Hi
I want to show my version of a chimaera between a Titan 23G; the Vega Upper Stage and the CZ-2F/G: It's called ARENAL 2-M/DS (Dual Stack), in honor of a volcano in my country
Pre-launch: It will carry two communication satellites: A standar Comsat (Horizon 3) and a space relay link (Lightning 2)
It seems that the launch support needs reinforcement against 6 LR-87 combustion chambers...
Ascending phase
Booster separation
Fairing separation
Second Stage Separation
The first burn of the second stage will leave the stack on an 85 x 110 km orbit
Second ignition. It will leave the Orion/Vega stage on a 2500 x 85 km orbit
Drift Maneuver
Vega/Orion first ignition, for a final transfer orbit to 2.5x Keostationary Transfer Orbit
Plane changing/transfer burn, 1200 x 6000 km x 30°
Horizon 3 separation
Lightning 2 separation
After that, both satellites, will use their electrical propulsion system for finishing the transfer and the comisioning phases...