1 (OMS-2 not photographed.)

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Preparing WCom 8 for deployment.

     

    unknown.png

    She's away! 

     

    unknown.png

    Proceeding nominally. 

     

    unknown.png

    WCom 9 will be deployed one orbit after 8. 

     

    unknown.png

    Deployment of WCom 9 goes less than swimmingly and the kickmotor fails to ignite hours later. It will have to be rescued by another flight. 

     

    unknown.png

    The crew spend the rest of their short flight performing their duties. 

     

    unknown.png

     

     

    unknown.png

    Preparing to go home. 

     

    unknown.png

    De-orbit burn. 

     

    unknown.png

    Getting toasty. 

     

    unknown.png

    Visual of Edwards. 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Another happy landing! 

     

     

     

    Post-Mission Briefing:

    Looking forward to the next flight where my favorite orbiter flies and I get to use the MMU! I'll see you then! 

     

    14 hours ago, Jim123 said:

    Looks really nice, Did you have to do any tweaking or anything special to get Edwards to work for KSRSS?

    Yeah but my friend made the configs for me. 

  3. STS11_patch.png

     STS - 11, June 11th - June 15th, 1982
    Do You Read?

     

     

    GRCA:

    The Geostationary Relay & Communications Array or GRCA, is a planned constellation of numerous geosynchronous satellites meant to improve communications and support all future crewed flights in LEO and beyond. The first of these, GCRA-1, will be launching on STS-11. It will be carried into a low orbit and then boosted higher by it's Inertial Upper Stage or IUS. STS-11 is also quite unique from the previous missions in regards to it's external tank. On previous missions, especially STS-5, there was a worrying amount of damage present on the shuttles heatshield. Investigation into this phenomenon proved it to be related to foam shedding from the external tank, an issue NASDA engineers had hoped they'd solved when the decision was made to keep the tank painted white.  However the issue persisted and the decision was made to further coat the most vulnerable parts of the tank in additional layers of stronger bonding paint, as strengthening the orbiters heatshield itself would be extremely difficult.  This was made possible by the newly introduced lightweight external tank and many were confident that this extra weight wouldn't majorly affect any future payloads. 

    Crew:

    Commander: Kerdun Kerman

    Pilot: Kathley Kerman

    Mission Specialist: Bilbro Kerman

    Mission Specialist:  Jenden Kerman

    Mission Specialist:  Fredlan Kerman 

     

    unknown.png

    Left to right: Kerdun Kerman, Kathley Kerman, Billbro Kerman, Jenden Kerman, Fredlan Kerman.

     

    unknown.png

    Intrepid and it's new Aquarius blue external tank. 

     

    unknown.png

    Liftoff!

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    OMS - 1

     

    unknown.png

    OMS - 2

     

    unknown.png

     

     

    unknown.png

    Opening her up.

     

    unknown.png

    Intrepid & GCRA-1

     

    unknown.png

    GRCA-1

     

    unknown.png

    GRCA & it's ride to GEO are lifted into position for deployment. 

     

    unknown.png

    Photo by Fredlan Kerman

     

    unknown.png

    Preparing for deployment.

     

    unknown.png

    Deployment.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    With it's primary mission completed, Intrepid spends the next 3 days in orbit performing small-scale experiments stored on the mid-deck. 

     

    unknown.png

    The original mission briefing called for an EVA but due to suit issues this was cancelled. 

     

    unknown.png

    Adrift above the Earth.

     

    unknown.png

    Prior to closing the payload bay doors, the tilt-table is rotated back into launch position.

     

    unknown.png

    Closing up the doors.

     

    unknown.png

     

     

    unknown.png

    Preparing for de-orbit burn.

     

    unknown.png

    De-orbit burn.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    STS-11 is concluded. This marks the second to last flight before the first orbital flight of OV-101 "Freedom." 

  4. 1 hour ago, Kuiper_Belt said:

    Go for it! Can't wait to see it! As for your other questions, I am certain Lemon's tank is a custom creation made of Restock bits but as to wring wear on the Shuttle that something I am not aware of :P

    P.S. I've been loving your thread!

    Alrighty then, I'll try to get a post up here soon with some cool images. For now, I'll post this one of Saturn - Shuttle on the launchpad.

     

    unknown.png

  5. 13 hours ago, Tundra said:

    Very Nice!   Looks Stunning!   I do have two suggestion though.    ~One, are you using BenJee's Historical EVA suits mod?       ~Two, up where you list the names it would be nice if you also said which shuttle is flying for the mission.    

     

    I think that this is a very good combination of mods, one that I've wanted to do but never have, and that it produces a very real looking mission and makes it spectacular to read and look at.    

     

    Also, here's the MMU from Cormorant Aeronology but updated by yours truly to work in the latest version, would glitch out before and sometimes explode   :   https://drive.google.com/drive/folders/1QbGaIIeWI6S3YPDUALbeSYfudJjQc8Q5?usp=sharing

     

    To be honest it wasn't that much work and you will probably have to change the file destination in the CFG file to get it to work.   :wink:

    Hi, yes I am using Benjee's suits however I have edited the Cdr. EMU to have blue stripes instead of red stripes.  As for listing the orbiter, I like this idea! I'll be sure to include on future flights. The MMU is already in my game and Im playing an older version so I don't have the issue of it exploding. 

  6.  

    STS10forum.png

    STS - 10, March 29th - April 5, 1982
    A Lab...In Space!

    Spacelab: 

    After the conclusion of the Athena lunar missions and the agency's focus being re-shifted back to LEO, NASDA managers were concerned with the lack of concrete plans for early scientific missions utilizing the shuttle. In 1973, a call was put out for proposals to be made that would address this issue. Several were submitted, but the one that piqued interest the most was a proposal by the VSFA (Valropan Spaceflight Administration). Consisting of a laboratory capable of storing numerous experiments and an external pallet for mounting additional experiments, it was exactly what they were looking for. In early 1974 an agreement between the two agencies was reached. In exchange for crew slots on future missions, the VSFA would provide it's "Spacelab" laboratory module for use on the space shuttle. STS-10 will be the first flight of this Spacelab as well carrying the first Valropan astronaut to go to space. While primarily meant as a demo flight to show the capabilities of the lab, there is still science to be done. Inside of the module are various experiments from universities and colleges from around the United States and a few from the Valropans. 

    Crew:

    Commander: Munbro Kerman

    Pilot: Jeb Kerman

    Mission Specialist: Tanlock Kerman

    Mission Specialist:  Haldin Kerman

    International Mission Specialist:  Rorick Kerman - VSFA

     

    unknown.png

    Left to right: Munbro Kerman, Jeb Kerman, Tanlock Kerman, Haldin Kerman, Rorick Kerman.

     

    unknown.png

    "Liftoff of Shuttle Pathfinder!"

     

    unknown.png

     

     

    unknown.png

    "Roooolllin'!"

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    OMS -2 (OMS 1 not photographed.)

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Opening up the payload bay. Crew will soon open the passage way into Spacelab and begin work in the laboratory. 

     

    unknown.png

     

     

    unknown.png

    Photo from Cdr. Munbro of the view from Pathfinders aft-deck.

     

    unknown.png

     

     

    unknown.png

    Spacelab carries numerous experiments from prestigious universities and other educational facilities from across the United States. 

     

    unknown.png

    Without Spacelab, it would be extremely difficult to conduct these experiments on the shuttle. There is hope that Spacelab flights can become routine, giving NASDA a flowing revenue stream.. however minor it might be. 

     

    unknown.png

    While Spacelab is currently crucial for scientific ventures, there is hope to eventually phase it out in-favor of something domestically produced. Converting the PLM from the Shuttle - Skylab program into a similar laboratory is already being discussed, though the funding for this project is iffy at best. If anything is to come of it, it will be far down the line. 

     

    unknown.png

     

     

    unknown.png

    Photo from IMS Rorick.

     

    unknown.png

    The experiments onboard STS-10 are not limited to being inside the laboratory itself. Behind it sits a pallet chock-full of experiments meant to be ran in the vacuum of space. 

     

    unknown.png

    Photo from Jeb Kerman.

     

    unknown.png

     

     

    unknown.png

    Closing up and preparing to go home.

     

    unknown.png

    De-orbit burn.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Pathfinder returns safely once more,  STS - 10 is concluded.

     

     

  7. STS-9_forum.png

    STS - 9, March 3rd - March 8th, 1982
    Return To Sender

    Space Trucking: 

    On October 27th, 1977, GWO - 2 (Geostationary Weather Observer) lifts off from LC-17B onboard an Aquarius 2914 rocket. Everything during the launch proceeded nominally until it came time for the satellites kick-stage to begin its burn. For unknown reasons, it failed to ignite and left the satellite stranded in an unusable low orbit. In order to further prove the space shuttles capabilities, STS-9 has been tasked with recovering this satellite and returning it to Earth for refurbishment and possible re-use. This will be the first mission to use the robotic manipulator arm to achieve mission goals as well as the first to return a payload to the Earth. 

    Crew:

    STS - 9 will have the first female EVA participant. 

    Commander: Matney Kerman

    Pilot: Desbro Kerman

    Mission Specialist: Obbro Kerman

    Mission Specialist:  Gidon Kerman

    Mission Specialist:  Merwin Kerman

     

    unknown.png

    Left to right: Matney Kerman, Desbro Kerman, Obbro Kerman, Gidon Kerman, Merwin Kerman.

     

    unknown.png

    Liftoff.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    OMS 1
     

    unknown.png

    OMS 2

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Rendezvous burn.

     

    unknown.png

     

     

    unknown.png

    Fine-tuning encounter with RCS.

     

    unknown.png

    Ditto.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Photo of GWO - 2 taken by Cdr. Matney

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    After capture, GWO - 2 will be lowered toward the payload bay for ease of access by upcoming two-Kerbal EVA.

     

    unknown.png

     

     

    unknown.png

    Obbro and Merwin emerge from Intrepid and begin making their way towards GWO - 2.

     

    unknown.png

    Inspecting GWO -2.

     

    unknown.png

     

    Oddbro begins retracting GWO - 2's antennas and other fixtures. 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    GWO - 2 is released from the arm and guided into the grapple mechanism by the two Kerbals.

     

    unknown.png

    Capture.

     

    unknown.png

    Merwin holding onto GWO - 2.

     

    unknown.png

     

     

    unknown.png

    The capture system is rotated downwards to allow clearance for the payload bay doors to be shut. 

     

    unknown.png

    Oddbro & Merwin posing with their captured satellite. 

     

    unknown.png

    After successful capture and stowage of the satellite, the two make their wake back inside, 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Closing up shop.

     

    unknown.png

     

     

    unknown.png

    Retro burn.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    "Welcome home, Intrepid. We'll meet you on page 41." 

     

  8. STS_8_forum.png

    STS - 8, December 29th - January 4th, 1981 - 82
    International Cooperation

    Intrepid's debut: 

    The rollout of the space shuttle is beginning to become a common sight at Cape Kennedy, with most getting used to the spectacle. However, todays rollout is different from the norm. Instead of Pathfinder returning to the pad once again for another flight, OV-103 "Intrepid" sits in its place. Named after a famous Akerimian scientific vessel from the early 1800's, it is the second space-worthy orbiter to join NASDA's shuttle fleet. Its first voyage into space is certainly one of significance, as it will carry the first non-Akerimian payload to be launched on the shuttle. The payload in question is a pair of geostationary communications satellites named Huwako 1 & 2 from the Kalionian Republic. STS-8 will also be the first mission to conduct an EVA from the orbiter itself and the first to carry the Arcadian developed robotic manipulator system.  The external tanks weight has also been significantly reduced through various means, allowing the orbiter to carry heavier payloads in the future. 

    Crew:

    Commander: Layne Kerman

    Pilot: Raywise Kerman

    Mission Specialist: Bob Kerman

    Mission Specialist:  Jack Kerman

    Mission Specialist:  Valentina Kerman

     

    unknown.png

    Left to right: Layne Kerman, Raywise Kerman, Bob Kerman, Jack Kerman, Valentina Kerman.

     

    unknown.png

    "Liftoff of Shuttle Intrepid and it's mission to strengthen our relations on Earth and in space!"

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    OMS - 2. (OMS - 1 not photographed.)

     

    unknown.png

    "Intrepid"

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Huwako 1.

     

    unknown.png

    Huwako 1 spin-up and deployment.

     

    unknown.png

    Huwako 2.

     

    unknown.png

    Huwako 2 deployment.

     

    unknown.png

    Huwako 1/2.

     

    unknown.png

     

     

    unknown.png

    Following the deployment of both satellites, Bob Kerman and Jack Kerman begin preparations to exit the orbiter and begin their 2 hour EVA.

     

    unknown.png

    Bob emerges from the shuttle's airlock.

     

    unknown.png

    Bob & Jack working in the payload bay, one hour into their EVA.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Bob trailing behind Jack on their way back to the airlock.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Preparing for de-orbit burn & re-entry. 

     

    unknown.png

    Retro burn.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Re-entry. Due to game issues, there is a massive skip between screenshots as runway approach was not photographed.

     

    unknown.png

    Touchdown. 

     

    unknown.png

    Intrepid's maiden voyage is concluded, welcome to the fleet! 

     

    Post-Mission Briefing:

    Before anyone mentions it, I am aware that the shuttle in real life was not capable of flying over a new years due to computer issues. Just imagine that this issue doesn't exist in this. Also, please excuse any spelling mistakes as I am writing this while I am very tired. 

     

  9. STS_7_forum.png

    STS - 7, August 12th - August 18th, 1981
    Out With The Old 

     

     

    Skylab's Restoration:

    While Skylab isn't the oldest station in orbit, it is certainly beginning to show its age. Starting construction in 1968 and launching in 1973, a majority of the systems onboard are outdated. In order to resolve this issue,  STS - 7 will deliver several replacements to key systems inside the station and as well as a large amount of consumables intended for future long-stay missions.  STS - 7  will carry the cargo in the Pressurized Logistics Module, a reusable cargo module purpose built for the Shuttle-Skylab program.  This mission will also host the first spacewalk from Skylab since 1974. The one-Kerbal EVA will perform a visual inspection of the outside of the station up close and report any issues found.  This is the last planned Skylab mission until late 1982 and also the last flight before the maiden voyage of OV -103 "Intrepid."

    Crew:

    STS - 7 marks the first time a woman has commanded a shuttle mission.

    Commander: Gillock Kerman

    Pilot: Trabas Kerman

    Mission Specialist: Ceri Kerman

    Mission Specialist:  Desbro Kerman

     

    unknown.png

    Left to right: Gillock Kerman, Trabas Kerman, Ceri Kerman, Desbro Kerman. 

     

    unknown.png

    Liftoff.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    ET Sep.

     

    unknown.png

    OMS 1 (OMS 2 not photographed.)

     

    unknown.png

     

     

    unknown.png

    Pathfinder with the Pressurized Logistics Module (PLM).

     

    unknown.png

    Skylab rendezvous burn.

     

    unknown.png

     

     

    unknown.png

    Braking burn.

     

    unknown.png

    Visual of Skylab.

     

    unknown.png

    Moving forward.

     

    unknown.png

     

     

    unknown.png

    Soft-capture.

     

    unknown.png

    Hard-capture, Pathfinder has docked to Skylab for the second time. 

     

    unknown.png

     

     

    unknown.png

    After one orbit, the hatch to Skylab is opened and the crew begins transfer into the station.

     

    unknown.png

    Contents from the PLM are transferred into Skylab and the crew begins the long process of replacing older systems while the Extravehicular Mobility Unit is prepared for use by Duddan Kerman.

     

    unknown.png

     

     

    unknown.png

    Skylab's airlock hatch. Trabas Kerman is expected to emerge shortly. 

     

    unknown.png

    Trabas steps outside.

     

    unknown.png

    First EVA photo taken. 

     

    unknown.png

    Trabas begins moving around the stations exterior, climbing upwards towards the ATM.

     

    unknown.png

     

     

    unknown.png

    Peeking above.

     

    unknown.png

     

     

    unknown.png

    Another photo from Trabas' EVA.

     

    unknown.png

    Trabas begins utilizing his MTP (Manned Thruster Pack) to perform obversions of the rear of the station. He would later note the systems delayed control systems as well as the very limited fuel. This system is planned to be replaced by the MMU (Manned Maneuvering Unit).

     

    unknown.png

     

     

    unknown.png

    After 2 hours outside, Trabas returns to the hatch and climbs back inside. 

     

    unknown.png

    The crew will spend a total of 10 days at Skylab. 

     

    unknown.png

     

     

    unknown.png

    After undocking, Pathfinder will spend another 2 days in orbit. 

     

    unknown.png

     

     

    unknown.png

    Undocking & Skylab departure. Farewell!

     

    unknown.png

     

     

    unknown.png

    Closing up the doors.

     

    unknown.png

    De-orbit burn. Reentry was not photographed.

     

    unknown.png

    Gliding.

     

    unknown.png

     

     

    unknown.png

    A bit high.

     

    unknown.png

    Main gear touchdown.

     

    unknown.png

    Nose gear touchdown.

     

    unknown.png

    Another successful landing, welcome home once again Pathfinder. 

     

    Post-Mission Briefing:

    Sorry for taking so long! I got caught up with some other stuff that I had to take care of.  If you're wondering what's up with the shuttles texture, I edited it to match the Columbia/Challenger tiled look instead of having the thermal blankets. I hope you like it because I certainly do.

  10.  

    sts_6_forum.png

    STS - 6, April 21st, 1981

    In Peace?

     

    Military Applications:

     From the Shuttle Programs inception, the United States Air Force  and Department of War have kept a keen eye on it. One of the main reasons the payload bay is so large is because of the DOW. In order to secure their support for the program, one of the main requests was the payload bay be large enough to carry and deploy the next generation of large and bulky spy satellites. This was met with backlash from some sectors of NASDA, citing the possibility of the shuttle becoming a military vehicle and spitting in the face of the agencies civilian nature. However the request was approved and the changes were made early on in the design process of the shuttle. STS - 6 will be the first shuttle mission to carry a military related payload, a spy satellite for the USAF.  Due to the classified nature of the payload, this mission will bring along the first USAF Payload Specialist. USAF Payload Specialists are active duty Airforce personnel trained to handle any classified payloads they are assigned to.

    As Pathfinder is rolled out to the pad, a few watch on in quiet resentment and others watch in excitement. Some say the mission will be viewed as a stain on the history of the agency and will be the catalyst for the eventual militarization of the space shuttle. Others  are much more reserved, believing it to be a necessary evil and something that will not majorly effect operations of the civilian side of the program. NASDA management is understanding of most criticisms, but their obligations to the Air Force and Department of War must be filled if they wish for continued support. 

    Crew:

    Commander: Munbro Kerman

    Pilot: Layne Kerman

    Mission Specialist: Neil Kerman

    USAF Payload Specialist: Hancal Kerman

     

    unknown.png

    Left to right: Commander Munbro, Pilot Layne, Mission Specialist Neil, USAF Payload Specialist Hancal.

     

    unknown.png

    Pathfinder lifts off from LC-39A once again. OV-103 "Intrepid" will soon join Pathfinder in launching from this pad, as her first scheduled flight is STS-8. 

     

    unknown.png

    "Liftoff of Space Shuttle Pathfinder and it's Airforce payload!"

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Rolling with the changes.

     

    unknown.png

     

     

    unknown.png

    SRB separation.

     

    unknown.png

     

     

    unknown.png

    ET separation.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    OMS - 1 & 2.

     

     

    unknown.png

     

     

    unknown.png

    The payload bay doors are opened after 1 orbit.

     

    unknown.png

     

     

    unknown.png

    The crew will wait 2 days before beginning the deployment of the AOS - 1 spy satellite. 

     

    unknown.png

     

     

    unknown.png

    Opening the sunshade.

     

    unknown.png

    Preparing for deployment.

     

    unknown.png

    Deployment of AOS - 1

     

    unknown.png

     

     

     

    unknown.png

    AOS - 1 from Pathfinder.

     

    unknown.png

    Pathfinder from AOS - 1.

     

    unknown.png

    AOS - 1's Staara-38 is ignited. Once this burn is completed, it will be separated and an internal engine will perform the next burn. 

     

    unknown.png

    AOS - 1.

     

    unknown.png

    Moving back to Pathfinder, the orbiter and her crew will spend the next 4 days in space.

     

    unknown.png

     

     

    unknown.png

    Commander Munbro staring out of Pathfinder's flight deck windows. 

     

    unknown.png

    View of Pathfinder's payload bay on Mission Day 5. 

     

    unknown.png

     

     

    Cunknown.png

    Closing up the payload bay doors. 

     

    unknown.png

    Preparing for de-orbit burn.

     

    unknown.png

    De-orbit burn.

     

    unknown.png

    Final preparations before hitting the atmosphere. 

     

    unknown.png

    Re-entry.

     

    unknown.png

     

     

    unknown.png

    Passing over Edwards.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    We have wheel stop, STS-6 is completed. 

     

     

     

  11. STS_5_forum.png

    STS - 5, December 5th, 1980

    Laying The Groundwork

     

    Returning to Skylab:

    With the safe conclusion of STS - 4, the Space Shuttle Program officially ceased to be a test program on June 13th, 1980. The Shuttle was now a fully certified crew and cargo vehicle, ready to begin normal operations. STS - 5 will be the first of these operational missions and will carry the Skylab - Shuttle Docking Adapter.  While Skylab's existence now is essential, giving NASDA valuable experience in maintaining and expanding stations, it will not last forever. The breath of life the station was given was only so it can serve as a stop-gap for the planned "Permanent Orbital Space Station", which is currently in it's preliminary design phase.  Expected to begin construction in the early to mid-90's,  the orbital outpost will serve as a stepping stone for Kerbalkind's return to the Moon and eventually voyages to Mars.  However,  this is still a very distant goal and for now Skylab will have to do. Skylab is set to receive future expansion in addition to the docking adapter, including new solar arrays and the addition of a large pressurized science module courtesy of the Valropan Spaceflight Administration. The station is expected to cease operations in 1988 and be deorbited in 1989, finally meeting the fate it was saved from all those years prior. 

    Due to more unexpected issues with the robotic manipulator system, it was not included on this flight. Instead, the docking adapter will be released from the shuttle's payload bay and docked to Skylab by ground control similarly to how the TRS was previously on STS -2.

    Crew:

    STS - 5 is the first shuttle flight to carry more than 2 astronauts and the first to carry an Akerimian woman into space. 

    Commander: Thomping Kerman

    Pilot: Bob Kerman

    Mission Specialist: Valentina Kerman

    Mission Specialist: Chadmon Kerman

     

     

    unknown.png

    Left to right: Commander Thomping, Pilot Bob, Mission Specialist Valentina, Mission Specialist Chadmon.

    Crew of STS - 5 pose with their Astronaut Transfer Van.

     

    unknown.png

    Pathfinder sitting atop LC-39A for the 5th time.

     

    unknown.png

    T-minus 10, 9, 8 , 7, 6...

     

    unknown.png

    Go for main engine start; 5, 4, 3,2 1...

     

    unknown.png

    Liftoff of Pathfinder, paving the way for future missions to Skylab!

     

    unknown.png

    "Roooollin'!" "Roger roll, Pathfinder."

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    "We have SRB separation, lookin' good and on profile." 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Pathfinder separates from its external tank. 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    OMS 1 & 2. This puts Pathfinder on a rendezvous after 3 orbits. 

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Braking at Skylab. 

     

    unknown.png

    View of Skylab from the crew as they approach. 

     

    unknown.png

    Pathfinder holds at 400 meters away from Skylab and begins station keeping procedures. The Skylab - Shuttle docking adapter will be released from the payload bay shortly. 

     

    unknown.png

    Docking adapter leaving Pathfinder's payload bay. Ground teams are now in control and will begin moving it towards Skylab. 

     

    unknown.png

    The docking adapter has 3 different docking systems on it. The forward system is an APAS-75, designed for use on the joint Athena - Unity mission. On the top is an Athena drogue to be used for the installation of a planned power module. The aft docking system is an Athena probe, meant to dock with the forward drogue on Skylab. 

     

    unknown.png

     

    unknown.png

    Docking begins moving towards Skylab.

     

    unknown.png

    A bit close.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Docking adapter has successfully docked to Skylab. Pathfinder will wait a brief period before attempting docking.

     

    unknown.png

    After some time, Pathfinder begins its approach to Skylab. 

     

    unknown.png

    Moving closer.

     

    unknown.png

     

     

    unknown.png

    Soft-capture. 

     

    unknown.png

    Pathfinder has docked to Skylab. This monumental occasion will be the catalyst for many important milestones throughout the years.

     

    unknown.png

    The crew will spend 3 hours doing final checks and assuring there aren't any issues with Pathfinder, the docking adapter, or Skylab. 

     

    unknown.png

    The crew enters the docking adapter and then opens the hatch into Skylab. 

     

    unknown.png

    Pathfinder has brought several replacement systems for Skylab and the crew begin their work on refurbishing parts of the station.

     

    unknown.png

    Pathfinder and Skylab now form the largest space complex in the history of Kerbalkind.

     

    unknown.png

    The crew will spend the next 6 days on Skylab. Unfortunately, due to issues with the Extravehicular Mobility Unity the first planned EVA of the shuttle program had to be delayed to a future flight.

     

    unknown.png

     

     

    unknown.png

    On mission day 7, the crew begins procedures for departure. The docking adapters hatch is closed and sealed and Pathfinder is prepared for undocking. 

     

    unknown.png

    Undocked.

     

    unknown.png

    Farewell for now, Skylab!

     

    unknown.png

    After departure from Skylab, Pathfinder begins preparations for de-orbit burn and reentry.

     

    unknown.png

    De-orbit burn. 

     

    unknown.png

     

     

    unknown.png

    Re-entry.

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

     

     

    unknown.png

    Main gear touchdown.

     

    unknown.png

    Nose gear touchdown.

     

    unknown.png

    "Pathfinder, Houston - wheel stop." "Roger wheel stop, welcome hope Pathfinder."

    Post-Mission Briefing:

    A long and very enjoyable mission, I hope you enjoyed it. I tried a new TUFX config during this and I really liked it, but if anyone has any qualms with it let me know. 

  12. Hi all, I added a mission list to the first post on this thread. It will be updated every time I finish planning/complete/skip a mission. This also leads me to my next point, I am skipping STS - 4 because I do not feel it is interesting enough to justify it having it's own dedicated thread post. In my mission plans, it is very similar to STS - 3 and I am looking to move past the test missions and get into the interesting bits. STS - 5 will be worked on tonight and hopefully finished tomorrow, it will be the delivery of the Skylab docking adapter and first docking to Skylab by shuttle.

×
×
  • Create New...