Okay so I've got the Lem/ Fairing base part figured out. how do I separate the Lem and CSM during construction so that the Lem isn't perma attached to the CSM (sorry for being such a bother). Edit: I figured it out. lol put a viklun stack seperator in between the CSM and the LEM. Thanks for taking the time to help me out