Jump to content

The level 2 bridge run


Recommended Posts

I got bored doing one of my contracts.

I decided to try to do the bridge run, but realized that it had much less clearance.
This was the best I could do.

I challenge all other kerbonauts to do the R&D Level 2 bridge run. 
Do the full one, and i’ll make you a badge with MS paint.

 

Edited by Wizard Kerbal
Link to comment
Share on other sites

  • 2 weeks later...
On 10/1/2023 at 9:02 PM, Wizard Kerbal said:

I challenge all other kerbonauts to do the R&D Level 2 bridge run. 
Do the full one, and i’ll make you a badge with MS paint.

I don't know what 'the full run' means, but I did have this recorded a long while back.

 

 

With a little later, Val trumping Jeb by going through the even tinier lvl2 tunnel...

 

 

 

The craft flown was a reengineered iteration of Pixie's Arrowhead, if I recall correctly.

Link to comment
Share on other sites

This thread is quite old. Please consider starting a new thread rather than reviving this one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...