Jump to content

One Giant Leap | An Alternate History of Space Exploration


track

Recommended Posts

Same Saturn, Different Shuttle

As was becoming a tradition, Columbia rolled out of the VAB at midnight to head to 39B for her inaugural flight, STS-5. Despite the very late time, thousands gathered to see the new Shuttle as she made her way to the launchpad for the very first time. It was a great moment for NASA, multiple shuttles would be necessary in order to accomplish a high flight rate. Although physically similar to Enterprise, Columbia looked strikingly different. The black wing strakes and the lack of the "black mask" of Enterprise set her apart from her predecessor. Columbia also had a few key TPS differences besides these, mainly on the nose and vertical stabilizer. Columbia also has less overall TPS tiles than Enterprise, with lessons learned really coming into play in that category. Columbia's aluminum frame was also different in some ways from Enterprise. More structural rigidity had been added to certain areas, and steel plates had also been added behind some tiles to cover important hardware. Internally there were improvements as well, some important switches in the cockpit were moved to places of easier and more direct access. Columbia also featured Heads-Up Displays (HUDs) which provided the Commander and Pilot with information right in front of them instead of having to look down at instruments. This was a relatively new technology so it wasn't to be relied on entirely. On top of this there were improvements to the lower deck access and ECLSS compartments. As well as some storage improvements on the mid-deck to provide better securing of cargo. Among engineers Enterprise was infamous for her sub-optimal hydraulics, they were difficult to deal with and difficult to repair or replace. A better accumulator and pump system was put on Columbia, and it will be used on all future Orbiters if it performs well.

Although to many the new Shuttle was just a footnote for STS-5, for NASA it was truly like a second test flight. Columbia benefitted from many lessons learned during the construction, assembly, and initial flights of Enterprise, and it was time to put those lessons to the test. Columbia's initial mission had proper payloads to deploy, primarily the Joint Ultraviolet Observatory. This is an Ultraviolet Telescope developed by NASA in cooperation with the European Space Agency. Onboard as well is the Shuttle Multispectral Scanner, which will study the composition of celestial objects. Let's go over the full mission plan.

MISSION OVERVIEW: STS-5 |

Commander | Donald Peterson

Pilot | William Lenoir

Mission Specialist 1 | Brian O'Leary

Mission Specialist 2 | Anthony England

OV-102 "Columbia"

Objectives: Verify systems of OV-102, deploy Joint Ultraviolet Observatory, utilize Shuttle Multispectral Scanner.

After a few delays to repair some systems on the Mobile Launcher, STS-5 is go for launch on the morning of April 26th, 1978.

"Liftoff of the new Shuttle Columbia and the Joint Ultraviolet Observatory!"

screenshot2198.png

screenshot2200.png

screenshot2201.png

screenshot2203.png

screenshot2206.png

Columbia's first mission will be a short one, only 3 days in length. This first day will give the crew time to verify systems after launch, and do some experiments carried along to orbit. As far as the upgrades go, Donald Peterson, who previously flew aboard Enterprise on STS-3, was happy to note the changes to switch positions. Stating "much easier to reach this" at several points during the countdown. Most of the other changes would only benefit ground crews working on processing Columbia for her next flight, but they were still there.

screenshot2208.png

Columbia would also be demonstrating some changes to the Canadarm, as it would be used for the deployment of JUO. The Canadarm is one of the Shuttle's most incredible features, allowing it to deploy or capture objects in orbit, provided they already have the Power/Data Fixture for connecting to it.

screenshot2210.png

screenshot2211.png

Now safely latched onto JUO, the crew perform checkouts of the satellite, and prepare for deployment on the next orbit.

screenshot2220.png

screenshot2221.png

It is oddly surreal for the astronauts of Columbia. Here they are, aboard a plane, in space, with a 4+ ton space telescope hanging from a robotic arm that they themselves are controlling, it is a true testament to the amazing engineering of the Space Shuttle, and a magnificent sight to see.

screenshot2224.png

A few minutes later, JUO is successfully deployed, and sailing away from the Shuttle.

screenshot2228.png

Day 2 is wrapped up with some more experiment work, and then settling in for some rest.

Day 3 is focused on the use of the Shuttle Multispectral Scanner. Objects studied include Andromeda, Saturn, the Crab Nebula, and several stars including Rigel, Canopus, and the Sun itself. The crew also take part in several conferences, including one where they answer questions from schoolchildren about the Shuttle, JUO, and about being an astronaut.

screenshot2231.png

At the end of Day 3, Columbia de-orbits, and heads for a landing at the Kennedy Space Center.

screenshot2232.png

screenshot2233.png

screenshot2234.png

screenshot2238.png

"Gear down on the Space Shuttle. Coming over the runway now..."

screenshot2239.png

"Alright, 100 feet, Columbia..."

"Shuttle at 50 feet..."

"20..."

"10..."

"Main Gear Touchdown!"

"Nose Gear coming down now..."

"COLUMBIA HARD RIGHT."

"Wheel Stop..."

"Phew, Columbia you had us nervous there for a second."

"We were nervous too, Houston! Kept her on the runway though."

screenshot2241.png

Columbia has a bit of a scary moment in which, after main gear touchdown, because she came down at a bit of an angle, the Shuttle starts to drift towards the left side of the runway, nearly off the runway in fact. Thankfully it is corrected and Columbia comes to a stop well within the runway's limits. Besides this little Shuttle drift moment, Columbia's first mission is an outstanding success. 3 months later, in July, she flies again on STS-6, which carries the Freedom module to Skylab with a crew of 4.

In terms of the post-flight processing flow, Columbia's upgrades and changes seem to have made a massive impact. Ground crews noted the hydraulic improvements, as well as it being easier to access key systems. There are also upgrades to the Mobile Launcher in between these 2 flights, as a LOX vent arm is added to collect venting Liquid Oxygen from the External Tank in a new nose cap vent system.

screenshot2295.png

screenshot2305.png

screenshot2311.png

screenshot2313.png

This view, and eventual image from Skylab of Columbia approaching is the cover on almost every major American newspaper the next day. The camera which took the photo sits on an arm attached to the Tranquility module. It was installed on an EVA a few weeks prior and carries the official name of "Shuttle Approach Inspection and Observation Camera," or SAIOC. I know, it's quite the acronym. It was installed for this specific purpose of observing Shuttles as they approach the station to dock.

screenshot2315.png

In terms of Columbia's payload on this mission, she carries the Freedom Module itself, and the second Shuttle Station Logistics Module, or SSLM-02. It is nicknamed "Jefferson" after Thomas Jefferson. You know him, writer of the Declaration of Independence, and third president of the United States. This continues the traditions started with SSLM-01, which was nicknamed "Washington" after George Washington.

screenshot2318.png

The crews of Columbia and Skylab greet each other in the Destiny module, as is becoming a tradition. Followed with a press conference in which they chat with President Jimmy Carter. They will work together for the next week, and perform multiple spacewalks.

On Day 2, the astronauts begin the installation of the Freedom module. This will be the biggest test for the Canadarm thus far. It is an incredibly difficult maneuver to place Freedom on the zenith port of Union, but it is a doable operation. It will require patience and precision from the Canadarm operator.

screenshot2322.png

Now locked onto the P/D fixture of Freedom, it is go-time. Until it isn't.

It is discovered that the Canadarm isn't fully latched onto the P/D Fixture, and it is barely hanging on. An EVA confirms this, and there are several unsuccessful attempts to reseat the fixture and latch it fully.

screenshot2324.png

However, it's nothing a little brute force can't solve! The Canadarm is moved back, and with some astronaut help, it finally latches onto the P/D Fixture properly. Now it's go-time. The Canadarm begins to gently lift the Freedom module out of Columbia's payload bay.

screenshot2327.png

If deploying JUO was a surreal experience for the astronauts, I don't know what this is. It's just purely magnificent. Humanity has come so far in space exploration in such a short time.

2 hours later the Freedom module is securely docked to the zenith port of Union, and operations begin to ensure the connection before the hatch opens for the first time.

screenshot2328.png

The hatch is opened for the first time on Day 3, and the crews begin setting up the interior of the module. Day 4 sees a spacewalk to install hardware on the outside of the module.

screenshot2330.png

Skylab's assembly is now roughly 50-60% complete, assembly will soon speed up, the S1 truss is expected to be delivered in August, and the S2 Truss, which carries the double solar array, being launched aboard a Saturn III (necessary due to the sheer size of the S2) sometime in December-January.

On Day 6, Columbia performs a reboost of Skylab to help it maintain its orbit. This is a helpful capability the Shuttle has. Although the CSM can also technically do it without over-stressing the station's structure because CSMs going to Skylab use the lower thrust LMAE engine.

On Day 7, Columbia departs Skylab, a highly successful visit by the Shuttle has concluded.

screenshot2333.png

Columbia de-orbits once more, targeting another landing at the Cape.

screenshot2336.png

screenshot2338.png

screenshot2342.png

"Gear down..."

screenshot2343.png

"Main Gear Touchdown! Nose gear coming down..."

"We have nose gear touchdown! Columbia applying the brakes now to come to a full stop."

"Wheel stop, fantastic flight Columbia."

screenshot2344.png

Columbia comes to a stop on a beautiful summer morning, as her second voyage to space is concluded. She has really shown the value of the changes made. Costs for Columbia's first 2 launches were less than the last to launches of Enterprise by 10%. Although the Saturn-Shuttle still takes immense criticism for its high costs overall. That continues to be the leading factor in its early retirement and the transition to the new SRB-based launch system for the Shuttle.

Columbia will fly again in the fall on STS-7, before Enterprise returns to space on STS-8. Overall the Shuttle continues to fly well, but the critics won't stop talking, and they probably never will. It will take much more time for the Shuttle to truly prove itself and deliver on its promises, if it ever can. NASA is hoping the launch system switch will be the key to that. For now, Columbia returns to the OPF, and stacking for STS-7 is already underway.

A note for between STS-5 and 6, the last Atlas-Agena launches from Vandenberg Air Force Base in California, carrying Seasat, which is itself built upon the Agena upper stage that serves for the mission. Vandenberg is a place the DoD hopes the Shuttle can eventually launch from, to carry it's most classified payloads to orbit. But that isn't expected to be a reality for many years. Seasat is demonstrating a very exciting technology: Synthetic Aperture Radar.

Seasat will use this for remote sensing of the Earth's oceans, and give us great insights into the most unexplored place on Earth.

screenshot2364.png

screenshot2369.png

Revolutionary technologies are pushing humanity's capabilities in space ever further. What was once seen as science fiction has become a reality. NASA's public support base, while at times this decade has been shaky. Has been revived by the magic of the Space Shuttle, and even minor things such as Seasat have gotten a solid amount of public attention. It is a world in which people are becoming more and more aware of spaceflight and space exploration. With our eyes turned skyward, we hope to continue to do great things on Earth and above it.

 

Начато производство конструкционных экспериментальных изделий для ВКК.

Link to comment
Share on other sites

Shuttles, Shuttles, and Wait... The Saturn IG??

It wouldn't be long after STS-6 that Columbia would fly again. In early October she would roll out once more for the launch of STS-7. This is the second classified Shuttle mission. For STS-3 there was much speculation on what the Shuttle was carrying, and it turned out to be some standard reconnaissance satellites. But this time there is definitely reason to speculate. Security was extra tight,  Instead of after S-IC separation, tracking shots from everyone but the military was to end 30 seconds after liftoff. The crew is also entirely a group of Air Force astronauts which NASA trained. In fact it's so classified no images were ever taken of it. And any audio has been stuffed on tapes stuffed in boxes stuffed on a shelf stuffed in a room stuffed in the Pentagon, or some other Department of Defense location.

In terms of launch activities, this was a more... chaotic adventure for America's Space Shuttle. Originally intended to launch in mid-September, until it was discovered a bird had made one of the Gaseous Oxygen Vent Arm's vent pipes it's new humble abode. Which was a rather funny, and slightly embarrassing turn of events for NASA. The Shuttle had to be rolled back as the location couldn't be accessed on the pad. The bird was almost certainly not happy about its home being taken 4.2 miles back to the VAB. But that's what happens when you don't pay your rent on time. The nest was removed but the bird itself never found. While in the VAB there was also some work done to fix a very loose LOX fill/drain valve seal on an S-IC swing arm. Once these issues were fixed, another rollout back to 39B was underway.

After this chaotic series of events which the press had a field day with, STS-7 was finally ready for launch.

MISSION OVERVIEW: STS-7 |

Commander | Carl Jenkins

Pilot | Ronny Lenwood

Mission Specialist 1| Mark Harson

Mission Specialist 2 | Joey Ingle

OV-102 "Columbia"

Objectives: Perform Classified Mission for the Department of Defense

October 9th, 1978: The Launch of STS-7

"LIFTOFF! Liftoff of the Space Shuttle Columbia on a mission in partnership with the Department of Defense!"

screenshot2378.png

screenshot2379.png

screenshot2380.png

With some standard updates through the rest of ascent, Columbia powered her way to orbit. Beginning what is considered the most secretive Shuttle mission ever. What did it deploy? Nobody really knows. There are only guesses.

screenshot2408.png

screenshot2412.png

screenshot2415.png

But what is known is what it has cost NASA in dollars to get Columbia ready for flight. An eye-watering 219 million dollars (equivalent to about 1 billion today,) which is a scary total for a launch system that is supposedly cheap. This is the problem NASA is facing, and it's why the switch to the SRBs is happening so soon. The Saturn-Shuttle could drain NASA's funding for decades if it continues. While it has given a head start to the program, it might have not been worth it. While it is an incredible feat of engineering, it just isn't sustainable. With Advanced Apollo costing so much money as well, it has squeezed every other program to the bare minimum. Skylab is going to start a "skeleton rotation" once its assembly is complete, and any additional modules past the Aft Module Block have to be canned.

There is some painful irony in this whole situation. NASA's excessive and extraordinary spending has resulted in it backing itself into a corner. While the Shuttle is still seen generally favorable, with these cost reports getting out, the mood is beginning to swing. What is NASA really contributing to the American public?

What is NASA really contributing to the American public?

With this daunting question on the minds of the nation, and NASA itself, all they can do is press forward with Shuttle launches. Columbia's inaugural 3 launch streak has concluded, and it's time for the troublemaker to return to Space. Enterprise is preparing for the launch of STS-8.

But first! There were some earlier events to cover.

First off, in late July, the first Europa III launches Magnetic Fields Explorer, a spacecraft whose purpose is in its name, to explore the Magnetic Fields around Earth and its interaction with the Sun's magnetic field.

screenshot2484.png

And secondly, our old friend the Saturn IG has gotten a refresh! NASA has now introduced the Block II upgrade of the Saturn IG. Which includes quite a few upgrades. Most notably the replacement of the J-2S with the RL-20 P3, which is a new engine that was technically funded by Advanced Apollo, but the Saturn IG and Skylab can conveniently borrow it, right? This engine is without a doubt the most advanced upper stage engine built to date, and it leans on experience gained in the development of the SSME. It is a staged combustion cycle engine, which gives it an incredible isp, around the RL10, while having similar thrust to the J-2S. It is truly a wonder engine. The manufacturer, Pratt & Whitney, is incredibly proud of this engine, and they should be. For the rest of the rocket, the copper coating was removed from the first stage, and replaced with a stylish Saturn V-esque tracking pattern. Spray-On Foam Insulation (SOFI) was also added to the second stage, as a cheaper insulation for the cryogenic Liquid Hydrogen. This not only slightly improves the rockets capabilities, but also reduces the cost. This first launch of the new Saturn IG Block II will carry the S1 Truss to Skylab, which is the central truss of the total 3 on the station. Due to this truss being launched in the middle, and being in the middle, Skylab will be in an unusual configuration until the final truss, the S2 Truss, launches in December.

screenshot2520.png

(hey this is when I finally got the updated BDB parts!)

screenshot2531.png

Like I said, unusual configuration.

Well now it's time for the launch of STS-8, every single engineer at the KSC is praying to God something important isn't in need of replacement when Enterprise returns. 

STS-8 is similar to the last flight of Enterprise, except, half?  This is the first Spacelab mission, which is just one of the Spacelab modules, for this it's the Big Module. This was originally supposed to be the last Saturn-Shuttle mission, but it's been pushed to STS-9 due to delays with setting up 39A.

MISSION OVERVIEW: STS-8/Spacelab-1 |

Commander | Robert Crippen

Pilot | Gordon Fullerton

Mission Specialist 1 | Robert Overmeyer

Mission Specialist 2| Richard Truly

OV-101 "Enterprise"

Objectives: Perform research in orbit on the Spacelab-1 Mission.

November 10th, 1978: The Launch of STS-8

"WE HAVE A LIFTOFF OF THE SPACE SHUTTLE ENTERPRISE, ON A MISSION TO CONDUCT SCIENTIFIC RESEARCH IN ORBIT!"

screenshot2576.png

screenshot2578.png

screenshot2580.png

screenshot2581.png

screenshot2583.png

Some might miss the spectacle of the Saturn-Shuttle. There is no doubting how magnificent it is to watch ascent into orbit. Truly a marvel of engineering, but a costly one nonetheless. 

STS-8 was somehow even more boring than STS-4, which is very hard to do considering they're very similar missions. But in a way isn't a mundane spaceflight a good thing? It shows how its becoming regular, how casually we're now doing science in orbit of the Earth.

Enterprise de-orbits 4 days later, after a successful mission of research.

screenshot2591.png

screenshot2593.png

screenshot2594.png

screenshot2597.png

As we head towards the end of 1978, there is but one more Saturn-Shuttle mission left. Oh how quickly it rose, so soon it fell. It is a cautionary tale that NASA must learn from if it wants to survive the continuing budget slide. Low cost and sustainable operations are necessary. But once Saturn-Shuttle is out the door, who would be next in jeopardy?

Advanced Apollo.

Отчеты о финансировании орбитального аппарата VKK оптимальны.

 

Edited by track
Link to comment
Share on other sites

  • 2 weeks later...

The (Last) Last Dance

Rolling out at 12:04 AM, Columbia heads to Launch Complex 39B for the final flight of the Saturn-Shuttle. In its short career, it captured the hearts and minds of the American public. An awe-inspiring vehicle of peculiar design. Unfortunately it was never meant to last. The high costs of the S-IC boost stage and legacy Saturn support hardware drove launch costs higher and higher with each mission. NASA hopes to end this uncontrollable increase with the switch to the new Thiokol Solid Rocket Boosters, and fixed pad infrastructure. There will be a break in between STS-9 and 10 as final preparations and testing is completed.

Upon arriving at 39B on December 5th, there was a pleasant surprise as a Saturn IG rolled out to Launch Complex 39C for the launch of Skylab 9. This will be the first launch from 39C, and will occur 2 days before the launch of STS-9. Although the whole Launch Complex isn't fully completed, the pad itself and the necessary launch infrastructure is ready to support a flight. Which saves Skylab 9 some time from waiting on STS-9 to clear 39B, which is the only active launchpad at the KSC.

Before all of this however, the final component of Skylab's truss was launched. The S2 truss, carrying the double solar array, was launched aboard a Saturn III. This massive component will over double Skylab's power production abilities, and give it the signature "asymmetrical" look seen in the Skylab 80 design.

screenshot2604.png

A picture perfect launch from the Saturn III, and 26 hours later, the S2 truss is ready for docking to Skylab.

screenshot2611.png

screenshot2615.png

It will take over 2 hours for the S2 truss to fully deployed, but it will be well worth it.

screenshot2617.png

screenshot2618.png

screenshot2620.png

A monumental step in the assembly of the world's first modular space station. The Skylab 80 plan is truly taking its final form. With the addition of the S2 truss, a spacewalk is performed to close and retract Prosperity's solar arrays, as they are no longer needed. It is a sign of how Skylab has grown to become so much more than just the Orbital Workshop itself. This is truly a station for the future. A station which NASA predicts could serve into the 1990s. But there is still more to be added to the station. The Rear Module Block is all that remains in the assembly of Skylab, it will provide more habitation, laboratory and logistics space, and a new place for the Shuttle to dock.

Just over 2 weeks later, Skylab 9 is launched to Skylab. The station's new look captured by footage the astronauts recorded during the docking approach.

screenshot2678.png

screenshot2685.png

Now, for the main event.

Pre-launch activities were unusually mundane, but I mean how can you top a bird nest causing rollback? The usually troublesome Mobile Launcher behaved itself during fueling rehearsals, and a pre-launch press conference laid out the mission plan.

MISSION OVERVIEW: STS-9 |

Commander | Phillip Chapman

Pilot | Karl Henize

Mission Specialist 1 | Joseph Allen IV

Mission Specialist 2 | Robert Parker

OV-102 "Columbia"

Objectives: Deploy the Skystar G Communications Satellite

Although notable as the last Saturn-Shuttle flight, STS-9 is also notable as the first commercial Shuttle mission. Now who would put their communications satellite on Saturn-Shuttle? Skystar Communications would! Based out of Pasadena, California, Skystar could've launched this on Titan, or Atlas, or Europa. But they wanted some marketing, and what's a better marketing opportunity than the final flight of the Saturn-Shuttle? Did they overpay for this flight? Absolutely! But never underestimate some good PR. Skystar G itself is a very top-of-the-line communications satellite, and is an example of the great leaps forward commsats are taking in this day and age. 

On an absolutely beautiful early December morning, the mighty S-IC stage prepares for its final ride.

screenshot2688.png

"T-15, Guidance is internal."

screenshot2692.png

"T-12, 11, 10, 9... IGNITION SEQUENCE START."

screenshot2693.png

"SEVEN."

"SIX."

"FIVE."

"FOUR."

"THREE."

"TWO."

"ONE."

"ZERO."

"ALL ENGINES RUNNING."

One last ride.

"LIFTOFF! LIFTOFF OF THE SHUTTLE COLUMBIA! ONE LAST TIME ATOP THE SATURN ROCKET!"

screenshot2694.png

"Roger Roll, Columbia!"

screenshot2695.png

screenshot2696.png

"We have staging."

screenshot2698.png

screenshot2700.png

"Good ET sep."

screenshot2702.png

That's the final ascent of Saturn-Shuttle. Just as awe-inspiring as the first on STS-1. But NASA must move on to a better era for the Space Shuttle. One in which there is hope it can actually meet some of the lofty promises they sold it on. The third Space Shuttle, now officially named Challenger, is nearly complete. Converted from a structural test article, STA-099. It is now known as OV-099, keeping its test article number but officially getting the Orbiter Vehicle designation.

Back to STS-9, it is a 3 day mission, so the crew will get home just in time to spend Christmas with their families. Day 1 is spent on 2 instruments in the back of the payload bay, these are the 2 external science experiments for STS-9, one is a magnetometer, which will be used to study the magnetic field environment in Low Earth Orbit, and the other is a Gamma Ray Spectrometer. These devices are onboard for the Low Earth Orbit Environment Study, a joint collaborative project between NASA, ESA, and several science organizations around the world to study the environment of Low Earth Orbit. Many LEOES instruments are onboard Skylab, and the data from the Shuttle can be cross-referenced with that from Skylab.

screenshot2709.png

On Day 2, Skystar G is deployed.

screenshot2724.png

Day 3 is spent on research activities, and Return to Earth.

screenshot2725.png

screenshot2726.png

In a moment of slight panic, Columbia's glide comes up short due to a small error during the high altitude descent, but thankfully she can easily divert to the Cape Canaveral Skid Strip for a safe landing.

screenshot2728.png

screenshot2729.png"

"Gear down."

screenshot2731.png

"100 feet."

"50."

"25."

"10."

"5."

"Main Gear touchdown!"

"Columbia rotating downwards."

"Nose gear touchdown!"

"The Shuttle getting on the brakes now."

"WHEEL STOP!"

"Welcome home Space Shuttle Columbia, and the crew of STS-9!"

screenshot2733.png

Stopped.

The Saturn-Shuttle program is at an end. After 9 incredible flights which have kicked off NASA's new era with the Space Shuttle, it is time to move on. It leaves many with mixed emotions. The Saturn-Shuttle is an incredible vehicle, but there is newfound hope and optimism with the coming changes to the STS program. There will be a break in flights until the spring of next year, when Enterprise will kick off the new era of the Space Shuttle on STS-10.

Some notes to end 1978:

On December 9th, Grumman's SSV launches the Magnetic Boundary Explorer spacecraft.

screenshot2628.png

screenshot2629.png

screenshot2634.png

screenshot2635.png

On December 15th, Proton launches... something.

screenshot2654.png

And earlier in the year, NASA and JPL established the Jupiter Follow-On Program. Which will build a successor spacecraft to Perdix as the next Jupiter orbiter. NASA is mainly focused on preparing the Iapyx Saturn Orbiter for its launch in 1980, but this program hopes to launch in 1984.

1978 has been an incredible year for spaceflight. Although it didn't see a launch to the Moon, it has seen a lot of important steps for the future be taken. While NASA may find itself in a precarious situation, the Shuttle serves as some great PR, and establishing more scientific programs helps to boost the public's awareness of spaceflight and science.

WFUO успешно стартовал на борту ракеты "Протон".

Link to comment
Share on other sites

New Year, New NASA!

1979 is the final year of the 70s, and what a decade it has been. So much has changed in culture, politics, and space exploration. This final year of the decade will be pivotal in determining NASA's future. Advanced Apollo is set to debut this year, with its first mission: Apollo 26. NASA decided to continue the Apollo naming scheme for the foreseeable future, with the program's future in doubt. The big news at the start of the year is the switch from Saturn-Shuttle, to the new Thiokol Solid Rocket Boosters. Shuttle launches will look much different from now on, these powerful boosters will help propel the Shuttle into a new age of sustainability and a higher launch cadence. Upwards of 6 launches are planned for this year, despite the planned late start. Despite this, In January, NASA makes a shocking announcement. STS-10 and 11 are cancelled. STS-11 was a mission to Skylab, and has been bumped to STS-12. NASA needs more time to prepare and certify the new infrastructure at 39A, which has caused some delays. Simply a minor setback however, this will not deter NASA from moving forward with STS-12, slated for April/May. The final SRB certification test took place last summer, and the 8 individual segments have all been delivered to KSC.

There was more than just work at 39A to prepare for the new Shuttle. The VAB has been incredibly busy the past 2 years. High Bay 4 has been activated from its storage purpose to a proper assembly High Bay. Set up currently for handling ASLV rockets. High Bays 1 and 3 were kept for Saturn-Shuttle, and are now undergoing conversion. High Bay 2 was completed in its conversion to the new Shuttle VAB infrastructure last autumn. Now the stacking of these SRBs commences in that High Bay. NASA is also taking this time to perform less... exciting... activities.

Crawler Transporter-2 is loaded with some heavy weights, and over the course of 3 days re-conditions the entire crawlerway to handle heavy loads. The main importance here is conditioning the crawlerway between the main straight, the 39B turn, and then the turn to 39C. Where the mighty Saturn A07 will take its path to 39C later in the year. The Saturn A07 is an absolute beast of a rocket. In excess of 20 million pounds of thrust, and by far the heaviest rocket ever. 39C and 39D have been built much beefier than A and B specifically to handle this massive rocket. More reinforcement, a better flame trench to spread the exhaust plume better, and a wide spread Sound Suppression Water System. The Saturn IG which solely uses 39C at the moment may not utilize this facility to its fullest extent, but you can be sure it can't leave a scratch on this monolith.

NASA survived a rather... politically tumultuous 1978. The agency enters the new year with a positive outlook, but lingering concerns that can't be ignored. They simply cannot deny the ever-increasing costs of Advanced Apollo, which is weakness in the otherwise strong armor of America's space agency. Every outside interview given can't help but pounce on such an... in all honesty good question. But a very tough one for the unfortunate employee sent to answer these questions. The best answer that NASA has given was the following:

"We understand the concern's presented by the public over the high cost of Advanced Apollo. It is something we at NASA aren't exactly happy about either. We've often discussed this in meetings and conferences and its something that we're actively attempting to find a solution to. For now though we continue to push forward with the program."

That was given by NASA Administrator Robert Frosch. Frosch was chosen to replace James C. Fletcher after his departure from the agency in 1977 to pursue other opportunities. Frosch has done what he can to ease the agency into this new era in a very uneasy time for everyone involved. It is simply the position NASA is in. Externally things look great, but internally they're stuck between a rock and a hard place. Cancelling Advanced Apollo would be messy, a PR nightmare, and only halt lunar exploration for a solid half-decade at the least. Continuing doesn't fix the problem, but at least it gives NASA time to (as comfortably as it can) evaluate the situation and make a path forward.

Fresh criticism of NASA hasn't been very pleasing. Critics of the agency have (fairly) pointed out that NASA allowed itself to get into this position. Nobody recognizes this more than the agency itself. The "Budget Squeeze" as it has been termed basically forced them to recognize it. This battle between Congress and NASA had to an extent always been there. Avoiding a messy and expensive adventure in Vietnam simply kicked the can down the road. The 1973 Oil Crisis, and the ensuing "stagflation" made the can unable to go any further. This budget shrink was the best way Congress could curb NASA's expensive tastes. But it had an unintentional side effect. Putting the clamps on NASA's budget did slow them down and make them carefully consider what they funded and approved. It also made NASA realize the grim future ahead if it didn't make changes eventually. How long would it be before the budget was so small they could no longer afford to send astronauts to the Moon? How long before it was limited to Low Earth Orbit, unable to truly reach its highest capabilities. Eventually killing the real dream. Landing humans on Mars.

You might call it a "wake-up call" of sorts, but NASA has realized the future ahead needs to be one where NASA alone is determining its future. The Shuttle is simply one key to the puzzle. Aris, and a replacement for Advanced Apollo, are the other necessary keys. Aris, in its new, somewhat unintended form, will be a foundation upon which the eventual Mars program can be laid, as I've said before. Advanced Apollo will continue with its planned "Exploration Phase" to start. But after that is incredibly uncertain. NASA will use Advanced Apollo to its fullest extent regardless. A big budget program has its perks. NASA can adequately test things that would otherwise be difficult to. The Lunar Transfer Vehicle is one, not only will Aris benefit from this, but a future Moon program will as well. The LTV is problematic in a lot of ways but it is also a necessary rough start to refine and improve nuclear transfer vehicle design. The ALSM is about the only part that NASA intends to keep 100%. It is a marvelous lander. The only problem though is reusability. It can't be reused. That will have to be worked around, as each ALSM unit is by no means cheap. But it's a fantastic lander with incredible capabilities.

The ASLVs find themselves in an awkward position as well, their fates not decided upon yet. The A02 itself isn't all that expensive, but it has very limited use cases. What it was once envisioned for is now just a footnote in space exploration history, so it will likely only see limited use. The A07 will be a critical part of Advanced Apollo, but each unit of this mega rocket comes at a hefty price. About 365 million dollars per launch (1.5 billion today). Thankfully the LTV is reusable, so regardless only one A07 will be needed for each Advanced Apollo mission, either to launch a new LTV or refuel a previous mission's. But adding in the cost of the Space Shuttle launching the crew and habitat, a Saturn III launching the ALSM. You end up at about 609 million dollars per Advanced Apollo mission (2.5 billion today.) That's not a cheap mission, but some might say it's justified for a several week "Lunar Expedition" which returns so much of scientific value.

This all piles up, which is why NASA is taking a new direction for the future, one that will hopefully lead to lower mission costs, and more missions overall. The robotic exploration programs have really taken a hit in recent years, the Iapyx Saturn orbiter having barely survived until now where it's guaranteed to launch. This is a major priority for NASA to undo and keep robotic exploration going and at a frequent rate. Without those brave little robots, we wouldn't have gone anywhere near as far in the Solar System as we have.

In terms of events beginning 1979. Good old Shuttle Pathfinder, everyone's favorite Structural Test Article, has appeared on the launchpad for the very first time. Not to go to space or anything, but to simply perform checkouts of the new infrastructure at 39A and ensure everything is certified for the upcoming STS-12 mission. 3 days were spent at 39A. A mock countdown, crew boarding test, and tests of the Rotating Service Structure (which will be used to load payloads into the orbiter) was conducted.

screenshot2776.png?width=1214&height=683

On February 9th, a massive development occurs. An operational testbed for Navstar GPS is launched aboard a Delta 3000 Rocket. Navstar GPS is an initiative from the US military to provide accurate location data for the armed forces wherever they may be on Earth. It is restricted to military use, but nevertheless an impressive development in technology.

screenshot2786.png

screenshot2792.png

Ah the US military, you and your extraordinary technological developments that you keep for yourself.

Never change.

Just a week later, on the 16th. Martin Marietta's Hercules rocket carries an Automated Resupply Vehicle to Skylab. Why not the Saturn IG? Well primarily because NASA needs to bridge the production gap between Block I and Block II, which is taking some time. Nevertheless this is a good way of showing how NASA cooperates with the American aerospace industry.

screenshot2807.png

1979 begins on some small but important launches and events. While conditioning the crawlerway may not be the most exciting of events, small steps like these are essential to the aerospace industry. 

 

.-- . / .. -. - . -. -.. / - --- / ... - ..- -.. -.-- / . ...- --- .-.. ..- - .. --- -. ... / --- ..-. / - .... . / -- .--. -.-. ... / ...- . .... .. -.-. .-.. . / .- ... / .- -. / .. -. -.. . .--. . -. -.. . -. - / -.-. .-. . .-- / ... -.-- ... - . -- .-.-.-

Edited by track
Link to comment
Share on other sites

New Rockets, Boosters, and Naming Schemes

A slow first few months of the year hasn't stopped anyone from continuing their paths of development. Most notably the people below.

The US Air Force. We all know 'em. They're a lovely bunch of high-flying jet piloting people. Despite conjecture and appended derogatory nicknames such as "Chair Force" they play a vital role not only in the atmosphere but outside of it as well. So important is this duty that the Air Force (and it's bosses at the Department of Defense) must select a fine group of launch vehicles to carry out classified launches of very classified spacecraft every so often. Keeping with the times is important to any government agency, but especially to the DoD. Fancy new military spysats aren't going to be very useful unless they have a reliable way to get into space.

So this year, the Air Force (and a totally non-existent agency known as the National Reconnaissance Office) has decided to update its existing contractual agreements to suit the upcoming "Next Generation" of military spacecraft. Future Launchers undergoes a major update into the adequately named "Next Generation Launch Services" program, or NGLS. Hercules and Valkyrie remain in the program, but the never ending problems of Atlas-Centaur Heavy have resulted in it being kicked out of the program, and replaced with something new.

screenshot2943.png

The unusual fully-hydrolox Polaris rocket from the coalition of North American Aviation, Rocketdyne, and Pratt & Whitney provides a fresh take on expendable rocketry. The XLR-129, once suspected to be a frontrunner for the Space Shuttle's main engines, has been given a new lease on life by this unconventional rocket. The engine is notable for it's "dual-mode" system, where the nozzle can extend once the rocket reaches higher altitudes, providing better performance in the later parts of ascent. Currently, the second stage uses a surplus J-2S engine provided by Rocketdyne, but there are discussions to replace it with the XLR-129 itself. 

This rocket, with the existing Hercules and Valkyrie rockets, will provide a plethora of options for the Department of Defense. Especially considering their disgruntlement with NASA and the Space Shuttle's flight schedule.

The DoD was a big supporter of the Space Shuttle during its early days. They saw extensive potential in a reusable spaceplane. Many times before they had tried their own schemes to get manned military missions, and the Space Shuttle with its civilian uses would be an excellent way to sneak in some special DoD missions. But NASA hasn't taken to this plan the way they would've hoped. The Shuttle has very clearly become a vehicle for non-military use. Although NASA is honoring its agreements with the DoD to launch some classified payloads, such as on STS-3 and STS-7. But to be fair, it is early in the program, and the DoD has recognized this and at the very least been patient so far. But they cannot rely on the Shuttle, at least for now. Which is why NGLS exists.

Speaking of the Space Shuttle, it is finally time to see the Orbiter and its new launch system take flight!

The SRBs were both fully stacked on the Mobile Launcher by late February, with the ET being joined between them on March 10th. Enterprise herself was then rolled over to the VAB on March 30th, and subsequently joined to the side of the stack. Rollout occurred on April 10th, with extensive time at the pad being allowed for tests and checkouts. This much simpler looking stack appeared from the back of the VAB out of High Bay 2 to much fanfare. With a crowd of several thousand people showing up to witness this roll to 39A.

The birds attempted yet another forced rollback, but thankfully the new infrastructure at 39A allows practically everything to be pad accessible, most notably the Orbiter. NASA can even replace SSMEs at the launchpad now. But that will likely never be needed. Their attempts foiled, the birds settled with watching the launch peacefully. A full tanking and de-tanking with the official countdown was conducted on April 18th. The crew had their first go with the "Dry" rehearsal on April 25th, a week before launch.

A pre-launch press conference was held on May 1st, the crew answered some question from the media. This is a very important mission in terms of astronauts, as this is the first flight of astronauts from Astronaut Group 8, which was announced in January of last year. They've been hard at work training to be ready for flight. STS-12 is a mission to Skylab, delivering the Skylab Airlock Module (SAM) and will fly with a crew of 5.

MISSION OVERVIEW: STS-12 |

Commander | John Young

Pilot | Robert Gibson

Mission Specialist 1 | Frederick Gregory

Mission Specialist 2 | Stanley Griggs

Mission Specialist 3| Rick Hauck

OV-101 "Enterprise"

Objectives: Visit Skylab station. Deliver supplies, and Skylab Airlock Module.

This will be John Young's second flight aboard the Space Shuttle. He has been serving as Chief of the Astronaut Office since 1974, but continues to be on flight status, because he's John Young.

STS-12 is notable as the first night launch of the Shuttle, so it will be double the spectacle for this inaugural SRB-boosted Shuttle launch.

Without further ado, the launch of STS-12.

May 2nd, 1979: A New Era Begins

screenshot2886.png

"This is Shuttle Launch Control at T-9 minutes and holding, we are preparing to release this final built-in hold, and proceed with the launch of Shuttle Enterprise tonight."

"3, 2, 1, mark. T-9 minutes and counting."

New countdown procedures were created with the changes to Shuttle launches, no longer relying on legacy Saturn countdown procedures.

"T-3 minutes and counting, final aero surfaces check now being performed."

screenshot2888.png

"The Gaseous Oxygen Vent Hood, or Beanie Cap, now retracting away to its launch position."

screenshot2891.png

"T-31 seconds."

"GLS is go for Auto Sequence Start."

"We have a go for Auto Sequence Start, the onboard computers of Enterprise are now in control of the countdown."

"T-12, 11, 10, we have a go for Main Engine Start, 7, 6, 5, 4, 3, 2, All Engines Up and Running!"

screenshot2892.png

screenshot2893.png

"1, ZERO, BOOSTER IGNITION AND LIFTOFF OF THE SHUTTLE ENTERPRISE! ON A VISIT TO AMERICA'S ORBITING OUTPOST ON A NEW RIDE TO ORBIT!"

screenshot2894.png

"Roger Roll, Enterprise!"

screenshot2895.png

screenshot2898.png

screenshot2899.png

screenshot2900.png

Well I wouldn't say that launch was disappointing. Not much can top a Saturn V launch but this certainly established an unusual but interesting launch and ascent to orbit.

screenshot2901.png

Enterprise spends Flight Day 1 catching up with Skylab, and approaches to dock on Flight Day 2.

screenshot2904.png

screenshot2905.png

screenshot2906.png

Enterprise's last visit to Skylab was nearly 2 years ago, and the station has changed quite a bit since then.

As a developing tradition, the crews meet in the Destiny module, and they speak with President Carter for about a half hour. On Flight Day 3 NASA holds a press conference with the crew of Skylab, which has grown to 9 with the arrival of the Shuttle. This will be the longest stay at Skylab yet, totaling 8 days.

screenshot2909.png

On Flight Day 5, the airlock is installed, with the docked ARV having to back up and stationkeep from the port while the installation takes place. The ARV is then re-docked to the airlock once the installation is completed.

screenshot2912.png

The Airlock is the final component left on Skylab before the Rear Module Block. The end of Skylab's assembly is finally in sight. With that in mind, NASA puts pen to paper, and officially makes its last order of Saturn IG launch vehicles. The final flight slated for 1980. NASA also makes its last order of Apollo CSMs and their accompanying Mission Modules to go along with this. The era of the Space Shuttle has truly begun, but what a sweet time it is to see these 2 major generations of American crewed spacecraft docked to the same station.

3 days later, Enterprise departs the station, concluding a successful second stay at America's space station.

screenshot2924.png

screenshot2926.png

screenshot2932.png

screenshot2935.png

screenshot2936.png

screenshot2937.png

Space Shuttle Enterprise comes to a stop at the Shuttle Landing Facility, her 6th mission, STS-12, is concluded. This mission marked the beginning of the new STS, one that would push the boundaries of what was possible, a rapidly reusable and cost effective spaceplane, delivering satellites and servicing space stations. Despite the criticisms of Saturn-Shuttle and Advanced Apollo, the Space Shuttle has quickly become an American icon. A symbol of national pride in a time where people are re-thinking what it means to be American.  The Shuttle is a centerpiece of an evolving American culture. Now that... is good PR.

Columbia was originally slated to fly the next mission in June, but due to more damage than expected at 39A from the launch of Enterprise, and an issue with one of the Flight Data Recorders on Columbia's SRBs, that flight has been pushed to mid-July. NASA has also taken this time to begin the implementation of its new mission naming system? But what do I mean by that? Well let me explain.

NASA sees the upcoming manifest, so many launches, and plans for West Coast Shuttles eventually. They see a problem. Mission names being numbers is going to get very confusing. Thus they've come up with an ingenious, perfectly overbuilt system. This new system gives real information about each mission, providing a key of sorts to identifying each mission. The identification goes as follows.

STS-21-C

The first digit indicates the fiscal year of launch, offset since the beginning of the Shuttle program. So 1979 being 2 fiscal years into the program gives missions within it a first digit of 2.

The second digit is launch location, currently 1 just means Cape Canaveral, but eventually there could be 2 or 3 for other locations like the West Coast.

The letter indicates the launch of the year based on that letter's position in the alphabet. So C being the third letter of the alphabet means this is the third launch of the year. Of course with NASA being NASA, this is never adjusted for delays or mission cancellations.

STS-21-C is the designation STS-12 carries, and NASA used this mission to test the waters of the new designation. NASA has referred to it as "mission 21-C" instead of "STS-12" to subtly begin introducing this new naming scheme.

With this new system NASA is set up for perfectly understandable mission designations, which totally won't confuse the press. 

Mildly unnecessary naming schemes aside, STS-12 STS-21-C is a massive step for NASA and the Space Shuttle program. Internal reports noted the much lower cost of the mission, a nearly 45% cost reduction compared to STS-9. Which is a great improvement off the bat, but NASA knows they can keep getting the price lower and lower. That is why NASA has officially set up the Saturn IG for retirement. Whether this turns out as planned is to be foreseen, but NASA's optimism has to mean something.

But NASA isn't the only one making changes.

 

В настоящее время мы считаем идеальным реструктурирование программы.

Link to comment
Share on other sites

A Lunar Return

As May turns to June, NASA is very focused on Apollo 26. Preparations began with the delivery of the major components to the KSC. The Habitat Module arrived first from Johnson Space Center, it would be stored until being integrated with the Shuttle once it arrived at the launchpad. Next up was the Lunar Transfer Vehicle, which came from Michoud in Louisiana. The nuclear engine it would use for propulsion was delivered to the facility from Los Alamos in January, and was integrated in March. The whole assembly was then loaded into the transport barge on March 30th, not without the presence of anti-nuclear protestors of course, and delivered to the KSC a week later. The Saturn A07 was already in stacking inside High Bay 4, with the boosters and core stage stacked as of April 15th. The LTV was moved to the new "Large Payload Processing Facility" and integrated with the massive fairing that would protect it during early ascent to orbit.

This was a delicate process, as several umbilical connections into the LTV were necessary in order to fuel it with Liquid Hydrogen while inside the fairing. The fairing therefore had to be heavily modified in order to accommodate this unusual payload. These modifications were first tested on their own with the launch of the NERVA Orbital Testbed, but the A07 fairing is a bit different to the one used for that mission. The main additions needed were a service access "door" of sorts that would allow technicians to get in the fairing and ensure connections were proper and in place. Proto-ladders were added to the insides of the fairing, and a harness rail as well. There would then be removable access platforms that would allow technicians to stand and ensure solid connections. On top of this there were the umbilicals themselves, primarily fuel lines, but also purge lines which would connect into the fairing swing arm which would route the hydrogen to the flare stack at the Launch Complex. Inspections of the umbilicals would be primarily done in the VAB, as it was considered too risky to be done at the pad with the lumbering MSS.

Speaking of the VAB, it too had to be modified to accommodate Advanced Apollo. The sheer height of the Saturn A07 meant a much taller Launch Umbilical Tower, which well exceeded the current maximum high bay height, even with the folding lightning mast. Thankfully, the VAB roof isn't exactly locked into place, and NASA had built it with the potential of raising the height being necessary. Therefore, while High Bays 2 and 4 were being converted for the new Shuttle work platforms and the ASLV infrastructure respectively, NASA had their side of the roof raised. This was completed last December, and only recently was a slanted structure added to go back down to the original height of High Bays 1 and 3. The VAB has this unusual "big forehead" look as some people have called it due to the modifications, but it was necessary for Advanced Apollo operations.

For High Bays 1 and 3, the latter would be preserved in its current state to accommodate the Saturn III. Otherwise there would be a massive scheduling chokepoint in Advanced Apollo missions. With all 3 necessary vehicles able to be stacked and prepared at the same time, this would be an incredible time saver. High Bay 1 would continue to be converted into a second High Bay for the Shuttle, allowing 2 simultaneous stacks, and technically 3 with one on the launchpad.

As NASA gears up for Apollo 26, the Shuttle Columbia takes flight on STS-21-D, carrying 2 SBCS satellites to orbit. These are very important satellites. They are pathfinders designed to test a new concept NASA has been working on. The agency likes to call it the Tracking and Data Relay Satellite, or TDRS (pronounced tee-driss.) NASA is very excited about this new program, as it will set up a group of satellites in Geostationary Orbit that will allow faster and better communication with missions in Earth orbit. The Space Shuttle is intended to launch these satellites, and will itself benefit greatly from them.

MISSION OVERVIEW: STS-21-D |

Commander | Richard Truly

Pilot | Anthony England

Mission Specialist 1 | James Van Hoften

Mission Specialist 2 | Robert Stewart

OV-102 "Columbia"

Objectives: Deploy pair of SBCS satellites, pathfinders of TDRS.

The Shuttle launches into the beautiful morning skies of Cape Canaveral on July 19th, 1979.

screenshot3011.png

screenshot3019.png

screenshot3020.png

screenshot3023.png

screenshot3026.png

screenshot3032.png

With this mission out of the way, the road is clear to prepare Apollo 26 for launch.

This will be the most complex mission NASA has ever undertaken. Requiring 3 separate launches of 3 very different vehicles, each carrying a crucial component of the mission. The new Shuttle, Challenger, will make her debut flight carrying the Habitat Module as the first launch. This will be followed by the Saturn III carrying the ALSM lander, and finally the LTV aboard the mighty Saturn A07. For just one day, all 3 rockets will occupy their launchpads at the same time, before the Shuttle launches the next day. This will require not only LC-39A and LC-39C, but also the new LC-39D, which is finally ready to support flights.

The Space Shuttle rolls out on July 31st, a full 20 days from launch, as time is needed to integrate the Habitat Module, and perform Challenger's Flight Readiness Firing, the first of its kind short duration SSME test to verify new Space Shuttles.

On August 15th, the Saturn III rolls out to LC-39C, with the ALSM lander enclosed within its fairing.

Finally, the mighty Saturn A07 rolls out of High Bay 4, thousands of people gather to see the largest rocket ever make its way to the launchpad for the first time.

In a lineup reminiscent of the old Missile Row, all 3 sit on the launchpad at the same time. A late night talk show host quips that night:

"NASA's dubbed this the new Missile Row, which if you don't know is what all of those small rocket launchpads down at the Cape are called, cause they were for missiles and they're in a row. Pretty self-explanatory right? But I feel like they should call this the Financial Mistake Row. Much more fitting don't you think."

The audience loves it, but NASA doesn't enjoy humor at its own expense. Shocking, I know.

Nevertheless, "Financial Mistake Row" or whatever you want to call it is short-lived, as the next day Challenger takes to the skies with the Apollo 26 crew and the Habitat Module.

MISSION OVERVIEW: STS-21-E |

Shuttle Commander | Philip Chapman

Shuttle Pilot | Joseph Allen IV

Apollo 26 Commander | Story Musgrave

ALSM Pilot | Robert Crippen

Mission Engineer | James Buchli

Mission Scientist 1 | Sally Ride

Mission Scientists 2 | Shannon Lucid

OV-099 "Challenger"

Objectives: Oversee assembly of Apollo 26 Lunar Operations Vehicle in orbit, deliver crew and supplies.

August 20th, 1979: A New Era of Lunar Exploration Begins

"Booster Ignition and liftoff of Challenger, beginning a new era of Apollo, and America's exploration of the Moon!"

screenshot3054.png

screenshot3055.png

screenshot3057.png

screenshot3061.png

This is one of the new additions to the Shuttle first flying on this mission. Dubbed the "External Tank Engineering Camera" or ETEC, it is a small set of 2 cameras which monitor the Shuttle's ascent from a very interesting perspective. It can look downwards, as seen in this image, and upwards. Although downwards is generally considered the more useful view.

download.png

Pro-tip: Don't point the ETEC at the Sun.

In order to dock the Habitat Module, it has to be deployed, and the Shuttle has to dock with it manually, using the same docking adapter used for docking to Skylab. This will position the module well for the arrival of the remaining components.

screenshot3070.png

screenshot3072.png

screenshot3074.png

If you're going to the Moon during Advanced Apollo, you're sure going to have to be patient. It will take over a week until the crew can depart for the Moon. This has led to STS-21-E being considered "the most boring" Shuttle mission to date.

5 days later, on the 25th, the Saturn III takes off from 39C, carrying the ALSM. 

screenshot3081.png

2 components down, 1 remaining. The most crucial.

Time to take back the throne.

screenshot3089.png

Since the inaugural launch of the N1, the Soviets have been able to brag about having "the world's most powerful rocket" with more thrust than the Saturn V. Not even the Block II upgrade could take back the title. But the Saturn A07 will over double the N1's total thrust. Finally taking back the throne of the world's most powerful rocket for the Saturn rocket family.

Time to break some records.

"T-15, Guidance is internal."

screenshot3091.png

"T-12, 11, 10, 9, Ignition Sequence Start, 7..."

screenshot3092.png

"Booster Ignition and liftoff of the Saturn A07, carrying the final piece of Apollo 26, to propel the mission towards the Moon!"

screenshot3093.png

The roar...

screenshot3094.png

The crackle of the SRBs...

The window-rattling power...

screenshot3096.png

To a low rumble...

screenshot3100.png

To silence.

Take that, N1.

In preparation for the arrival of the LTV, the Shuttle undocks and stationkeeps to observe docking, and be ready to dock again in case of an emergency. Thankfully the LTV docks without issue, and Apollo 26 is finally ready to go to the Moon.

screenshot3102.png

Challenger then de-orbits, and returns for a landing at the Cape.

screenshot3104.png

screenshot3108.png

screenshot3111.png

Safely back at home base, Challenger will head back to the OPF and prepare for her 2nd flight, later in the year.

NASA's focus now shifts to Apollo 26, and the incoming TLI maneuver.

Tension is in the air, but while everyone is incredibly nervous, all they can do is keep calm and do their jobs.

"3."

"2."

"1."

"Ignition."

screenshot3114.png

A nervous handful of minutes follow, until the NTR motor finally shuts down.

A good trajectory, but a small correction maneuver is necessary.

screenshot3116.png

After the mid-course correction, and a few days of coasting, Apollo 26 arrives at the Moon. Now under the callsign Adventurer. The naming convention for Advanced Apollo is much different, as in the early Apollo the CSM and LM would be individually named, but for Advanced Apollo, the crew will give their mission a callsign, which follows the lander as it is the crewed vehicle on the surface.

screenshot3125.png

The excessive heat problem of the NTR isn't fully worked around yet, but peak temperatures were lower this time.

It will take a total of 3 maneuvers to enter Low Lunar Orbit.

screenshot3130.png

Once in the final orbit, the crew transfer into the ALSM, and prepare for the descent to the lunar surface.

Upon undocking from the LTV, the crew prepare for the initial de-orbit maneuver, which will place them on target at the intended landing side on the interior border of Mare Crisium. This site was mainly chosen due to it having a lunar masscon, or mass concentration. This has been an interesting field of study for Apollo missions since the start of Phase 2, so any chance to study a location with one is a top priority.

The Initial Descent Maneuver, or IDM as it is called, begins exactly on time. This begins a truly tense time at mission control, but everyone must remain calm, and do their jobs. 

screenshot3131.png

(Note: The reason the ALSM looks different than what I've previously posted it as is because I re-designed it twice after this for both Apollo 27 and 28 until I settled on the design I've previously shown, which was used on Apollo 28. But just one more changed design before the final one after this!)

"Alrighty Houston, 20,000 feet passed."

"Copy that, Story."

"Throttle is good."

"Velocity nominal."

"IDM shutoff."

A tense few minutes pass, before the Landing Maneuver begins.

"LM startup! Not the lander!"

[chuckles] "Roger Adventurer, LM startup."

screenshot3133.png

"2,000 feet."

"Throttle curve is good."

"Keepin' her steady."

"1,500 feet."

"Smooth and steady."

"1,000."

...

"750."

...

"500."

...

"250."

...

"100."

"50."

"30."

"15."

"10."

"5."

"CONTACT. SHUTOFF."

"Houston..."

screenshot3134.png

"Adventurer is on the surface."

Mission Control erupts in cheers and applause. They'd done it. America was back on the Moon, after nearly 2 years away. Despite all of the criticisms of Advanced Apollo, it was a true necessary step to long-term and sustained lunar exploration.

screenshot3139.png

The crew spend a week on the surface. They are truly spoiled with all of the new fancy gadgets and gizmos that come with the enhanced abilities of Advanced Apollo. They attain samples from a much lower depth than previous missions were able to. This was done by utilizing the new "Deep Core Sampler" device, which burrows 15 feet down into the surface before collecting material.

Once this week of fruitful week of exploration is over, the ALSM ascends back to orbit to dock with the LTV, still in orbit of the Moon.

screenshot3147.png

The crew return, and transfer all of their samples into the Habitat Module. After a few hours have passed since docking, the LTV begins the Trans-Earth Injection, or TEI, maneuver.

screenshot3151.png

The thermal characteristics of the NTR are slightly better during the TEI maneuver, but they're still concerningly high. But it has several days to chill out before LEO insertion.

4 days later, the LTV performs 2 braking maneuvers. The first inserts the crew into a lower elliptical orbit, and the second into a proper Low Earth Orbit.

screenshot3154.png

screenshot3156.png

Upon entering LEO, the ALSM undocks to free up space for the return vehicle, and is commanded to de-orbit.

screenshot3157.png

The next morning, a Saturn IG launches on a quick rendezvous with an unmanned Apollo CSM to retrieve the crew.

screenshot3158.png

4 hours later, the crew are transferring their samples and equipment into the CSM, as well as themselves.

screenshot3168.png

The CSM then undocks, and de-orbits.

screenshot3171.png

This usage of the CSM is a one-time thing, as future Advanced Apollo missions will use the [REDACTED] provided by [REDACTED] to return the crew.

screenshot3173.png

screenshot3174.png

Now safely back on Earth, the crew of Apollo 26 are recovered by Navy vessels, and make their way back to the Cape upon returning to port and boarding a NASA charter plane. They are given a heroes welcome, with a parade held in New York City a week later.

Apollo 26 is concluded as a great success, boosting NASA's public relationship immensely. Apollo 27 is slated for late next year, which is one of the current downsides to Advanced Apollo. It cannot support a high flight rate of lunar missions. A successor program would hope to fix this, but nothing on that is certain at the moment.

What is certain right now, is that Advanced Apollo, despite its flaws, has given a new light of hope for the American people. With elections coming next year, and President Carter's popularity decreasing every month, the future of the nation is uncertain. But NASA remains a steady constant, giving the American people something to be proud of. They are first in space.

But will they be forever?

 

- .... . / ..-. .. .-. ... - / -- .--. -.-. ... / ..- -. .. - / .... .- ... / -... . . -. / -.. . .-.. .. ...- . .-. . -.. / ..-. --- .-. / -.-. . .-. - .. ..-. .. -.-. .- - .. --- -. .-.-.-

Edited by track
Link to comment
Share on other sites

Cryogenics, Lifting Bodies, and Christmas

The European Space Agency, or ESA as the acronym calls it. They are Europe's premier agency for space exploration (sorry UK) and have made impressive progress in their short existence. NASA has taken note of this, and with the push to cooperate with other Western nations, they have made a deal.

mpcsblock.png

Enter the Multi-Purpose Crew System, or MPCS. This funny little fella will serve 2 main purposes. The first is to be an "Emergency Crew Return Vehicle" or ECRV at Skylab. When the Shuttle takes over crew rotations at Skylab upon the retirement of the Saturn IG and Apollo CSM, there will be no way to return the crew in the event of an emergency. This is because the Shuttle can only stay docked to Skylab at maximum for 16 days, not the 200 of a standard mission at the station. This could be overcome with a "shelter" of sorts for minor emergencies for the crew to await the arrival of a Shuttle. But major emergencies may make this shelter useless. Therefore, the crew need a way to evacuate the station a moments notice, and this is where the MPCS will come it. The little lifting body will launch from Kourou, and dock at the station. Each MPCS is capable of staying in orbit long enough for 2 missions (400 days) and thus won't need to be replaced every mission, just every two. This will be especially helpful, and add a safety blanket for crews staying at America's orbiting outpost.

The second purpose is returning crews of Advanced Apollo missions. Apollo 26 was able to have a CSM return the crew, but with that spacecrafts retirement upcoming, all future Advanced Apollo missions need another method. The Space Shuttle could be used, but NASA thinks it has better things to do than just return a crew. Therefore the little MPCS, with its crew capacity of 6, is perfect for returning the 5 crew of Advanced Apollo missions.

The initial version of the MPCS is very much what you would call a "lifting body" with no wings of any sort. This initial version also only has a crew capacity of 4. But this "Block I" as it is called will be short lived, by the time of Apollo 27 ESA intends to have the upgraded "Block II" ready for flight, it has a slightly enlarged fuselage, an enhanced crew capacity of 6, and some stubby little wings, if you can even call them that. The MPCS is truly unique because of another component.

The paraglider.

Yes, the MPCS has a paraglider rather than a traditional parachute. Because it's a lifting body, with "lifting" being quite generous, the MPCS needs a paraglider to safely land on solid ground, which is an eventual goal for the spacecraft. ESA has its own ambitions with this spacecraft, it's not just a service to provide to NASA. They want independent manned spaceflight. This is what ESA has been working towards since its inception. While they are happy to work with NASA and continue to be valuable partners, ESA has ambition to do its own things as well. They want their own space stations, their own robotic exploration programs, maybe even their own lunar program. Like I said, ambition.

mpcsblock2.png

That major announcement aside, following Apollo 26 there is a plethora of activity.

On October 10th, Shuttle Enterprise takes flight on a classified mission, STS-21-F. The crew consists of 5 astronauts, on a 6 day mission of unknown purpose.

screenshot3194.png

screenshot3196.png

What the public doesn't know, is that Enterprise is carrying the most advanced Signals Intelligence Satellite to date. Also the most expensive one.

Enterprise is also carrying another payload, codenamed Waterfall.

screenshot3206.png

On the 5th day of the mission, this super SIGINT satellite, known as Perseus B, is deployed.

screenshot3211.png

Enterprise de-orbits the next day for a landing at Cape Canaveral.

screenshot3214.png

screenshot3216.png

screenshot3217.png

screenshot3218.png

screenshot3219.png

Enterprise is expected to flight 2 more times before being taken to Palmdale for her first Orbiter Maintenance Down Period. But that won't cause much problem for the manifest...

Hello, OV-103.

screenshot3040.png

screenshot3043.png

OV-103, named Discovery (after HMS Discovery) is the fourth Orbiter to be built, and her first flight is about 3 months away. Originally intended for delivery in August, some issues had to be worked out and thus she was kept at Plant 42 until now in mid-October. Her first flight will be at the start of next year, launching the Iapyx spacecraft and its transfer stage that will boost it on a trajectory to Saturn. That will be the heaviest payload the Shuttle has launched thus far, nearly maxing out the possible payload capacity.

The next 2 months will be spent preparing her for spaceflight before being rolled over to the VAB for stacking.

In November, the Perdix spacecraft takes some time to fly by the largest Moon in the Solar System, Ganymede.

screenshot3223.png

The first attempt at a flyby was called off due to a propulsion issue, but the next attempt is a bit more than a week later, and all goes well setting up the spacecraft on a low flyby trajectory.

As Perdix closes in, fascinating readings come from the magnetometers of Perdix.

Ganymede has a magnetic field.

But how? This puzzles scientists, and potentially indicates that the core of Ganymede isn't solid.

But that's only the start.

screenshot3225.png

Readings from other instruments and more depth to the story. Some data hints at cryovolcanism and the potential of a subsurface ocean.

Looks like Europa isn't alone.

screenshot3228.png

Jupiter rises back above Ganymede, as a very fruitful flyby comes to a close.

screenshot3230.png

A few weeks pass, and scientists are given some time to fully process the discoveries. Ganymede is certainly a very interesting Moon, and is seen as a primary objective for future missions.

On December 2nd, MPCS takes its first flight. This is a test flight which will dock with Skylab, and bring around 800kg of supplies.

screenshot3237.png

screenshot3241.png

screenshot3243.png

The MPCS has to use the Shuttle's docking adapter for this flight. But the next module of Skylab is launching very soon, and is where the MPCS is intended to dock normally.

But this module isn't being brought by the Shuttle.

Polaris will be the first commercial rocket to launch a Skylab module.

Due to scheduling conflicts, NASA chose the Polaris rocket to launch the next Skylab module: the Primary Logistics Module. The PLM is small enough for POlaris to launch it with an Apollo SM tug, and can do it on time, so NASA put pen to paper and made a deal.

screenshot3248.png

Although the SM tug did have to use some of its propellant margin to finish out orbital insertion. So uhh, maybe a risky decision?

screenshot3251.png

Following the installation of the module, the MPCS relocates to the docking port on top of the PLM.

screenshot3255.png

Now, to close out the year, NASA has a very important mission lined up.

After a minor schedule kerfuffle, STS-21-H is bumped into STS-31-A, and the original 31-A mission is canned, Enterprise is also send to Palmdale early to begin OMDP 1. This leaves Challenger to fly STS-21-G and finish the Shuttle manifest off for the year.

STS-21-G is incredibly important, as it is the second Spacelab mission with a very unique goal. In the back of Challenger's payload bay are some spheres. Rather unsuspecting, but they're carrying liquid hydrogen, To fuel these required a minor modification of the umbilicals already placed on Challenger's payload bay for fueling cryogenic stages, such as Centaur, which are planned to eventually fly on the Shuttle. Those will have their own umbilical arm however, these are just fueled through some modified hoses attached to the TSMs. Regardless they are going to be demonstrating cryogenic fluid transfer in space, which is essential for reusing the LTV on Advanced Apollo, and fueling larger nuclear transfer vehicles that are too heavy when fully fueled to be launched with all of that fuel. This is a massive technological leap that is necessary to deep space operations, and also Earth orbit operations in some cases. Therefore, this mission means more than just refueling lunar tugs.

MISSION OVERVIEW: STS-21-G/SPACELAB-2 |

Commander | Gordon Fullerton

Pilot | Donald Peterson

Mission Specialist 1 | Guion Bluford Jr.

Mission Specialist 2| Kathryn Sullivan

OV-099 "Challenger"

Objectives: Demonstrate Cryogenic Fluid Transfer, study the viability of Hydroponics in space.

As the objectives state, this mission also has another very important focus. Hydroponics is a type of horticulture which grows plants without soil by using water-based mineral nutrient solutions in an aqueous solvent. This would be very useful for spaceflight, as bringing up a bunch of soil is kind of annoying. If hydroponics is a viable method of growing plants in space, then it would majorly improve the lives of deep space mission crews, by allowing them to eat freshly grown crops.

With a load of science to be done, STS-21-G takes to the skies on December 10th, 1979. Hoping to be home by Christmas.

"Booster Ignition and LIFTOFF of the Shuttle Challenger on Mission 21-G, carrying Spacelab and the Cryogenic Transfer Experiment!"

screenshot3263.png

screenshot3266.png

screenshot3268.png

screenshot3271.png

Due to hydrogen not liking to stay a liquid, the Cryogenic Transfer Experiment is the first priority upon reaching orbit. The crew are going to study 3 methods to transfer LH2 between the spheres. The first is using ullage to shift the liquid physically between spheres. The Shuttle can't do this the best but a refueling module docked in front of a nuclear transfer vehicle could do this much easier. The second is using pressure differentiation. Since pressure loves to flow from high to low, by lowering the pressure in an empty sphere and opening it up to a higher pressure full sphere, this could transfer propellant between the spheres with no fuel expenditure, all you would need is a way to re-pressurize the tank. The third method is using a pump to... pump the liquid into an empty sphere. These 3 methods are studied over the course of a day.

The pump system quickly proves to be tricky and unreliable, so it is written off after a few tries. Despite the Shuttle's difficulty with the ullage, the method itself remains very promising and the crew see results after several attempts. The same goes for pressure differentiation, which seems to consistently transfer the fluid between spheres.

With promising results recorded, NASA will decide on what to do when attempting a refueling demo on the Apollo 26 LTV. This is a new decision made, and the LTV will be de-orbited afterwards. So Apollo 27 will still need a new LTV. NASA sees this as a better plan to not risk an entire Moon mission on the success of undemonstrated refueling.

With that out of the way, the crew dedicate the next 11 days of the mission to being space farmers. Although it is on a very small scale and over a short amount of time. Hydroponics proves to at least work in space. The tested plants are cabbage, peas, and onions, and they show a solid amount of growth for the time given. The crew carefully monitor their growth, as the plants will continue to be grown back on Earth once the Shuttle returns. This will allow for comparisons between their growth in space and growth on Earth. Giving further insight into potential difficulties with growing crops in space.

On the 24th, the crew share a teleconference with their families before re-entry. NASA specifically made the mission 14 days to get the astronauts home for the last Christmas of the 70s. So on this final day of the mission, Challenger de-orbits, to return for a landing at Cape Canaveral.

screenshot3275.png

screenshot3276.png

Re-entry goes smoothly, and visual contact is acquired shortly after communications resume.

"Houston Challenger! Hope you didn't exchange gifts without us,"

"Wouldn't do that to you. Although some of 'em are getting a bit impatient."

"We'll try and sit 'er down as quick as we can, Houston."

"Roger that."

screenshot3277.png

screenshot3279.png

screenshot3281.png

screenshot3282.png

screenshot3284.png

Just in time for Christmas, Challenger comes to a stop on the Shuttle Landing Facility on Christmas Eve morning. The Shuttle once again had the issue of drifting to the left side of the runway, although this happened at a much slower speed and closer to wheel stop compared to last time. NASA is studying ways to get around this, but not much has been figured out yet. 

Regardless of that, the 70s have come to a close for spaceflight, and what a decade it has been. So much change, so much advancement. From watching the Soviets land on the Moon as Apollo was grounded following Apollo 13, to watching a nuclear powered spacecraft send Americans to the Moon. NASA has remained at the forefront of space exploration, and looks forward to a decade of collaboration with its newfound ally in the European Space Agency. Skylab is set to be completed, lunar exploration is entering a new era, and at the center of it all: America's Space Shuttle.

The Space Shuttle has awed people across the world. An engineering marvel that is truly the crowning achievement of NASA. The new decade holds much optimism for the Shuttle, with new payloads, mission profiles, and upgrades set to be implemented.

But NASA has issues, issues that like any other government agency, it must work out. A new president may hold a new space policy, and a new Administrator may shake things up, who knows.

What is certain, is that the wild ride of space exploration is just getting started.

 

A New Decade Awaits.

Edited by track
Link to comment
Share on other sites

  • 2 weeks later...

A New Decade

As the ball drops at Times Square, and the celebrations begin. The new decade is brought upon the world to much fanfare. NASA looks upon this new decade with cautious enthusiasm. Many within the agency are looking forward to the 80s, and all that NASA has planned. But there are many who enter this great unknown with unease, and a certain anxiety about the future. The 1970s shaped NASA's future heavily, and forced it into some stark realizations about what needs to be done in order to continue the aspirational pace of exploration. Cost is the name of the game going forward, and NASA has to make some difficult decisions. Advanced Apollo will be yet another transitional phase, into the planned "Apollo Follow-On Program" which will eventually get a catchier name.

On top of this, NASA begins looking into concepts that will result in a sort of... "revival" of the Apollo CSM, into a crew vehicle for this AFOP program as its wonderful acronym calls it. In the most unusual crossover of all time, these concepts suggest a launch on the Space Shuttle, boost to the Moon by Centaur, refueling in lunar orbit, and a return similar to the CSM. This oddly complex architecture was pulled straight from the mind of North American Rockwell engineers. The service module would be shrunk, and a ring of external fuel tanks added around an upgraded Lunar Module Descent Engine (LMDE) for primary propulsion. The SN would otherwise share the Block V solar arrays and communications dish. The Command Module would see a massive overhaul, however. All of the systems upgraded to Shuttle-derived guidance and software systems, new MFDs brought over from the Shuttle added. The docking tunnel was also widened and lengthened to allow for the swap to the APAS docking system.  This would give the capsule a slightly different appearance than the original CSM, with a longer "snout" of sorts. The exterior would also be covered in thermal blankets similar to the Shuttle. All of these upgrades and additions would make the capsules reusable, bringing down the cost of each "ACOV" spacecraft, as they are dubbed by Rockwell. (ACOV stands for Apollo Crew Operations Vehicle.)

Spacecraft aside, America itself faces a massive year. Elections are coming this year, and the political landscape has changed. Jimmy Carter's presidency hasn't gone, shall we say, exactly as he probably would've hoped. Economic turmoil has only continued, and a revolution in Iran and general instability has fed a resurging Republican party. Candidates for the election are set to be chosen this summer, and the election of course set to be held in November. Whoever wins will have space policy, and a new President could bring radical changes to NASA and its future.

Rockets are quick to establish themselves in the new decade, as a Titan IIIE launches on January 3rd, carrying the Near-Earth Observer (NEO) spacecraft. This spacecraft is designed (totally not from spare parts) to observe Near-Earth objects, which are becoming a new field of interest for astronomers.

screenshot3297.png

screenshot3303.png

16 days later, Shuttle Columbia prepares to launch on STS-31-A. Her 6th flight, which is intended to repair the SPECTER space telescope, which launched way back in November 1974, but has suffered from several issues over the past few years. Columbia will rendezvous, capture, and repair/upgrade the telescope, allowing it to continue operations for several more years.

MISSION OVERVIEW: STS-31-A |

Commander | Anthony England

Pilot | Daniel Brandenstein

Mission Specialist 1 | Dale Gardner

Mission Specialist 2 | Jeffrey Hoffman

OV-102 "Columbia"

Objectives: Repair SPECTER Space Telescope.

"Solid Rocket Booster Ignition and LIFTOFF of the Shuttle Columbia, on a mission to redeem the SPECTER telescope!"

screenshot3312.png

screenshot3315.png

screenshot3318.png

On Flight Day 3, Columbia gets a visual on SPECTER, and moves in.

screenshot3322.png

From here, the crew of Columbia can see the telescope in its problematic state. The telescope has been unable to communicate with the ground for a few weeks at this point, and one of the solar arrays never deployed after launch. On top of this there have been several computer issues that the crew will thankfully be able to work out. This is because while SPECTER predates Shuttle missions, it was designed for future servicing, so many of its components are easily accessible while spacewalking.

However... shenanigans ensue as Columbia attempts to grapple SPECTER, the clamp seems to be unable to well... clamp.

screenshot3323.png

Eventually after sunset, the Canadarm gets a grapple on SPECTER, so the mission will be carried out like this.

screenshot3327.png

Opening the service bay, Dale Gardner manually pulls a series of electrical breakers to cut off power to several systems, including the guidance/alignment systems, which were wrestling with the Shuttle.

In this rather awkward position, the crew prepare for the first spacewalk. This will install a new antenna to re-establish communications with SPECTER, a faulty gyroscope will also be replaced.

screenshot3331.png

screenshot3336.png

The second and final spacewalk will get the second solar array un-stuck. This will be done by pulling a stuck latch pin which was discovered on the first spacewalk as the likely cause of the failed deployment.

screenshot3337.png

After Spacewalk 2 is completed, the crew of Columbia hold on to SPECTER for one more day, as checkouts are performed from the ground. After this though, on Flight Day 6, SPECTER is released, ready to begin observations once more.

screenshot3339.png

Columbia deploys a few Canadian topology cubesats a few hours later, from the payload container situated in the back of the payload bay.

screenshot3342.png

Columbia de-orbits the next day then, targeting a landing at the cape.

screenshot3343.png

screenshot3346.png

screenshot3347.png

"Gear down."

"300 feet, Shuttle on a good approach."

"250."

"200."

"150."

"100."

"Keeping that nose high."

"50."

"25."

"10."

"5."

"Main Gear Down!"

"Rotating the nose..."

"Nose Gear down!"

"Columbia putting on the brakes now."

"Wheel stop! Welcome home Shuttle Columbia and the crew of mission 31-A."

screenshot3349.png

Columbia comes to a stop following a triumphant mission. STS-31-A has truly demonstrated the Shuttle at the peak of its capabilities. No other vehicle could've done what OV-102 did on this mission. This is a great accomplishment for the Shuttle program, and has only fed into the PR bonanza. Some of the footage capture by the astronauts was absolutely awe-inspiring. Newspapers were practically rolling in cash as these front page cover photos practically took themselves. It's a great way to start the new decade.

But as Columbia comes to a stop, a legend starts rolling for the end of an era.

The final crewed Saturn IG is heading to the launchpad.

Skylab 11 rolls out to 39C on January 28th, to great fanfare from NASA and contractor employees. This is not only the last crewed Saturn IG, but it will be the last flight of the Apollo CSM. This transitional period from Apollo to Shuttle has been very interesting, as both spacecraft flew together and were even docked at Skylab together. Although the CSM may find a new lease on life, depending on where the whole "ACOV" concept goes. The future holds much promise, but the Saturn IG, and the Apollo CSM, have been cemented as icons of spaceflight.

screenshot3360.png

The rollout fanfare is followed by a picture-perfect launch on February 9th. 

screenshot3363.png

screenshot3366.png

screenshot3368.png

There's not much time to take this in however, as on February 25th, the legend takes to the skies for the final time.

The Saturn IG launches from LC-39D, carrying the first Inflatable Accommodations Module, these modules are primarily technology demonstration of inflatable modules, but will also be used for scientific experimentation, as one (this one specifically) carries a large centrifuge, which can generate gravity for many experiments. This is a breakthrough technology, and will allow for many more interesting research projects aboard Skylab.

screenshot3406.png

screenshot3407.png

screenshot3410.png

Just like its entire career, the Saturn IG concludes its service with a picture-perfect launch. A true legend, that was the backbone of Skylab's early years. The rocket will forever be remembered, as a final unneeded vehicle will go on display at the Space and Rocket Center in Huntsville, Alabama.

But the Saturn IG's retirement comes during a flurry of activity, as NASA prepares to go to Saturn.

The Iapyx Spacecraft is ready for launch.

 

front_Iapyx_2.png

This bold little spacecraft will be launching on the maiden flight of the new Shuttle, Discovery. The Shuttle will also carry the massive High Energy Stage needed to boost Iapyx to Saturn for a transit that will be just over 3 years in total length, this is incredibly short for such a long distance, and will maximize mission time at Saturn.

MISSION OVERVIEW: STS-31-B |

Commander | Gordon Fullerton

Pilot | Frederick Gregory

Mission Specialist 1 | Steven Hawley

Mission Specialist 2 | Shannon Lucid

OV-103 "Discovery"

Objectives: Deploy the Iapyx Spacecraft and its High Energy Stage

screenshot3421.png

"Solid Rocket Booster Ignition and LIFTOFF of the Shuttle Discovery on her maiden flight, carrying the Iapyx spacecraft bound for Saturn!"

screenshot3427.png

screenshot3429.png

screenshot3433.png

On Flight Day 2, NASA controllers wait anxiously, as Iapyx and HES gently float out of Discovery's payload bay.

screenshot3437.png

screenshot3439.png

Iapyx will now spend ~3 months in LEO, testing its systems and waiting for the optimal transfer window. Another reason for the long stay in LEO is that NASA still has some PTSD from the Pioneer 10 failure, and does not want to lose Iapyx when it cannot be saved.

With that objective complete, Discovery only spends another day in orbit on her maiden mission, before returning for a landing at the Cape.

"Houston, Discovery!"

screenshot3442.png

screenshot3443.png

Discovery comes to a stop, after a highly successful maiden flight. As the new decade begins there has been a flurry of activity. The Saturn IG has retired, NASA's newest interplanetary mission has launched, and the nation looks towards the elections this fall. 1980 will be an incredibly busy year for NASA, and the Shuttle will remain at the center of attention.

 

But nobody is content to be left behind.

Edited by track
Link to comment
Share on other sites

  • 4 weeks later...

Routine Missions and Primary Elections

As spring sets in, NASA is getting geared up for a run of Shuttle missions lasting until the end of the year. With so many launches to be prepared for this year and in the future, NASA has begun designing a new large facility to sit behind the VAB, which will allow for stacking of SRBs and External Tanks before they are sent to the VAB for Shuttle stacking. This building, now dubbed the "Stacking and Assembly Building" or SAB, will begin construction later this year, and is expected to be completed by late 1981/early 1982. The building will have a door similar to the VAB door on its front, and will be split into multiple areas. From the door back will be the stacking area, External Tanks and SRB segments will be brought in, and then stacked. To the side will then be storage areas where up to 8 Shuttle stacks can be stored at once. From there, once they are ready, the crawler will enter the building with an MLP, and the stack will be mounted onto the MLP, and then carried to the VAB for the Shuttle to be stacked. For the most part, this facility will be used for stacking SRBs, as the ET and Shuttle stacking usually aren't separated by very long. The SRBs are by far the most time consuming process of stacking, so having that done in a separate building will free up space in the VAB.

With hopes of a less cluttered VAB in the future, NASA rolls out Challenger for the first "Routine Operational Mission" to Skylab. These missions will perform crew rotations and supply delivery. For now though they are primarily dedicated to supply and delivery of the remaining components to complete the station.

This mission, STS-31-C, will deliver supplies with the new Mini Logistics Module (nicknamed "Quincy" after John Quincy Adams) and 2 components of the station. The first is the second Inflatable Accommodations Module, and the other component is a robotic manipulator based on the Shuttle's Canadarm for the station.

With these components to be delivered, the station is nearly complete.

Challenger lifts off into morning spring skies on May 7th, 1980.

"SRB Ignition and Liftoff of the Shuttle Challenger on Mission 31-C to America's Orbiting Outpost!"

screenshot3463.png

screenshot3465.png

screenshot3468.png

screenshot3474.png

Now in orbit, Challenger will spend the day catching up with Skylab for a rendezvous and docking on Flight Day 2.

screenshot3475.png

screenshot3478.png

Now docked on Flight Day 2, the crews of 31-C and Skylab 11 meet in the Destiny Module like always, beginning a 10 day stay for the Shuttle at America's space station. This will make the mission the longest Shuttle mission to date.

First, the modified Canadarm is installed onto Skylab. This was done with a rather simple modification:

The Canadarm usually has one fixture on the end to latch onto Power/Data fixtures on spacecraft, station modules, really anything. But on Skylab, it will be able to "walk" across the station by going from P/D fixture to P/D fixture, and thus it has a grappling fixture on both ends. This is how it will be added onto Skylab and then released from the Shuttle.

The operation is slightly chaotic, but eventually successful, and the focus shift to getting the Quincy module out of the Shuttle and onto the Serenity module's available docking port.

screenshot3490.png

screenshot3494.png

IAM-2 would be successfully installed as well, with the rest of the stay being focused on setting up that module and other research aboard the station.

Challenger would depart early on Flight Day 12, and de-orbit later in the day for an afternoon landing at Edwards AFB, concluding STS-31-C.

The next Shuttle mission, STS-31-D, was slated for June, and rolled out to the launchpad on May 28th. However, during the countdown, a major hydrogen leak was detected in the umbilicals between the Shuttle and the ET, and forced a rollback on June 10th to the VAB for repairs. This delayed the mission several weeks, but it eventually rolled back out on June 26th, with a launch date set for July 1st. However that was scrubbed as well due to poor weather. But clear skies were forecasted for the next day, so a simple 24 hour recycle it was.

STS-31-D is being flown by Columbia, and is carrying 2 payloads, Magnetic Fields Explorer 3, and Shuttle Pallet Satellite 1, or SPAS-1.  Magnetic Fields Explorer 3 is one of the US-built spacecraft for the joint Magnetic Fields research program with ESA and the UK Space Agency. SPAS-1 carries multiple instruments provided by foreign space agencies and a few universities. It is a pallet, as the name implies, which can hold these instruments and allow them to be used in space. In some of its forms it can be deployed from the Shuttle and retrieved at the end of the mission.

Weather and hydrogen permitting, the launch is GO on July 2nd, 1980.

"Booster Ignition and LIFTOFF of Columbia, furthering our knowledge, and advancing our understanding of the universe!"

screenshot3514.png

screenshot3517.png

screenshot3525.png

SPAS-1 is deployed on Flight Day 2. The primary experiments onboard SPAS-1 are the Gamma Ray Annihilation Observer (GRAO), which is intended to study gamma rays to trace annihilation events and thus antimatter, and the SP-1 (Spectral Pathfinder-1) is testing a prototype spectral scanning system. There are several other smaller experiments as well.

screenshot3529.png

screenshot3530.png

SPAS-1 will be kept at a distance of around 500m until it is retrieved towards the end of the mission. The focus now shifts to another experiment onboard...

Columbia is carrying a Synthetic Aperture Radar (SAR) experiment, which is testing an upgraded SAR system from the lessons learned with the Seasat spacecraft. This could greatly enhance the capabilities of SAR, and open up a whole new world of possibilities.

screenshot3563.png

MFE 3 is then deployed on Flight Day 4.

screenshot3564.png

The next day, on Flight Day 5, the crew move to retrieve SPAS-1 as they prepare to return on Flight Day 6.

screenshot3567.png

Gently maneuvering so that the Canadarm can lock onto the P/D Fixture, the crew of Columbia perform precise movements of the Orbiter, with small RCS pulses bringing the Shuttle closer and into alignment.

screenshot3570.png

A slow and tedious operation which takes over 6 hours, SPAS-1 is finally locked back into place in the payload bay of Columbia.

screenshot3573.png

The rest of the mission's stay in space could be considered quite boring after that operation, but nevertheless Columbia de-orbits on Flight Day 6 for a landing at the Cape.

screenshot3574.png

screenshot3575.png

screenshot3577.png

screenshot3580.png

As Columbia lands, a bold little spacecraft has begun a long journey to a far away world.

Iapyx is Saturn bound.

screenshot3503.png

Back in June, the High Energy Stage gave Iapyx the monumental boost needed to reach Saturn, and after a tense half an hour as Iapyx's various instruments and systems deployed, the spacecraft was healthy, and finally on its way to Saturn.

15 years since Iapyx originated as a failed Saturn orbiter proposal. The hundreds of people who had spent so much of their lives working to prepare this spacecraft could celebrate.

Orbital insertion at Saturn is expected in the summer of 1983.

But now, later in the summer, America's political parties are ready for their big shows before the election. The Republicans and Democrats hold their national conventions, in Detroit and New York respectively, as the votes are cast...

REAGAN/BUSH

CARTER/MONDALE

Photograph_of_Ronald_Reagan_giving_his_A

Jimmy-Carter-and-Walter-Mondale-At-The-1

The new hotshot of the Republican Party, former actor and Governor of California, Ronald Reagan, will go up against President Jimmy Carter in the elections this November.

But we don't care about all of their boring politics do we? What's their space policy?

Jimmy Carter's presidency has not been kind to NASA. Some might say they've been forced to face harsh realities, some might say they've been neglected. But the point is that Carter has overseen an underwhelming Golden Age of NASA, that he failed to act upon.

Reagan however, has stated his clear support for NASA, and intends to stabilize their budget, support their programs, and give them the correct management for the new decade.

This election will be pivotal for NASA's future. One can hope the agency can act upon the potential of the new decade.

Edited by track
Link to comment
Share on other sites

The Flying Pizza Roll and the Completion of Skylab

As July rolls into August, ESA is preparing the first operational MPCS Block I for its flight to Skylab. It will  dock on the zenith port of the Primary Logistics Module, and deliver 1,200kg of cargo. The MPCS, now nicknamed the "Flying Pizza Roll" by NASA employees due to its shape, has a very important role to play with the upcoming retirement of the Apollo CSM. In the Shuttle's absence and the CSM's retirement, the MPCS will now serve its primary intended purpose as an emergency escape vehicle for the crew. Should another incident like the CO2 event happen again, the crew can safely evacuate the station and return to Earth. This important contribution to the station has earned ESA seats on long-duration missions, space for science experiments, and data from some of the station's instruments. The MPCS will also be used to return Advanced Apollo crews, which has gained ESA something they have been dreaming of for years.

Seats on a moon mission.

NASA has given ESA seats on Apollo 27 and 28 for their contributions to the missions, with an option for future seats being available. They will get 1 astronaut on Apollo 27, and potentially 2 on Apollo 28. This will, therefore, be the first time non-Americans/Soviets land on the Moon. While technically an Australian-American Philip Chapman, who orbited the Moon as Command Module Pilot on Apollo 25, is the only other person not born in America or the Soviet Union to visit the Moon.

With these developments, the Flying Pizza Roll lifts off on its first operational mission to Skylab.

screenshot3582.png

screenshot3587.png

screenshot3590.png

A successful launch, rendezvous, and docking with Skylab. Each MPCS can serve for up to 8 months on orbit, which will allow them to stay between missions until a new one can arrive.

As August now rolls into September, NASA is preparing for STS-31-E. This mission is notable because it will carry the last module of Skylab. After 6 years, Skylab is one launch away from being complete, one.

Discovery will perform the first crew rotation by a Shuttle, and deliver the Multi-Purpose Laboratory, the final component of Skylab. With this flight, Skylab will be complete, after over 6 years of assembly on-orbit.

But there is some controversy to this mission, not public, but within the government. 31-E was originally a DoD mission by Challenger, but due to a changing schedule and NASA not wanting to leave Skylab empty for several months, the DoD mission was swapped with a Skylab mission, and the orbiter changed to Discovery. The DoD is simply put, very mad, but NASA's priorities come first for the Shuttle. This backseating of DoD missions has only fueled the squabbles between them and NASA. But ultimately it is NASA's program to schedule and operate. The DoD is, for once, at the mercy of another government agency.

MISSION OVERVIEW: STS-31-E |

Commander | Karol Bobko

Pilot | Michael Coats

Skylab Commander | Richard Covey

Scientist 1 | Anna Fisher

Scientist 2 | George Nelson

Specialist 1 | Michael Mullane

OV-103 "Discovery"

Objectives: Deliver Multi-Purpose Laboratory, the final component of Skylab. Deliver the Skylab 12 crew for their 200 day stay.

The 4 crew intended to stay aboard the station, serving as the crew of rotation 12 (named Skylab 12), will perform the standard 200 day stay aboard the station. 

With all of that out of the way, Discovery lifts off from 39A on August 20th, 1980.

screenshot3604.png

screenshot3608.png

screenshot3615.png

In a slightly worrisome moment, ET separation induces a roll on both the Shuttle and the ET. The Shuttle is in good health, but many suggest for the Shuttle's TPS to be inspected at Skylab.

A procedure is cooked up for the Shuttle to do a "barrel roll" before docking to give a full view of the TPS for the crew to photograph.

A few hours before rendezvous, the MPL is deployed from the Shuttle's payload bay, and docked directly to the Shuttle's docking port, which will allow for a direct installation onto the station.

screenshot3620.png

As the Shuttle approaches the station on Flight Day 2, it performs the barrel roll which allows the crew onboard Skylab to photograph Discovery's TPS.

screenshot3621.png

No damage was observed, so docking proceeds as planned.

screenshot3624.png

screenshot3627.png

"30."

"20."

"10."

"5."

"3."

"2."

"1."

"CONTACT."

"CAPTURE."

screenshot3628.png

Skylab now finally complete. The largest object to ever orbit the Earth, the worlds first modular space station, and a testament to the might of America's space program, and what NASA is truly capable of.  The station's completion comes at a turbulent time for NASA, but whatever the future may hold. They can look to Skylab as proof of their capabilities.

Nevertheless there is work to be done, Discovery is also intended to retrieve the Mini Logistics Module which is currently attached to the Serenity Module, Discovery will have to relocate to the original SDA for this.

screenshot3634.png

Discovery relocates to the original SDA on Flight Day 4.

screenshot3640.png

Skylab's Canadarm then sees its first major use on Flight Day 6, loading the MLM back into Discovery's payload bay.

screenshot3641.png

screenshot3642.png

With the MPL docked and mostly outfitted, and the MLM retrieved, Discovery undocks on Flight Day 10 after 9 days at the station, to return home.

screenshot3643.png

Discovery successfully de-orbits and lands at Cape Canaveral.

A monumental goal for NASA has been completed. It has taken the agency's efforts of over half a decade to complete the monumental station. It has seen 2 generations of crewed spacecraft, new lunar missions, and new astronauts. The station has orbited overhead during a period of change for NASA, and that change is far from over. The agency could be in for another stirrup with a new presidential administration, and new Administrator.

Regardless, while NASA celebrates the station's completion, and looks forward to a potential decade of further operations. There is even more fanfare to be had.

May I introduce, the last Shuttle on order.

OV-104...

Atlantis.

screenshot3650.png

Atlantis completes NASA's vision of a 5 Orbiter Fleet. The agency originally envisioned far more Shuttles, but 5 has been a good compromise considering the budget situation. Atlantis is the most advanced orbiter to date, learning from the experiences and issues with the past orbiters. Therefore being the lightest and most capable as well. She is expected to first fly on STS-41-A, the first flight of 1981, carrying the first TDRS satellite. It will be a flight of many firsts.

With this great few weeks of fanfare, NASA's attitude would shift greatly over the coming weeks...

LPFTP

Challenger rolled out to 39A for STS-31-F in mid-September. The mission's primary objective would be to deploy the Long Duration Exposure Facility, a large 12 sided satellite about the size of a school bus. This satellite wasn't really a satellite, it was just a can packed with long duration experiments. The essence of the craft was to deploy it in orbit, and then retrieve it a year or 2 later, where the experiments would then be studied to see how long duration exposure to the vacuum of space effected them. The LDEF was the perfect supplement to research on Skylab, and could carry many larger experiments.

The LDEF was loaded into Challenger's payload bay, and the Shuttle stood poised for a beautiful sunrise launch on September 30th, 1980. 

screenshot3660.png

A normal countdown, and a liftoff that exceeded all expectations of beauty.

screenshot3667.png

screenshot3669.png

However...

While the announcer speaks, the propulsion engineers in mission control are reading incredibly unusual telemetry from the No. 2 engine. The C/W system sounds a Level 2 alarm, which is connecting to reading data from the main propulsion monitor system. Houston informs the crew to ignore the alarm and cut it off, the propulsion engineers assume it is a sensor issue, and ignore the unusual readings.

Whatever the issue was, NASA doesn't seem to care, and they don't want the crew to care either.

screenshot3671.png

C/W goes off again. And the ground telemetry is reading that No.2 engine's Low Pressure Fuel Turbopump is loosing pressure. This could lead to the High Pressure Fuel Turbopump cavitating.

Once again, C/W is shut off without a second thought. This is because the SSME has a history of sensor issues.

 

No.2 engine is now loosing performance, dropping to 100.5% of rated thrust. This is when it becomes too much to ignore, the propulsion engineers start making callouts.

"I've got No.2 with dropping LP-FTP pressure and at 100.5%"

ATO is not ideal on this mission as the LDEF has to stay in orbit without any boosting, so leaving it in a lower orbit risks re-entry before its back in the payload bay of a Shuttle. NASA is hesistant and doesn't even relay this to the crew.

screenshot3674.png

NASA has cut off the countdown net to the live broadcast, so the public isn't aware either.

"Challenger, press for MECO."

"Roger, press for MECO."

C/W has been forced off at this point, the only indication that No.2 engine is failing is on the ground. Ironically, due to an actual sensor issue coming from a faulty fuel cell reading that made no sense.

...

3 Engines Shutdown, MECO.

The External Tank Jettisons, and Challenger gently pushes herself away using the onboard RCS. Somehow, they managed to get to orbit, by violating every single constraint along the way.

screenshot3675.png

screenshot3676.png

The cover-up of the issues with the No.2 SSME is just the tip of the iceberg of current issues with NASA. The agency has developed an infectious overconfidence in itself, one that has lead to many of the messes NASA finds itself in at the moment. A willingness to violate safety constraints if it risks mission success and a good newspaper headline is just the beginning. NASA's management has never been perfect, but it is at a tipping point. A new Administrator, if there will be one, must right the ship.

While the crew of 31-F get to work on orbit. A screaming match ensues in Houston. The Launch Director trying to defend the decisions made, and the engineers who had just learned of the situation tearing him a new one for said decisions.

This rift between managers and engineers has been growing for years, and the Shuttle has only worsened it.

While NASA keeps the launch situation quiet, the crew on orbit utilize the new and improved Canadarm to deploy the LDEF.

screenshot3686.png

A rather straight forward and simple mission, with so much drama around it. Challenger spends a few days on orbit afterwards as the crew perform research, with de-orbit coming on Flight Day 6.

screenshot3687.png

screenshot3689.png

screenshot3691.png

As Challenger comes to a stop on October 6th, NASA can only be relieved after what happened during launch. But management has missed the point of what happened. The crew never knew about what happened, and both they and the public were left in the dark. How long can NASA cover up its failures before it comes back to bite them? Only time will tell, but as I said.

Someone must right the ship.

The DoD, A Refueled LTV, and A Pizza Roll With Wings

To close out the year, NASA has a few more things to handle. Most notably, the Orbital Refueling Demonstration, which will attempt to refuel the Apollo 26 LTV with a Liquid Hydrogen Tanker, before it de-orbits. The Saturn A07 that will launch this mission has been stacked, and will be rolled out to 39C in late November.

But before that, the DoD finally gets a Shuttle launch, carrying a rather boring not exactly super secret military communications satellite. However this mission is notable for one reason. It is the first flight of the Interim Upper Stage, or IUS, a 2 stage solid-fueled system for boosting spacecrafts to their intended orbits. IUS is one of the stages chosen by the Air Force, alongside Centaur G. Centaur G has been facing major delays and likely won't be ready until 1983, so IUS will have to be the workhorse upper stage for now. IUS is also intended to boost NASA's TDRS satellites to GEO as well.

The mission is rather uneventful, unlike the last Shuttle mission, and Columbia successfully flies the 4 day mission from November 19th to November 23rd.

screenshot3704.png

screenshot3714.png

screenshot3735.png\

On that unchaotic note, the Shuttle's year for 1980 is wrapped up. The Shuttle has made major progress this year, deploying its first interplanetary mission, completing Skylab, and having the final ordered Shuttle delivered.

Truly, they're growing up so fast.

As we move into December, JPL begins testing the Enhanced Exploration Roving Module, or EERM. It is a neat little rover that will be used on Apollo 27 onwards. It is a major step up from the LRV, providing crews with pressurized cabin space, and a much more comfortable method of exploring the lunar surface.

As the EERM roves around JPL, NASA rolls out the much larger Saturn A07 rocket to launch the Orbital Refueling Demonstration. The ORD is practically an LTV but with the nuclear engine, much of the solar array, and radiators removed, and now acting as a tanker. The ORD will rendezvous with the Apollo 26 LTV which is still in orbit of the Earth, and refuel the tanks, not for reuse, but to demonstrate the capability.

The mighty Saturn A07 roars to life for the second time, on a mission of the utmost importance for the future of space exploration.

"Booster Ignition and LIFTOFF of the Saturn A07 on a mission to demonstrate the ability to refuel spacecraft on orbit!"

screenshot3740.png

screenshot3741.png

Upon reaching orbit, the ORD Tanker successfully performs a rendezvous with the LTV, and docks.

screenshot3746.png

Docking is completed and the whole assembly is slowly moved to a more stable position. The fueling lines successfully connected, and preparations are underway to begin fueling.

screenshot3747.png

After the depress vent releases the LTV's tank pressures to a safe but lower level, the fuel valves open, and the RCS starts up. The fueling operation has begun.

screenshot3748.png

After about 30 seconds, the RCS is cutoff and the pressure differentiation is allowed to take over. For the next 5 minutes, the fuel levels in the LTV steadily increase. Once all is said and done, about 7,533kg of Liquid Hydrogen are transferred into the LTV.

This... is monumental.

Although the process is rather slow, ORD has demonstrated that Liquid Hydrogen fueled tugs can be refueled and reused over the course of multiple missions. This will be critical for reducing the costs of Advanced Apollo and the Apollo Follow-On Program, as well as other applications.

This is the perfect mission to round out the year for NASA. What was once just a studied concept is now demonstrated as feasible and applicable now. Not in 5 or 10 years, now.

The implications of this feat are far-reaching, and it provides hope for reusable nuclear tugs for Mars missions and beyond.

But the Flying Pizza Roll sneaks into the end of the year to do some testing for the future. On December 20th, an MPCS Block I is flown on a high altitude landing test to demonstrate upgrades planned for MPCS Block II, which flies 9 days later on December 29th.

screenshot3752.png

The main upgrade demonstrated is the paraglider, which will allow for eventual land recovery of the MPCS.

screenshot3754.png

9 days later, this is demonstrated on MPCS Block II, as it flies for the first time.

screenshot3756.png

With the Flying Pizza Roll getting its stubby little wings, the first year of the 1980s is brought to a close.

But wait... the elections.

What happened there?

Well let's just say...

America has a new President.

09troyWeb-jumbo.jpg

Link to comment
Share on other sites

I'd like to thank everyone who has supported me through all of these posts. We're over 7k views on this now! I truly cannot believe that it's gotten to this point, and I appreciate all of you who have commented and liked the posts.

I also wanted to mention the newest post and some changes I made. I'm trying out a new system where each part is split into multiple chapters. I felt like this works better to divide the story more evenly and give major events the focus they need. Let me know what you think of it!

Thank you all!

Link to comment
Share on other sites

Under New Management

"We must act today in order to preserve tomorrow."

These words from Reagan's inaugural address ring true for more than just the United States itself, but for NASA alone. 1980 was, on its surface, another successful year for NASA. But as a new President is inaugurated, and Reagan begins his search for a new NASA Administrator, there is an unease within the agency. Many are hopeful for a change in philosophy and doctrine with a new Administrator and upper management. But before Reagan is even inaugurated, NASA distracts the public once more with a new spectacle.

2 Shuttles on the launchpad at the same time.

screenshot3762.png

Due to some schedule shenanigans caused by more work needed on Atlantis upon her arrival at the Cape, Discovery and Atlantis swapped launches for the start of 1981. Therefore, Discovery will launch the first TDRS satellite, and Atlantis will perform a supply run and crew rotation for Skylab.

Atlantis sits on 39B, targeting a late January launch, while Discovery is slated for a launch no earlier than January 16th.

To keep things moving, one of NASA's biggest pushes for the new decade has been approved by Congress.

The Shuttle Derived Launch System (SDLS)

While plans aren't concrete just yet, SDLS is a massive breakthrough to replace the ASLVs and be a much lower cost solution for heavy lift rockets. Derived from Space Shuttle hardware, it is designed to be highly modular, fulfilling a wide range of payload capabilities. SDLS is expected to first fly in 1984, and will be the backbone of the Apollo Follow-On Program. This puts the still relatively new ASLV rockets on a path towards an early retirement. But these are the necessary steps that must be taken for a cost-effective and efficient NASA in the new decade.

2 days before Reagan's inauguration, Discovery takes off on her 3rd flight to begin the deployment of NASA's Tracking and Data Relay Satellite constellation.

"Solid Rocket Booster Ignition and LIFTOFF of Discovery, carrying the first Tracking & Data Relay Satellite to orbit!"

screenshot3772.png

A nominal liftoff and ascent, and Discovery reaches orbit to begin the 3 day mission.

screenshot3779.png

TDRS-A is successfully deployed 9 hours after launch, and is boosted to geostationary orbit by the Interim Upper Stage.

screenshot3780.png

With the mission's main objective complete, the crew focus on experiments for the next 2 days, before Discovery returns to Earth on the 21st.

screenshot3791.png

screenshot3793.png

screenshot3796.png

screenshot3797.png

A successful landing of Discovery, concluding her 3rd mission.

While post-landing operations seem to be going normally, a concerning situation is revealed during the initial heat shield inspection. 10 tiles on Discovery are broken, and 9 more are somewhat damaged. Analysis reveals that the SOFI on the External Tank may have shed off, and damaged the tiles.

This is concerning, but NASA can't do much about it. SOFI is critical to insulating the cryogenic propellants, but nonetheless NASA suggests that Martin Marietta, the manufacturer of the External Tank, to look into ways of preventing foam shedding.

Atlantis continues to prepare on 39B for her maiden flight, which is less than 10 days away.

Ronald Reagan is inaugurated as the 40th President of the United States of America on January 20th, 1981. His administration is promising to lower taxes, reduce inflation, improve the economy, and build a better America for the coming decades. Whether his campaign promises will be met is to be foreseen. But the economy is coming out of its 70s spiral, and Reagan has committed to stabilizing NASA's budget. The FY 1982 Budget will be the chance to prove that.

Soon into his presidency, Reagan begins his search for the new NASA Administrator. His advisors have a list of potential options that have been presented. But one advisor speaks up during a meeting, and hands Reagan a document.

A new suggestion...

Reagan stares at the document, reading every line, until he looks up, and says to the meeting.

"Gentleman, I believe I have the right man for the job."

John-Young-aboard-Columbia-678x951.jpg

John W. Young.

Young's reputation precedes him. Having flown twice on both Gemini, Apollo, and the Space Shuttle. He is currently the Chief of the Astronaut Office, and has done well in that position. He is, quite possibly, the perfect choice for NASA in its current situation. As a (technically still active) astronaut, he has a high regard for crew safety, and his opinions on the Shuttle are different from others.

Young regards the Shuttle as an experimental vehicle, not "operational" as many within NASA like to call it at this stage. He is more cautious in his attitude towards it, but he is not anti-Shuttle by any means.

His management could be a breath of fresh air for the agency, and be the exact leadership that NASA needs in this new decade.

The meeting is stunned by the President's decision, but they're not necessarily against it. Young came out of nowhere to win this position.

Reagan announces to the nation, during one of his televised speeches on February 1st, his selection.

"For many years our nation's space agency has fascinated me. It is the world's premier space exploration agency, producing marvels of science and engineering the likes of which the world has never seen. The Space Shuttle has captured our hearts and souls with its almost science fiction capabilities. But now, as President of the United States, I have a duty to select the right person to lead this agency. The right person to give NASA the leadership and management it needs to succeed in this new decade and beyond. My fellow Americans, I believe I have found the right man for the job."

"His reputation precedes him, a veteran of six spaceflights, the 9th man to walk on the Moon, and the Chief of the Astronaut Office."

"I have nominated Mr. John Young to serve as NASA Administrator."

Young is surprised, but nevertheless takes on the challenge bestowed upon him by the new President. He is to take office at the end of February. 

But will he be able to lead the agency in the right direction? Many think so. This is an extremely popular nomination within NASA, and they are clearly in support of Young as Administrator. Therefore, Young is set up in the right position to steer NASA towards greater exploration in the coming years.

Whether it was just a selection for the sake of PR, many believe it's the right selection. Richard Truly is expected to take Young's place as Chief of the Astronaut Office.

The Flight of Atlantis, A Moonshot, and Space Fruit

While the new Administrator of NASA is being selected, NASA itself is preparing a new Shuttle for launch. Atlantis arrived at the KSC back in September 1980, and spent a few months in the Orbiter Processing Facility getting fitted and prepared for her first flight, which was bumped to STS-41-B after Atlantis ended up needing more work than expected:

  • 973 tiles needed to be replaced.
  • After the startup tests on October 15th, it was discovered that some wiring in the cockpit needed to be re-done.
  • The nose gear had to be replaced after it didn't deploy during a gear deploy test.
  • The forward RCS had to be taken off and repaired after a few valves were discovered to be... inoperable.

This wasn't exactly the best first impression on NASA's engineers and technicians from the new Shuttle. So much so that a couple of engineers jokingly sent a letter to Rockwell asking about their "return policy on new Shuttle Orbiters," Rockwell responded back saying that they "did not have an active return policy, but to look for a trade-in opportunity," this got out to the news who ran with the story as if Atlantis was a broken and malfunctioning spacecraft, which it kind of was. But all of the Shuttles had issues during their first stint in the OPF, and Enterprise continues to be problematic between flights.

Despite this little news story, Atlantis was in proper condition for flight by mid December, Rolled over to the VAB on December 18th, and stacked on the 19th. Rollout occurred on January 4th, and on the 5th as the sun rose was when the photographers got into a frenzy, as Discovery sat on 39A, and Atlantis sat on 39B.

Atlantis then spent the rest of the month doing lots of testing. Her Flight Readiness Firing (FRF) was conducted on January 10th, and was successful. Followed by a full Wet Dress Rehearsal on the 18th, and then a Dry Rehearsal on January 26th with the crew.

After all of these tests, Atlantis was finally GO for her first launch, slated for January 30th. But that was then pushed back to the 31st... and then February 1st... and then the 2nd.

So a few delays, but the 2nd was finally launch day.

MISSION OVERVIEW: STS-41-B |

Commander | Story Musgrave

Pilot | Karl Henize

Skylab Commander | William Lenoir

Scientist 1 | Guion Bluford Jr.

Scientist 2 | Terry Hart

Specialist 1 | Margaret Seddon

Specialist 2 | Dale Gardner

OV-104 "Atlantis"

Objectives: Deliver supplies and new Skylab crew to the station.

On the 29th, a new MPCS is launched to Skylab ahead of the new crew's arrival. This is the first Block II MPCS, which can carry 6 crew and will allow for 5-member Skylab crews once again.

But nevertheless, Atlantis is GO for launch on February 2nd, 1981.

"BOOSTER IGNITION AND LIFTOFF! The maiden liftoff of Space Shuttle Atlantis on Mission 41-B to America's Space Station Skylab!"

screenshot3820.png

screenshot3825.png

screenshot3829.png

screenshot3832.png

The payloads for the mission, MPLM "Washington" in the aft, it has not flown since STS-2, the first Shuttle visit to Skylab and when Saturn-Shuttle was still in operation. In the forward area is the Pressurized Logistics Pallet, a logistics module mounted inside a structural rack-type system that can carry pressurized cargo, accessed by the same adapter for Spacelab. The main cargo being carried is hardware to outfit the Multi-Purpose Laboratory.

On Flight Day 2, Atlantis reaches Skylab, and prepares to dock.

screenshot3835.png

screenshot3837.png

Outfitting of the Multi-Purpose Laboratory begins on Flight Day 7, mainly undertaken by the Skylab crew, the rest work on a new capability to be tested. Atlantis, being the last and therefore the most well equipped Shuttle, due to lessons learned from the previous orbiters and new capabilities having been developed, has the ability to draw power from Skylab. This can extend a mission to up to 16 days, and as the technology matures, Orbiters could stay at Skylab for up to 21 days.

Atlantis begins drawing from the station's reserve power systems, and all seems to function as intended.

On Flight Day 12, the MPLM is returned to the payload bay of Atlantis.

screenshot3844.png

screenshot3845.png

On Flight Day 14, Atlantis performs a reboost of Skylab, one of the last things to be done before the Shuttle departs.

A few hours later, Atlantis undocks from the station.

screenshot3847.png

Once a decent distance away from the station is reached, Atlantis enters the "backlip" maneuver so that the Skylab crew can inspect and photograph the Shuttle's TPS system, it was decided this maneuver would be moved to an undocking and departure procedure as it gives a better idea of the TPS condition close to re-entry.

screenshot3849.png

Atlantis de-orbits on Flight Day 15, targeting a landing at the Cape.

screenshot3851.png

screenshot3855.png

screenshot3858.png

screenshot3859.png

Atlantis comes to a stop, her maiden flight successfully concluded. This was the first time the Shuttle landed at the SLF from the other direction.

Early in March, the Soviets begin executing a plan for an interim space station. With Mir facing delays meaning it likely won't begin construction until 1986, the Soviets need an orbiting laboratory now that Salyut 6 is retired. The solution is Salyut 7A, which will compose of not only the core DOS, but 2 other modules forming a small station for the USSR until the time comes for Mir.

The first module is launched on March 9th by Sokol B (a version of Sokol without the upper stage) destined for Low Earth Orbit.

screenshot3904.png

screenshot3906.png

screenshot3908.png

Fully deployed after inserting itself into orbit (for proper disposal of the Sokol core stage) the Salyut 7A core module will await the other 2 modules, scheduled to launch later in autumn. The first Soyuz crew is then expected to arrive in winter.

screenshot3911.png

But the Soviets have more to attend to at the start of '81. You see, when the N1 was cancelled, the Soviet space program did not give up on their Lunar program, instead, they envisioned a restructuring of it. Architecturally and internally. To hopefully keep it alive and stay somewhat on par with the US. What they came up with was a new system utilizing Sokol, and the now fully developed LK-700 lunar lander. 

The mission architecture was a little complicated, but these smaller launches provided for a lower cost mission, with respectable capabilities. 

Sokol would launch the LK-700 (with crew already aboard, as it was now a lander/crew spacecraft hybrid of sorts) and it would be sent to the Moon where it would land and perform a surface stay no longer than 5 days. Compared to the small LK, the LK-700 could carry 3 crew to the surface, which although is 2 less than the ALSM at max capacity, it is still more than the original LM. Right after the LK-700 launches, though, Sokol would launch a big tug of sorts that would rendezvous with the LK-700 after it returned to orbit from the moon's surface. The tug would then boost the LK-700 back to Earth, where the capsule atop the lander would safely land the crew back on Earth in Kazakhstan.

This rather unusual mission profile did have some risks, but the cost was acceptable to the Soviet government, and Sokol had proven itself to be much more reliable than the N1.

The Soviets launch a crucial uncrewed "moonshot" test mission on April 2nd, where the LK-700 will land on the lunar surface, but not ascend.

screenshot3913.png

screenshot3914.png

Sokol's second stage does most of TLI, with the LK-700's transfer stage doing the rest.

screenshot3916.png

screenshot3918.png

screenshot3922.png

Luna 9 is slated for June, around the time of Apollo 27, but it is unlikely to meet that date.

Shifting back to NASA, Challenger launches to begin the STS-41-C mission on April 16th, 1981. This is the first Shuttle launch for NASA under new Administrator John Young, who is in attendance. This is the 3rd Spacelab mission, and it is primarily dedicated to the study of fruit and vegetable growth in space. Some specimens have been growing on Earth, and they are nearly about to bear fruit, how zero gravity changes this late stage of growth is a particular focus of the mission.

"BOOSTER IGNITION AND LIFTOFF! LIFTOFF of Space Shuttle Challenger and Spacelab 3! Furthering our knowledge of the zero g environment of space!"

screenshot3931.png

screenshot3934.png

screenshot3935.png

screenshot3938.png

screenshot3943.png

The experiments on fruit and vegetable growth yield some... interesting results.

The plants still do bear fruit towards the end of the mission, but the stems start to grow rather wildly in all sorts of directions, leading to some unusual arrangements and sometimes making it difficult for some fruit to bear.

The mission has a massive impact on current knowledge of plant growth in space, and future longer duration experiments on Skylab are in formulation. Skylab is also expected to get a set of hydroponics bays based on the positive results from STS-21-G's experiments.

Challenger de-orbits on Flight Day 15, the mission has stretched the Shuttle's orbital endurance to the maximum, requiring extra fuel for the fuel cells to complete the whole mission.

screenshot3947.png

screenshot3948.png

screenshot3949.png

screenshot3951.png

screenshot3952.png

With this successful flight, Challenger has tied Enterprise in total flights at 7, while Columbia leads the way with 8. Enterprise has spent the past year and change in Palmdale undergoing her first Orbiter Maintenance Down Period, intended to fix a lot of the existing issues with Enterprise. Challenger is also heading to Palmdale after this flight for some maintenance and a small refit of a few systems.

As May begins, Columbia rolls out to 39A. Apollo 27's preparation phase is due to begin soon, while the Soviets look eagerly towards returning to the Moon in the next few months.

If the Soviets can succeed with Luna 9 and future missions, a revitalized Moon Race looks to be a possibility.

График разработки ракеты-носителя "Энергия" оптимален с расчетом на статические испытания единиц к началу 1983 года.

 

Edited by track
Link to comment
Share on other sites

I've read it as well, and its very insightful to the Challenger disaster because of the failure of NASA to comprehend the SRB cold sealing issue.

 

Its interesting, because in the book, Mike was coming close to losing his job over the deal with burning the OMS engines on the ascent to "put another zero behind the already conservative figures of the safety of africans" or something close to that effect. However, Young really did care about the astronauts, and was very involved in the safety of the shuttle. As in this alternate timeline, i feel as if the challenger disaster wont happen because instead of having a bureaucrat in power, we have an astronaut. Someone who knew the risks of spaceflight. This is pretty smart way of avoiding having to (maybe) kill of 7 kerbals. Very creative.

Link to comment
Share on other sites

A New Era of Cooperation

As May begins, NASA is ready to begin the second Advanced Apollo mission: Apollo 27. This mission will study the southern highlands between Mare Imbrium and Mare Serenitatis. This mission is also notable for being the first space mission with a Western European as a crew member. The Soviets had already flown astronauts from the Warsaw Pact states into space on Soyuz, but with the rise of ESA they selected 4 astronauts who were sent to NASA for training, with 2 of them having been selected by NASA in their most recent Astronaut Group 9. On this mission, Dutchman Wubbo Ockels will be the first West European in space, and the first West European on the Moon. ESA is thrilled by NASA's welcoming of their astronauts, and the partnership between the two agencies is growing stronger every year. It has been the birth of a great partnership, one that will continue into the 1980s.

Columbia rolls out to 39B on April 30th, with the Habitat Module and supplies being loaded into the payload bay on May 6th. The crew perform a launch rehearsal a day before that on the 5th. The mission first attempts launch on May 9th, however an issue with the LH2 TSM leaking during fueling delays the launch to the night of the 10th. Technicians work around the clock the 10th to repair the TSM, and their efforts are successful. As fueling begins, no leaks are detected, and Columbia is GO for launch on May 10th, 1981.

MISSION OVERVIEW: STS-41-D |

Commander | Robert Overmeyer

Pilot | John Creighton 

Apollo 27 Commander | Robert Crippen

ALSM Pilot | Frederick Gregory

Scientist 1 | Sally Ride

Scientist 2 | Norman Thagard

Specialist 1 | James van Hoften

OV-102 "Columbia"

Objectives: Support Apollo 27 lunar mission.

A serene night liftoff of Columbia.

"Solid Rocket Motor Ignition and LIFTOFF of Columbia, supporting another manned mission to The Moon!"

screenshot3959.png

screenshot3962.png

Once on orbit, Columbia releases and docks with the Habitat Module, now beginning another one of the "most boring Shuttle missions" as they await the ALSM and LTV.

On May 14th, the Saturn III takes flight carrying the ALSM.

screenshot3970.png

screenshot3972.png

The ALSM successfully docks to the Habitat Module 15 hours after launch. The crew have to wait a whole week though, until the might Saturn A07 takes flight with the final piece of the mission.

screenshot3980.png

screenshot3984.png

The LTV saw a lot of improvements for this mission. Most notably revised solar arrays and better tank insulation. The engine as well saw a whole host of improvements, which will hopefully fix that overheating issue.

Successfully docking with the Habitat Module 16 hours after launch, the Apollo 27 stack is completed, and their crew settled in. Columbia returns with her 2 remaining crew of Overmeyer and Brandenstein, landing at the Cape.

With the Shuttle back on Earth, Apollo 27, now under the name Mayflower, begins Trans-Lunar Injection.

"Mayflower, Go for TLI."

screenshot3987.png

TLI is successful, with the NTR motor having much better thermal characteristics.

A small correction is performed the next day for a proper lunar encounter.

screenshot3988.png

3 days after TLI, a trio of burns put the LTV, and Apollo 27, in Low Lunar Orbit.

screenshot3990.png

A few hours later, 4 Americans and 1 European are preparing to descend to the lunar surface.

screenshot3991.png

(Note again: One more mission until I actually settled on an ALSM design, sorry for this inconsistency I just dabbled with a lot of designs. :))

screenshot3994.png

screenshot3996.png

"1000 feet. Velocity is nominal."

"800 feet."

"600 feet."

"400 feet."

"200 feet."

"100 feet."

"75."

"50."

"30."

"20."

"10."

"CONTACT LIGHT."

"SHUTDOWN SHUTDOWN."

"Houston..."

"Mayflower has landed."

screenshot3998.png

15 minutes after landing, the solar arrays would be extended.

screenshot3999.png

The crew were given a few hours to rest after landing. But at 10:00 AM in the US, and 5:00 PM in the Netherlands, the crew begin their descent down the ladder to the surface.

Ockels would be second out, and upon stepping off the ladder onto the lunar surface, he would give the world these remarks.

"I can't begin to describe it. The wonder of this place. I am so captivated by its beauty. We are pushing the boundaries of what is possible, in this new era of cooperation."

Adequate words for a remarkable mission.

The first few days of the mission won't exactly be thrilling. Why? Well the astronauts are waiting on some wheels.

On May 24th, the first (and only) Saturn A02 takes flight carrying the Enhanced Exploration Roving Module, or EERM. This rover will permit greater travel across the lunar surface for the mission.

screenshot4003.png

screenshot4005.png

The EERM eventually arrives at the Moon on the 27th, and a modified LM Descent Stage brings it to the surface near the landing site of the ALSM.

screenshot4014.png

Once on the surface, the Apollo 27 crew retrieve it, and test its instrument arm on a nearby rock formation to verify it is functioning properly.

screenshot4019.png

screenshot4021.png

The EERM is definitely a big step up from the LRV, however it begins to show some uhh... issues.

screenshot4023.png

On May 28th, the crew embark on Geology Expedition 1. The main objective of Geology Expedition 1 is to setup a station on a hill about a dozen or so kilometers from the landing site. The pressurized EERM rover makes this traverse much more easy on the astronauts.

However not so much on the driver of the EERM. The little rover has shown to be just a tad unstable over uneven terrain like this, due to its narrow wheelbase and decent amount of power. The short porch at the back also has its drawbacks, leaving much of the equipment to be kept inside the rover, leaving less space for the crew.

These issues already have some people thinking about a redesign, but that's a problem for the future. The crew are stuck with this fella for now.

screenshot4032.png

After the world's slowest 12 kilometer drive, the crew arrive at the intended site, and set up their equipment, before returning to the ALSM.

3 more of these expeditions are conducted to various sites before the end of the mission.

screenshot4034.png

One big thing noticeable in the news, however, is the lack of Luna 9. Despite the Soviets boasting of their new and improved lunar mission to come while Apollo 27 is on the surface, it didn't. By the time Apollo 27 departs on June 8th, the Sokol rocket intended to launch the LK-700 is still in its assembly hangar, lacking the upper stage and LK-700.

Regardless of the no-show Soviets, Apollo 27 has been the most scientifically valuable moon mission to date, with a successful ascent back to the lunar surface on, as I mentioned, June 8th.

screenshot4047.png

screenshot4050.png

Trans-Earth Injection is successful, and Mayflower is heading home.

screenshot4051.png

Arriving back at Earth on June 11th, the LTV performs 2 maneuvers to bring the mission back into Low Earth Orbit.

screenshot4054.png

The MPCS then launches right on time June 12th, to return the crew.

screenshot4056.png

Once the MPCS performs rendezvous, the ALSM undocks, vacating a port for the MPCS to dock to.

screenshot4060.png

Once docked, the hatch is opened and the crew board the MPCS, then closing the hatch again, the whole process takes about 25-30 minutes. The surface samples are also transferred into the MPCS as well as returning equipment.

The MPCS then undocks, allowing the ALSM to redock to the LTV.

screenshot4064.png

Despite the once again high costs of the mission, with reuse now possible for Apollo 28, NASA expects the price to drop significantly for the next missions. However, they're still taking a pretty penny out of NASA's budget, which is going to make building a lunar base in this decade rather difficult.

The MPCS then de-orbits, and returns for a splashdown in the Atlantic.

screenshot4067.png

screenshot4069.png

A gentle splashdown, concluding a fantastic mission to the Moon. Welcome home Apollo 27.

screenshot4070.png

Despite its shortcomings in the cost and cadence department, Advanced Apollo is a remarkable achievement for NASA, and a true testament to what they are capable of. Although the future holds a new way of getting to the Moon, Apollo and its funny distant relative will be remembered as pioneering programs.

Family Portraits and Foggy Launches

The rest of June was rather boring for space, the US Navy did begin trials of a big submarine or something though. However, on July 4th, a certain Shuttle returns to the Cape.

Welcome back, Enterprise.

screenshot4078.png

Enterprise left the Cape on December 2nd, 1979, and underwent 18 months of extensive overhaul at Palmdale during her first "Orbiter Maintenance Down Period" or OMDP 1. NASA hopes this has undone a lot of the issues that plagued Enterprise during her early service. Over those 18 months, Rockwell practically took the Shuttle apart and put it back together, with many key systems being upgraded or replaced outright. To summarize the work done:

  • New hydraulics system used by the other 4 Orbiters
  • Roughly 100 miles of wiring replaced
  • Re-seated APU position and new APU exhaust ports
  • Totally replaced aft section engine plumbing
  • New body flap taken from at the time under construction Atlantis
  • Structural strengthening in the mid fuselage
  • New RCS plumbing
  • 15,000 TPS tiles replaced

 

With all of those upgrades and changes, on top of general repairs and maintenance, NASA hopes Enterprise will be on par with the later Orbiters of Discovery and Atlantis.

Since all Orbiters are finally on the ground at the same time, and Discovery a few weeks from rollover to the VAB for 41-E, NASA decides to take some family photos.

The result are some of the most awe-inspiring images ever.

All 5 Orbiters, in one image.

screenshot4084.png

screenshot4088.png

These photos became an instant PR success, headlining many newspapers the day after their release.

But once the photos were taken, the Shuttles were rolled back to the OPF, with Enterprise going to a hangar near the OPF for some extra work. Discovery would be set upon the Orbiter Transporter System, and rolled over to the VAB to be stacked for her next flight, STS-41-E.

This is a routine mission to Skylab, carrying a new 5 person crew and supplies for their stay. But it would turn into an interesting series of events leading to one of the most magnificent launches to date.

Discovery would be stacked on the side of the External Tank on July 25th, with a morning rollout ahead of some rain on August 8th. 

A successful rehearsal on August 15th, with the countdown winding down on August 20th for launch.

"T-12, 11, 10,"

"9,"

"We have a Go for Main Engine Start,"

"7, 6, 5,"

All engines running, 3..." 

screenshot4099.png

"Cutoff. Shutdown Shutdown."

"We have a Redundant Set Launch Sequencer Abort."

screenshot4098.png

For the first time, the Shuttle's onboard computers triggered a launch abort right as the Shuttle's main engines started up.

Thankfully, the problem wasn't too serious, as it was a simple bit error in the system monitoring engine startup, which gave a wild reading and triggered a shutdown of the engines. After some software tweaks on the pad, and replacement of the HBOIs in the Tail Service Masts, Discovery was ready to launch again 3 days later on August 23rd.

But as the countdown proceeded, the fog rolled in to the KSC, leading to a spectacular launch.

"T-12, 11, 10, 9, We have a GO for Main Engine Start, 7, 6, 5, all 3 engines running."

screenshot4110.png

"3, 2, 1..."

"BOOSTER IGNITION AND LIFTOFF OF THE SPACE SHUTTLE DISCOVERY WITH THE NEW CREW OF SKYLAB!"

screenshot4111.png

screenshot4115.png

The fog amplified the brightness of the SRBs, turning night into day at the KSC as awestruck spectators watched the Shuttle climb into the night sky.

screenshot4120.png

The mission is otherwise standard, with a successful 1 week stay on the station.

screenshot4130.png

Discovery de-orbits on Flight Day 10, for a landing at the Cape.

screenshot4144.png

screenshot4146.png

screenshot4152.png

With the conclusion of STS-41-F, NASA now heads into the end of 1981 with just one Shuttle launch remaining. 1981 hasn't been the Shuttle's strongest year, but 1982 is set to have a flurry of activity.

Dos DOS and The SPAM

1981 winds down rather calmly, with only a few notable events.

On October 10th, the second DOS module of Salyut 7A launches aboard a Sokol B. The third DOS was deemed unnecessary after some cost analysis, and thus this is the second and final component of the station.

screenshot4154.png

screenshot4161.png

screenshot4162.png

screenshot4165.png

Salyut 7A now complete. Nothing too fancy, but it'll do until Mir comes around.

Speaking of Mir there has been a lot going on with that station. With Valentin Glushko gaining ever more power within the Soviet space program, he has pushed more and more for his new Energiya rockets to be involved. After a few months of some tug of war between him and the other design bureaus involved with Mir, he got his way. Mir will look quite different from its original design, with VKK and Energiya being pushed more into the design. With this new design, the Soviets hope to really compete with Skylab.

The politics of the Soviet space program have many worried, it's become a war for fame and getting your way, and it's one of the (many) reasons the centralized and well organized NASA has pulled so far ahead. If the Soviets want to stay in this thing, they might have to learn a thing or two from their enemy.

As the Soviets ponder their future, NASA is pondering the ice caps. As they prepare to launch the final Shuttle mission of the year, STS-41-F. This is the second flight of Shuttle Atlantis, and will carry the GLACIER satellite to orbit. The Shuttle is also carrying the second SPAS on this mission. GLACIER's deployment will be a little unique because of how its being stored in the payload bay.

You see, most Shuttle payloads are integrated into the payload bay on the launchpad through the Rotating Service Structure. This is an interesting way of doing things, but it works. To make this process easier for some payloads, however, NASA has developed the Universal Shuttle Payload Carrier. Functioning more traditionally, all you have to do is put your payload in the USPC, which is then loaded into the Shuttle's payload bay with ease. It minimizes the work needing to be done, and eases any technical challenges.

GLACIER will be the first to use the USPC. 

Containers aside, Atlantis lifts off into the afternoon skies on November 10th, 1981.

"AND LIFTOFF OF THE SPACE SHUTTLE ATLANTIS AND THE 5 CREW OF MISSION 41-F!"

screenshot4176.png

screenshot4179.png

screenshot4181.png\

download2.png

I told them to not point it near the Sun, but do they listen to me? No.

Now on orbit, the astronauts can look out the aft flight deck to see the USPC and SPAS II.

screenshot4191.png

GLACIER is deployed on Flight Day 3.

screenshot4198.png

GLACIER requires a polar orbit, and although Atlantis has launched into practically the highest inclination the Shuttle can get to from the Cape, it's not quite enough, so a kick stage has been made. While some consider it to be just a "Star 48 glued to an IUS avionics bus" NASA calls it the SPAM, or Shuttle Payload Assist Module, because everything needs an acronym, and frankly this is an excellent one.

screenshot4201.png

GLACIER will use the SPAM to raise its apogee at the right time, which will make correcting the inclination with its own propulsion easier.

After a few days, GLACIER is operational, and ready to monitor polar ice levels.

screenshot4203.png

Atlantis returns to a lower orbit, and deploys SPAS II.

screenshot4208.png

The mission was originally intended to go for longer to allow the SPAS experiments to, well, go longer, but Fuel Cell issues have cut the mission short, so on Flight Day 7, SPAS II is retrieved.

screenshot4219.png

The retrieval was a bit odd, but nevertheless it was retrieved, and the crew get a few hours of rest before Atlantis de-orbits for a landing at the Cape.

screenshot4221.png

screenshot4223.png

screenshot4226.png

screenshot4228.png

With the landing of Atlantis, the Shuttle's year for 1981 is concluded. Although not exactly a record setting year, it has paved the way for what is set to be an exciting year in 1982 and in 1983. 

Enterprise rolls out to 39B on December 15th, ahead of its planned return flight on January 10th. The oldest Shuttle will kick off the new year.

screenshot4232.png

NASA is optimistic for the new year, with the appointment of John Young as NASA's new Administrator, the agency seems to be taking a step in the right direction for the future. The Shuttle will continue to be at the forefront of exploration, and many other systems will soon join it in NASA's fleet.

But the Soviets, oh those Soviets.

They're heading for a comeback.

Link to comment
Share on other sites

Addendum

This is to cover some things I missed in the last post, mainly some smaller but important events.

June 1981: Saturn IG display opens at the Kennedy Space Center

The last built Saturn IG, which was ultimately not needed for flight, has officially gone on display at NASA's Kennedy Space Center, it is displayed horizontally next to the Saturn V first stage near the VAB. NASA hopes to eventually move it to a new visitor center.

August 1981: Voyager 2 Flyby of Saturn

The Voyager 2 spacecraft flew by Saturn in August, just 10 months since Voyager 1 did the same. It is now heading towards Uranus for a flyby expected at the start of 1986. Voyager 1 is now on its way out of the Solar System, leaving Voyager 2 to complete the Grand Tour.

October 1981: NASA orders development of expendable SSME variant for the Shuttle-Derived Launch System

NASA has contracted Rocketdyne to develop a simpler, and cheaper version of the Space Shuttle Main Engine for the SDLS rockets. NASA was originally considering a reusable engine pod for the new launch vehicle family but that has been moved down the line as a potential future upgrade.

November 1981: NASA enters final stages of SDLS design.

The SDLS rocket's design is nearly finalized, and NASA expects to contract out the design in the first quarter of 1982.

December 1981: Reagan visits Kennedy Space Center for the first time

President Ronald Reagan visited the Kennedy Space Center on December 15th, 1981, touring many facilities including the VAB, OPF, Mission Control, and Launch Pad 39A. The President also got a close up view of the under construction SAB. Reagan remarked "This place is a true testament to the capabilities of America's space program, and I put my full faith behind this excellent agency and the men and women part of it."

 

Link to comment
Share on other sites

A New Year

1982 promises to be another exciting year for space exploration. The Shuttle is poised to finally break its record 7 flights in 1979, which was tied in 1980. There are 9 scheduled Shuttle missions for this year, with a few being incredibly important.

To kick things off, on January 3rd, NASA officially begins development of the Apollo Advanced Crew Operations Vehicle, or ACOV as it is usually known. This upgraded and modernized Apollo spacecraft will be the backbone of the Apollo Follow-On Program, which still doesn't have an official name for it yet. ACOV needs to be ready by 1984, which is when NASA needs it to be tested and considered ready for operation for the first AFOP mission, which is simply called AFOP-1 for now. ACOV has its doubters within the agency, as its launch system (the Shuttle) will have to be pushed to its absolute limit to get ACOV and its yet to be determined lunar boost stage into orbit. But with the SSME's continual improvement and uprated thrust provide the necessary performance.

But they're not just talking about ACOV on the Shuttle, it's also how some see it as a bit of a downgrade from Advanced Apollo. As compared to the mighty LTV assembly, 5 astronauts in ACOV on their way to the Moon alone isn't as grand or seemingly as capable. However, NASA sees ACOV as a proper re-focusing. These are only support vehicles, NASA's ultimate goal is a Moon Base, it has been since they began lunar exploration. ACOV's design is that of simplicity, utilitarianism even. It is an advanced and capable spacecraft, without a doubt, but it is designed to get the job done, that's it. With AFOP, there will only be 2 launches necessary for a lunar mission to get underway, 3 if refueling a nuclear tug for the ALSM is necessary. ACOV can launch and return the crew, which does remove MPCS from the architecture. However, ESA are finding other ways to contribute and get seats.

Speaking of nuclear tugs, the NERVA program, now re-organized into the Office of Nuclear Propulsion, has been directed to develop a new nuclear tug. This tug, under the working name "LTV Mk. II" will be a solely cargo focused tug, intended to carry the ALSM to lunar orbit. The current in-development concepts have 5 smaller NTR motors, with lessons learned from the large NE-G3 engine used on the original Lunar Transfer Vehicle. While it isn't solely for the ALSM, that will be its primary payload. The tug and ALSM are intended to be launched together aboard a larger config SDLS rocket, where the tug will then put the ALSM in lunar orbit, where it will await ACOV.

The ALSM is also seeing concept studies for it to become reusable, but there's nothing finalized on that yet. On top of that, NASA is beginning to lay out plans for a Lunar Space Station, under the name "Tranquility Space Station" as it will be known. This station is where ACOV will refuel in lunar orbit before returning home. As well as being an important place for experiments, samples, and other equipment to be stored before being returned to Earth.

This is the architecture of AFOP coming together, into a consolidated standard mission plan. At this point, NASA hopes they can get each AFOP mission to be less than 325 million dollars (~1 billion today) which is a massive cost reduction from Advanced Apollo, allowing NASA to hopefully conduct upwards of 3 missions per year, leading to a full fledged lunar base in the late 1980s, if all goes to plan. There are still a lot of things to be worked out, but the Apollo Follow-On Program is showing great promise.

Moving away from lunar programs, NASA's last year has been certainly interesting. Reagan, whether intentionally or not, has started a cultural revolution for NASA. The leadership of John Young is a stark change from that of the prior 2 decades. NASA has been lead by many great men, but for the first time it is being lead by an astronaut, someone who has been to space, someone who has experienced and truly understands the magic of spaceflight. Young has already spearheaded many popular changes. Improved employee benefits, higher salaries, and an overall positive reinforcement of good work culture and proper practices. Many NASA big-wigs have also been replaced. This massive shift from a huge bureaucratic leadership tree has been a breath of fresh air for everyone, and has allowed the agency to rid itself of many of the negative lingering culture and management issues that have been around since the late 60s.

This "Cultural Revolution" has so far been positive for NASA, although it is not evenly spread throughout the agency. The Shuttle program has, unfortunately, kept many holdouts of former leadership and a continual lingering presence of... shall I say suboptimal practice.

This is the thorn in NASA's side, and removing it will be very painful, but worth it in the long run.

With their affairs in order, there is a Shuttle on the launchpad to kick off the new year.

Enterprise is ready for flight again.

STS-51-A is intended to deploy the Solar Orbiting Observer, or SOO spacecraft. As the name suggests, SOO will orbit the Sun and study it. An interim upper stage and Star 48 are onboard to boost the spacecraft into its intended heliocentric orbit.

The launch is GO on January 10th, 1982.

"T-12, 11, 10,"

screenshot4245.png

"We have a Go for Main Engine Start,"

"7, 6, 5, 4,"

screenshot4246.png

"We have Main Engin-"

screenshot4248.png

"Shutdown."

"We have had an RSLS abort."

"NO DATA FROM ENGINE 3."

"Houston there's red lights all over the place."

"Copy Enterprise, we're looking at what happened."

It would take 2 tense hours to ensure there were no more hydrogen fires at the pad, and get the crew out of the Orbiter. The footage from the pad cameras already indicated a very unusual event occurring with Engine 3, but when technicians performed inspections the next day they were stunned. The injector plate was ripped open, and many of the cooling channels in the nozzle were open as well, everything else was charred or otherwise damaged inside the engine. It is a near miracle that the engine didn't outright destroy itself.

NASA rolls Enterprise back into High Bay 1 on January 18th, and on the 20th Engine 3 is removed, where the extent of its damage is more visible. The engine is then sent to NSTL in Mississippi where NASA and Rocketdyne technicians will take it apart and figure out what happened. 

Moving back to Enterprise, the other 2 engines are removed just in case, and the set of engines designated for Atlantis due to fly next on 51-B are given to Enterprise. This work takes place over the rest of January and most of February.

The Shuttle program truly has no idea how lucky it was with Engine 3 still being in (mostly) one piece. Administrator John Young is rather involved after the incident, and visits Enterprise in the VAB while the engine in question is removed. He makes it of the utmost importance for the program to understand and rectify the issue. Which is partially responsible for the engine being sent to NSTL.

While NASA scratches its head over what exactly happened, the Soviets launch the first crew to Salyut 7A.

screenshot4254.png

screenshot4255.png

This crew will stay at the new station for 3 months, before returning home.

On February 20th, as Enterprise prepares to return to the launchpad, Rocketdyne submits the report on the Engine 3 malfunction. In the summary at the end, they state the following:

"No.3 Engine had 2 disabled injector posts, these posts are disabled by golden pins that are pushed up inside the injector. During the startup of No.3 engine, both disabling pins came loose, going through their injector, down through the injector plate itself, before hitting the wall of the nozzle, striking the cooling channels along it. The rapid and unusual sensor data triggered the RSLS to abort the launch. The engine in question is no longer flyable, and will be retained by Rocketdyne to, with the help of NASA, better understand fringe failure scenarios like this one."

It is, quite simply, such an odd failure scenario. But NASA and Rocketdyne have agreed to work on a better method of handling disabled injector posts.

The press is very confused, and can you blame them? A golden pin to disable an injector post? The press don't even understand what that means but they can clearly see it's a sketchy idea. This results in a lot of negative press for NASA, but they have no idea that it's just the tip of the iceberg when it comes to the agency's issues. Issues that are, although actively being worked on by the new leadership, still linger especially in the Shuttle program.

However, NASA must move on and continue. Enterprise is rolled back out to 39B on February 25th. NASA decides to, finally exercising a bit of caution, conduct an FRF on February 29th to ensure the engines are all in working order for launch, slated for March 3rd. The FRF is a successful 20 second test, and final preparations are completed as Enterprise is GO for launch on March 3rd, 1982.

"BOOSTER IGNITION AND LIFTOFF, liftoff of Space Shuttle Enterprise, returning to flight on the 30th Space Shuttle Mission!"

screenshot4273.png

screenshot4278.png

screenshot4280.png

Enterprise is now in orbit for the first time in nearly 2 and a half years.

Keeping with the theme of the mission, there are multiple issues with SOO's deployment, that push it all the way to Flight Day 3. But eventually, SOO and its boost stages rise out of the payload bay.

screenshot4288.png

The series of 3 motors then later begins to boost SOO into heliocentric orbit.

screenshot4289.png

screenshot4291.png

The boosting phase is successful, and SOO deploys its many magnetometers and other instruments to begin its mission of solar research.

screenshot4292.png

Enterprise then de-orbits on Flight Day 4, for a landing at Edwards AFB.

screenshot4294.png

screenshot4297.png

screenshot4300.png

screenshot4301.png

screenshot4303.png

Enterprise has returned to space, in the most characteristically chaotic way. She is slated to fly again later in the year, and will be returned to the Cape by the Shuttle Carrier Aircraft for processing.

NASA has gotten through this first mission of 1982, hoping that the others will be much smoother.

The next one, maybe mercifully, is! Atlantis performs a standard Skylab supply run and crew rotation on STS-51-B, launching into the night skies on March 30th, and returning on April 9th.

screenshot4328.png

screenshot4344.png

screenshot4366.png

STS-51-B is what the Shuttle, and NASA overall, needed after 51-A. Just a simple non-chaotic run to Skylab, which the Shuttle is getting pretty good at. 

With a month break until the next Shuttle flight, NASA is doing some public work for some major projects. Most notably publishing information about the planned Jupiter Orbiter spacecraft, which is now to be named Galileo in honor of the famed astronomer. This spacecraft is getting underway with assembly by now, and is slated to launch in 1985 aboard the Space Shuttle with Centaur.

For the current Jupiter Orbiter, NASA has officially set the End Of Mission (EOM) for Perdix in 1984, where it will flyby Ganymede to be sent out of the Jovian system and into a heliocentric orbit. The spacecraft's aging solar arrays are producing less and less power, while it runs out of propellant as well. Perdix has made many incredible discoveries, and laid the foundation for future exploration of Jupiter and its moons.

NASA also announces The Mars Collection, which is a series of 4 spacecraft to be launched in 1984 and 1986 to study Mars. 2 of them are practically new Viking missions, with an orbiter and a lander. The other two are solely Orbiters that will study Mars as well as its moons Phobos and Deimos.

For a long time NASA has wanted to ramp up its robotic programs again, but the funding consumption of the Shuttle and Advanced Apollo, coupled with the shrinking budget in the 70s, prevented that. Now NASA has the opportunities to explore the Solar System once more.

Speaking of the budget, Reagan submits his to Congress. This request is rather generous to NASA, not simply holding their funding, but finally increasing NASA's budget for the first time since 1972. The budget equates to 8.4 billion dollars (26 billion today) compared to the current budget of 7.2 billion (roughly 22.4 billion today) which is a considerable increase. Reagan has pledged that this is "just the beginning" and that he plans to provide the agency with more funding over time. The atmosphere is electric in NASA after this, the gates of opportunity are finally swinging back open. Which has lead many to begin thinking about where they've been wanting to go for so long.

But for the Soviets, they are at a time of re-focusing, as their manned lunar program has been officially cancelled. Despite its early 70s success it could not keep up with NASA and Apollo, even with planned efforts to change the mission architecture. The Soviets are now focused on 3 main things.

  • Mir
  • Robotic spacecraft
  • VKK

These 3 things will be the future of their space program through the rest of the decade and beyond. But they're not giving up on the Moon entirely.

They're thinking about getting on NASA's good side.

What better way to start than with a meeting in Low Earth Orbit?

 

НАСА приняло наши предложения по испытательному полету «Союз-Шаттл» с единственным условием, что астронавты не допускаются на палубы экипажа шаттла. Мы считаем эти условия приемлемыми и готовы к сотрудничеству.

Link to comment
Share on other sites

Shuttle-Soyuz and The Rise of Ariane

     It's almost poetic, isn't it? The fiercest rivals coming together for a mission of cooperation in space. After 25 years of competing to be first in space, NASA and the Soviet space program are coming together for an incredible joint mission. A mission that will bring together the Soviet's trusty Soyuz spacecraft, and America's shiny new Space Shuttle. An incredible mission what will pave the way for future joint missions and international cooperation. That's at least how it seems on the surface, but those who are in the know, the Shuttle-Soyuz Test Project is an uneasy one. The Air Force mildly losing its mind over the national security threat this poses. NASA, in an act of appeasement, makes it a stipulation that the Soviet cosmonauts will only be allowed to enter the docking adapter, and go into the Spacelab module in the Shuttle's payload bay. The Soviets didn't really care about this, not like they needed to see the Shuttles flight decks anyway.

     However, it isn't just the "national security risks" that have placed a whole metric ton of tension on this mission. Simply the very idea of this cooperation would've been unthinkable just years ago. It's especially uncanny considering the current administration of Ronald Reagan, which seems to be foaming at the mouth to kill this joint mission if it finds even the slightest excuse to do so. But NASA, and the Soviets, know that very well. The USSR has been as cordial as possible make this mission work. But why? It's almost an uncanny level of cooperative behavior coming from a nation who but a year or two ago was shaking its fist in the UN every time the US spoke. This is something they've been subtly aware of ever since the Soviets unexpectedly approached NASA for the mission. What are they getting at?

   As has been said, the Soviet lunar program is cancelled, and there is no hope of it coming back anytime soon. With that painful truth accepted, they don't want to give up on lunar exploration by any means. And with a potentially gloomy future on the horizon, the Soviet space program could benefit from being on America, and NASA's, good side. So when they approached NASA about the Shuttle-Soyuz project a few months prior in December 1981, they hoped that it would lead up to potentially getting a seat on an Advanced Apollo mission. Gaining experience from working with NASA could potentially allow for a future revival of the lunar program. money allowing.

This is the genesis of SSTP, and a foundation for future cooperation that once seemed impossible. 

     Space Shuttle Atlantis was shoehorned in for mission 51-E, originally cancelled in September 1981 but re-added for SSTP. There will be minimal modifications needed, just the Soviets having to provide some technical help on a docking port swap to the passive Soviet port. The two countries did start developing APAS-75 together in the early 70s, but the Soviets dropped out of the project leaving the US to finish it themselves and adapt it for use on Skylab and the Shuttle. Therefore the Soviet version was never developed and thus it cannot be used for this mission. With this minimal preparation, the two countries agreed on an August 1982 date for the mission, with specific dates to occur closer to launch when logistics provide a clearer estimate.

     The public's reaction to the mission was mixed if not slightly negative in some regards. It's still the Cold War and while there has been progress towards better relations between the two superpowers, it's still rather frosty, and Reagan's attitude hasn't gone a long way towards improving that. But NASA sees it as a crucial opportunity to bridge a gap that has grown wider and wider in the 25 years of the Space Race, and a chance to bring the Soviets together with ESA and now Japan as partners for space exploration. The possibilities are near limitless if Shuttle-Soyuz goes right, and that's something NASA is excited for. Even if the Soviets are just trying to piggyback, it's better than nothing.

     Thus, with the mission slated for August, NASA moves to prepare Atlantis for the mission after returning from STS-51-B. As ESA looks towards its own future with a potential change upcoming.

screenshot4370.png

     This is the Ariane 1 rocket, now under the operation of the first commercial space agency, Arianespace. In a slight kick in the back to the Europa rockets, CNES (France's space agency) has funded this rocket's development significantly, and has been trying to twist ESA's arm into getting it to replace Europa, but why?

screenshot4374.png

Well, because it's better than Europa. That may be harsh but it is the case. This one rocket has already with 5 launches disrupted the commercial market, a market that the Shuttle is trying to break into. It has superior capabilities for a low cost, and has potential for easy future upgrades. Thus France has slowly but surely worn down ESA on Ariane, and it seems like Europa's days are numbered, as Ariane rises to take its place. This change also effects MPCS, as it will likely be the last to fly aboard Europa when it retrieves the crew of Apollo 28 at the start of next year.

This launch of Ariane 1 on May 2nd carried 4 German telecommunications satellites, further proving the launch vehicle's reliability and capability to deliver service.

On May 14th, Shuttle Challenger launches on mission 51-C for the Department of Defense. The payloads are classified, running under the suspiciously vague codenames "Monday" and "Tuesday" to keep everyone guessing.

The mission is successful with the DoD stating the payloads were deployed and are now operational afterwards. Challenger lands at Edwards on May 18th to conclude the mission.

screenshot4429.png

screenshot4435.png

Bundling up the Shuttle missions here before SSTP, Americans enjoy a Shuttle launch during their 4th of July afternoon festivities as Discovery launches mission 51-D carrying the second TDRS satellite to orbit. With a landing at the Cape on July 8th.

screenshot4466.png

screenshot4489.png

screenshot4502.png

With the lead up missions out of the way. SSTP is NASA's primary focus. The new docking port is installed by early July, and Atlantis is rolled over to the VAB and stacked from July 18th-20th. With fit checks complete and Spacelab already in the payload bay, the Shuttle rolls out to 39B on August 6th, with launch now targeted for August 14th. 

As the sun begins to crest over the horizon on an August morning, Space Shuttle Atlantis takes to the skies on a mission of international cooperation.

"BOOSTER IGNITION AND LIFTOFF! LIFTOFF OF SPACE SHUTTLE ATLANTIS PIONEERING A NEW ERA OF COOPERATION IN SPACEFLIGHT!"

screenshot4534.png

screenshot4537.png

screenshot4543.png

Once in orbit, Atlantis awaits Soyuz, scheduled to liftoff the next morning.

And liftoff it does! Soviet state television broadcasts the launch to the world, which is played on American news networks, allowing for the first time Americans to see a live Soviet rocket launch.

Soyuz launches successfully, and reaches orbit. Rendezvous will take about a day.

screenshot4556.png

On the Shuttle's third day in orbit, visual on Soyuz is acquired, as the sturdy little Soviet spacecraft movies in closer to dock. Both spacecraft move closer and closer, until Soyuz is aligned for the final approach to dock.

screenshot4558.png

screenshot4559.png

screenshot4560.png

"25 feet."

"Soyuz approaching now at a velocity of 1 foot per second."

"20 feet."

"15 feet."

"10 feet."

"Atlantis stabilizing now."

"5 feet."

"Soyuz slowing down to half a foot per second."

"3 feet."

"2."

"1."

"LATCH."

"DOCKING CONFIRMED!"

screenshot4562.png

Mission controls in both Houston and Moscow erupt in applause, as docking is confirmed.

For the next 20 minutes, proper docking connection is verified, and the crews prepare to open the hatch and meet. 

26 minutes after docking, the hatch would open. With Charles Bolden greeting the Soyuz commander Vladimir Vasyutin with a handshake. A photo would be taken of this "handshake in space" by Mary Cleave and on the Soyuz side by Victor Savinykh. 

screenshot4564.png

The cosmonauts would be awestruck by the scale of the Space Shuttle. With the Spacelab module in the payload bay being just about the size to hold Soyuz within it. 

The crews would begin 6 days of joint research in Spacelab, with focuses on flowering plants in zero gravity, and some space chemistry! The crew would also perform medical research, studying how pharmaceuticals could be produced in space for treatment on long-duration missions.

After these 6 groundbreaking days, the crews bid each other farewell, and Soyuz undocks from Atlantis, to return home. While the Shuttle would remain on orbit for another day.

screenshot4566.png

screenshot4572.png

Atlantis de-orbits the next day on Flight Day 10 for a landing at the Cape.

screenshot4576.png

screenshot4579.png

screenshot4580.png

A groundbreaking mission concluded successfully. For both sides, SSTP has been exactly what they had hoped for. A positive outlook on future cooperation has been set down, and NASA has stated to the Soviets that they are willing to negotiate to give them a seat on Apollo 30.

However, Apollo 30's future is already in doubt.

 

Some Routine Stuff

     While Apollo 28 preparations are now underway after SSTP concludes, NASA has some business to attend to before that mission kicks off at the end of the year. Most notably, there have been some... issues with Advanced Apollo's 2 remaining mission after this upcoming one that raise questions about its ability to even complete the initial mission set before heading out. This is primarily because of the exorbitant and rising costs of the missions despite the LTV being reused for Apollo 29. Couple that with some of the worst contract structures NASA has ever made, and the hammer is looking likely to come down on the last 2 Advanced Apollo missions. Thankfully AFOP is well into development, and AFOP-1 is expected in 1985. Lessons have definitely been learned from Advanced Apollo, with AFOP only needing to fund ACOV and Tranquility for now, with a small portion of the cost going to ALSM reusability work and eventually a large chunk going to base development likely starting next year. This simplification and consolidation is what AFOP will need to be sustainable through the decade and beyond.

     The remaining business is mostly of the launch variety. As on September 19th, Grumman's Satellite Shuttle Vehicle launches a special little mission for NASA. You see, the agency had great ambitions for smaller (relatively speaking) projects and programs before the Great Budget Shrink, but through all of the cancellations one project managed to stay afloat due to its vague goals and low cost. That being the Earth-Moon System Project. The EMSP has faced many delays but it has finally showed up with its first of a few planned missions. This is 11 satellites for the Lunar Gravitational Influence Cluster (LGIC) which is intended to study how the Moon's gravity interacts with objects in Earth orbit. These are small satellites so they are well within the capabilities of SSV.

   SSV lifts off on September 19th, 1982 with the LGIC mission.

screenshot4586.png

screenshot4589.png

screenshot4595.png

screenshot4597.png

Another successful launch for the SSV, and the first step for the EMSP program.

Moving back to the Shuttle, Columbia launches STS-51-F on October 14th, which is the industry standard Skylab supply run and crew rotation. The launch is successful, with the crew of Skylab 15 returning on Columbia, and OV-102 becoming the first Orbiter to fly 10 times. However, the landing is a bit sketchy.

screenshot4657.png

screenshot4659.png

Columbia drifts very close to the edge of the runway during landing, primarily because of the less than stellar nose wheel steering on the Space Shuttle. Coupled with this is a blown tire and severe brake damage from a difficult crosswind landing.

NASA decides to stop landing the Shuttle at the narrow SLF for the time being until they can get a proper fixed Nose Wheel Steering system in place. Which makes Edwards the primary landing site for at least the next year.

Moving on to November, Challenger launches STS-51G with 3 communications satellites. A small note, NASA altered the naming scheme as of 51G to remove the hyphen between the digits and letter of the mission designation. Why? Mainly because it's easier to write and people never use it anyways, also it looks a bit nicer on paper.

Superficial naming scheme changes aside, STS-51G is another beautiful night launch, bringing the Shuttle into the commercial market at last.

"AND LIFTOFF OF CHALLENGER CARRYING A TRIO OF COMMUNICATIONS SATELLITES TO ORBIT!"

screenshot4675.png

screenshot4679.png

screenshot4688.png

The Shuttle is also carrying an array of instruments on a modified payload bay truss known as the Shuttle Fixed Experiment Platform (SFEP) because once again, everything needs an acronym. 4 Getaway Special Canisters (GAS cans) are also present on this payload packed mission. NASA is hopeful that these types of missions, known as "Shuttle Rideshares" will catch on in the commercial market, making the Space Shuttle a leader in commercial satellite launching alongside the up and coming Ariane 1.

Continuing the theme of the mission, Challenger has a gorgeous early morning landing at Edwards.

screenshot4717.png

With that out of the way, the path is clear to cap off 1982 with Apollo 28. Although this may very well be the last Advanced Apollo mission, it is going to be the best one yet by far.

But the Soviets are not happy with their plan not working like they had hoped.

They're going their own way. Again.

 

Stargazer

     To cap off the year, and also start next year, is the most ambitious Advanced Apollo mission to date. Although it may be the last, NASA fully intends for these incredible missions to go out in the best way possible. The landing site for Apollo 28 is on the edge of the Ocean of Storms where the lunar mare and the more standard terrain of the Moon meets. This area has been of great interest to NASA for some time, and it has finally been selected as a mission's landing site.

     Discovery will launch the crew and habitat module, on STS-51H, which will be the final Shuttle mission of the year. This mission will see the Shuttle finally break its 1979 record of 7 flights. NASA is optimistic that the Shuttle can soon exceed 10 flights a year, as the cost continually goes down. This is one of the few "cost positives" currently as NASA calls them. Advanced Apollo of course being the biggest "cost negative" right now. This cost positive/cost negative scale has been somewhat of a budgetary benefit, as NASA has had to adapt to these new plans for sustainability and lower costs. It's not all just about the budget and Congressional pressure, though. These massive contracts are sticking points with NASA management, as they feel the contractors have become complacent with such large and beneficial (for them) agreements.

Funding aside, the Saturn A07 rolls out to 39C on November 28th, with Discovery and Saturn III joining a few days later. The incredible "Moon Rocket Row" as stunning as ever. The A07 launches to refuel the LTV on December 5th in preparation for launch. This is the A07's final launch. Although it didn't do everything NASA had hoped for it, the mighty rocket has set a record that will likely never be surpassed, and demonstrated the engineering prowess of America.

screenshot4749.png

screenshot4754.png

The tanker successfully refuels the LTV, clearing the way for Discovery's launch a few days later.

MISSION OVERVIEW: STS-51H |

Commander | Henry Hartsfield Jr.

Pilot | Bryan O'Connor

Apollo 28 Commander | Donald Peterson

ALSM Pilot | Robert Gibson

Scientist 1 | David Leestma

Scientist 2 | Bonnie Dunbar

Specialist 1 | Frederick Hauck

OV-103 "Discovery"

Objectives: Support Apollo 28 lunar mission.

A winter liftoff on December 9th, 1982.

screenshot4777.png

screenshot4780.png

screenshot4786.png

Since the LTV is being reused for this mission, Discovery is carrying a supply-packed Spacelab instead of the Habitat Module.

screenshot4792.png

Discovery docks with the LTV the next day.

screenshot4797.png

screenshot4800.png

All that's left is the ALSM, which launches aboard what will be the last Saturn III. The Saturn III has made great contributions to the space program in its service, working with the Saturn IG to build Skylab early on, and since then to launch the ALSM for these lunar missions. It also utilizes an incredible feat of engineering in its first stage AJ260X solid rocket motor. The Saturn III will go down as one of the great American rockets, alongside the A07.

screenshot4808.png

The launch is successful, and the ALSM docks with the LTV a few hours later after Discovery vacates the habitat module's docking port.

screenshot4814.png

Discovery would move away from the LTV, and spend another day in orbit itself.

Discovery would land the next day, having to violate the no-landing rule at the Cape due to unfavorable weather at Edwards and White Sands. The landing was allowed due to good weather and minimal crosswind at the Cape.

screenshot4948.png

screenshot4950.png

Meanwhile, the crew of Apollo 28 officially gave their mission the callsign Stargazer, as they prepared for TLI.

"3, 2, 1..."

"Startup."

"Good startup on the LTV's nuclear engine."

screenshot4969.png

After a few minutes, the motor would begin to throttle down as TLI concluded.

"We have good shutdown."

"Waiting for data readback..."

"Trajectory parameters are nominal, Stargazer is on its way to the Moon."

Nominal TLI, with only a small course correction necessary.

3 days later, a trio of maneuvers would bring the LTV back into lunar orbit, making it the first spacecraft to visit the Moon twice!

screenshot4971.png

screenshot4972.png

A few hours later, the crew board the ALSM, and descend to the surface.

screenshot4974.png

screenshot4975.png

screenshot4979.png

"500 feet."

"Velocity is nominal. Descent rate looking good."

"375."

"300."

"225."

"150."

"75."

"50."

"30."

"15."

"5."

"CONTACT LIGHT."

"Houston, Stargazer, touchdown confirmed!"

screenshot4983.png

The crew are given a few hours of rest, before beginning EVA 1.

Apollo 28 will be different, primarily focused on testing the "homestead" camp construction ideas of NASA for AFOP. There will be a few geologic traverses but primarily local area research and the setup of a massive array of instruments. Deep core samples are also of the utmost importance to this mission.

EVA 1 is focused first on the MESA bay being deployed and started, and deployment of the Passive Seismometer Experiment, which is being used for the first time since Apollo 11. The rest of EVA 1 is dedicated to a geologic traverse covering 3 kilometers, before the crew return to the ALSM for some rest and research.

EVA 2 deploys a few more instruments, but is also primarily dedicated to a Geologic Traverse. A notable deployment is the Large Solar Array (LSA) with is a testbed for base solar power.

screenshot4993.png

EVA 3 is solely focused on deploying the rest of the surface instruments. With that, I'll go over all of the instruments deployed.

  • Passive Seismic Experiment
  • Communications Array
  • ESA provided TV camera
  • Heat Flow Experiment
  • Large Solar Array
  • Laser Reflector
  • The uhh... color gnome?
  • Tri-Axis Magnetometer
  • Radio Telescope
  • Lunar Gravity Experiment
  • Ultraviolet Telescope
  • Solar Wind Experiment
  • Ejecta Experiment
  • Active Seismometer

So yeah, there were quite a lot of things deployed on the lunar surface. But this has turned the landing site in a depot of data so to speak, with massive returns from the experiments.

The next 5 EVAs of the mission were primarily focused on geology and site exploration, covering the rest of the mission.

Finally, after a fruitful stay on the surface, Stargazer lifted off from the lunar surface on December 30th, 1982.

screenshot5013.png

screenshot5016.png

A few hours later, the LTV restarts its engine for the Trans-Earth Injection.

screenshot5018.png

Arriving back at Earth on January 5th, 1983, the LTV brings the mission back into Low Earth Orbit. Now awaiting the launch of MPCS the next day.

screenshot5020.png

The MPCS launches right on time, aboard what is likely the last Europa IIB, as ESA transitions to the Ariane rockets.

screenshot5022.png

screenshot5024.png

screenshot5025.png

The crew and their many samples, including one large rock that they dug up which mildly concerned ESA for mass reasons, are transferred into the MPCS, which de-orbits a few hours after undocking.

screenshot5027.png

screenshot5029.png

screenshot5032.png

screenshot5033.png

Despite a slightly rough landing, Apollo 28 is back on Earth with a splashdown in the Atlantic. With the MPCS being hoisted onto the USS Nimitz, welcoming the crew back home.

With that, Advanced Apollo has concluded. Although it didn't live up to the high hopes NASA had for it, the program laid the foundation for sustainable exploration, and has taught NASA many necessary lessons for the future. It will leave a complicated legacy, but a memorable one no doubt.

There will be yet another Moon Gap as NASA makes way for the AFOP missions coming in a few years time.

Thus 1982 is concluded. The year saw many important events for spaceflight, and laid the foundation for many big changes over the next few years. While the Soviets may not be getting their ride to the Moon with NASA, they are determined now to get their own... again.

With a new promising relationship with Japan's space agency NASDA, America's space agency is preparing for the future, with a revitalized culture within NASA, and a promising budget increase for next year. 

Some notes to end the year:

  • The Republicans hold steady in the 1982 midterms, but still lose seats to the Democrats in both chambers, as Reagan pulls the country out of an economic slump as 1983 begins.
  • NASA tests a new version of the Space Shuttle SRB, with a Filament Wound Casing and several other improvements. These boosters with their striking black and white color are intended to be used for West Coast Shuttle launches.
  • Soviet leader Leonid Brezhnev dies on November 10th, 1982. He is succeeded as leader of the nation by Yuri Andropov.
  • Valentin Glushko continues to consolidate power within the Soviet space program, as he pushes for further funding of his Energia rockets.
  • VKK BTS-02 is halfway through its construction.
  • The first SDLS Core Stage is nearing completion at Michoud, and it is expected to be delivered in the summer of 1983.
  • A team from Dryden and Ames present their Space Shuttle Technical Report for December 1982, detailing the future of the Space Shuttle system.
  • Ariane 1 is certified to launch MPCS on December 5th, 1982.
  • ESA and UK Space Agency representatives meet in Paris on November 15th.
  • The UKSA announces a new launch vehicle dubbed "Comet B" set to launch by 1984.

 

Мы рассчитываем поставить фюзеляж ВКК 1.01 не ранее середины следующего года.

Link to comment
Share on other sites

Secrets, Strategic Defense, and Shuttles

     As 1983 begins, let us take stock, and understand where we are. This year is set to be an important one, primarily for the development of future systems as they get closer to their debut. But also for existing systems, the Space Shuttle, Iapyx as it nears Saturn, and practically the whole Soviet space program making a push towards new launch systems.

     For the Space Shuttle, it will be another 7 flight manifest for the year. What was originally a 8 flight manifest was cut down to 7 after Apollo 29 and 30 were cancelled, as STS-61H was intended to be a mission at the end of the year for Apollo 29 support. The Shuttle also has 2 classified missions on the manifest this year. A tug of war continues between NASA and the DoD over flight scheduling for these classified missions. For all the support they put behind the Shuttle, they've become an afterthought on the schedule. This has made the DoD rather upset, and has led them to begin the Complementary Expendable Launch Vehicle program. CELV, as it is called, will provide the DoD with new launch vehicles to replace its aging systems. This unfortunately includes the incredible Hercules rocket, but it won't be replaced until these new vehicles are fully up and running, which is slated for 1987. Martin Marietta is currently leading the way with proposals of an upgraded Titan III rocket. With Lockheed Convair and Douglas being interested but not submitting proposals as of the start of the year.

     The development of CELV could be considered a major blow to the Shuttle program, with the DoD clearly fed up with playing second fiddle to NASA's interest. Even though the Shuttle will fly increasingly more classified missions over the next few years, on top of starting flights out of Vandenberg next year. But it's also to support some big plans coming in the future, in which using the Shuttle alone would not suffice.

     In terms of lunar exploration, NASA has entered yet another "Moon Gap" as they prepare for AFOP to start in 1985. Development of ACOV, SDLS, and the LTV Mk2 are now full steam ahead to meet the deadline. With ACOV dependent on successful demonstration of Shuttle-Centaur in a few months for it's own test flights expected to start in the spring of next year. For ACOV itself, the main development difficulties are focused on the capsule itself, which is practically being turned into a Shuttleified version of the Apollo command module. With thermal blankets on the exterior, redesigned systems, a widened docking tunnel to support APAS-75, and the intention to reuse the capsules brings a lot of modifications to the table. But NASA is nevertheless confident that they can meet the current schedule, especially with support from the President and Congress.

     Speaking of the President, NASA Administrator John Young pays a visit to the White House on January 3rd, to talk about NASA's plans for the future and what they need from the President to put these into motion. The two talk alongside Reagan's Congressional advisors for a few hours, until the conversation shifts a bit. Young brings up Mars, and how JPL and Goddard are implementing a series of 4 spacecraft to pave the way for more intensive Martian exploration. Reagan asks about the agency's aspirations for manned exploration of Mars, to which Young responds very clearly that it is a top priority for the future. Over the next hour, a program is born. A silent agreement was formed between NASA, the President, and Congress that afternoon. Young left the White House with enthusiasm, but nothing was concrete yet, so it had to remain under wraps.

     For the Soviets, they are now fully focused on the development of the Three Focuses (as they are internally called) after their plans for going to the Moon with NASA fell through. Energia continues development, while Mir has now been worked through its soft redesign. Studies are being done by several design bureaus now on robotic missions for the end of the decade. However with the transfer of power following Brezhnev's death to Yuri Andropov, there is unease within those very design bureaus, and the wider space program. They will need support from the government to see these ideas realized. Andropov is mostly content to leave the space program alone, which isn't good but it isn't bad either. Effectively the Soviet space program's situation for the past decade.

     The first Shuttle of the year rolls out a bit early. Atlantis is scheduled to fly STS-61A in late January with TDRS-C, but because the Rolling Beam Umbilical System (RBUS) for Shuttle-Centaur is finally complete, there are some tests that take place on January 8th. The Centaur Integrated Support Structure (CISS) is loaded into the payload bay, and the RBUS umbilical arm is moved into position. A series of retraction tests are then performed to make sure the arm functions properly.

screenshot5037.png

screenshot5038.png

     With these tests completed, the CISS is removed from the payload bay, and TDRS-C loaded in for the beautiful late afternoon launch on January 22nd, 1983.

"0 and LIFTOFF of the Space Shuttle Atlantis carrying the third TDRS satellite to orbit!"

screenshot5056.png

screenshot5058.png

screenshot5064.png

TDRS-C is deployed shortly after launch.

screenshot5065.png

The crew spend the next few days on some research and experiments brought up on the Shuttle, with a landing at Edwards to conclude the mission on Flight Day 4.

screenshot5074.png

screenshot5078.png

     A successful mission to kick off the year, followed immediately by the cancellation of another mission.

     STS-61B was supposed to be the next mission up, manifested for Discovery carrying the GOES-F satellite. However, just 2 days after the launch of Atlantis, there are some... issues that pop up while Discovery is in the OPF. During some power up tests, it is noted that many systems do not in fact power up. Troubleshooting doesn't seem to find a solution, so they begin to dig into the problem. Several panels in the cockpit are removed to find bad wiring connections, and even just some shorted out wires for essential systems. This is the tip of the iceberg for a... small wiring problem on Discovery. There had been hints of this on previous missions, when the HUD would shutoff and come back on, a screen would cutoff and come back on, and maybe a few system glitches here and there. These issues aren't completely unheard of, but everything needing replacement will take at least a month to be isolated and fixed, which means 61B is cancelled. GOES-F is expected to launch on a Delta 3000 later in the year. NOAA (the operators of GOES) aren't exactly thrilled, but they are promised future Shuttle flights so they are mostly handled.

     Because the processing flow never stops, the already completed 61B launch stack is given to 61C, which is a DoD mission to be flown by Columbia. This is a very important mission for the DoD, and they have fought tooth and nail to get it scheduled and flown. But why? Well this mission has some background.

     The KH-9 satellite, it doesn't officially exist as far as the public is concerned but it does, physically, exist. These satellites are on their way out, to be replaced by new optical imaging satellites instead of their film-based system. However, the DoD wants to squeeze as much service time out of these satellites as possible. So, the DoD approached NASA with the idea of the Shuttle maintaining, retrieving film from, and even upgrading KH-9 satellites on orbit.

     61C's test subject will be a testbed KH-9 that failed to fully deploy and become operational when launched a few years prior. Nicknamed Oddball due to this, it will be captured by the Shuttle, and worked on during several spacewalks. 61C is also going to deploy 2 military communications satellites, but the KH-9 servicing thing is the main focus.

     Columbia launches on February 16th, 1983.

"BOOSTER IGNITION AND LIFTOFF of Space Shuttle Columbia on a mission in cooperation with the Department of Defense!"

screenshot5096.png

screenshot5102.png

screenshot5111.png

screenshot5112.png

There has started to be some visible wear on the exterior of Columbia, being the most flown Shuttle this is the most of any Orbiter. It is imperative for NASA to study how the Shuttles wear over time as it sheds light on the stresses of each orbital flight.

The first objective of the mission is deploying the MOOCS military communications satellites. They are deployed on Flight Days 2 and 3.

screenshot5115.png

screenshot5118.png

     On Flight Day 4, Columbia performs rendezvous with the KH-9 to be serviced, and begins a great dance in orbit to capture the spysat.

screenshot5119.png

screenshot5120.png

screenshot5123.png

Utilizing a new RCS pack, the astronauts perform an EVA to prepare the KH-9 for capture, this includes the removal of a few things that would block the capture, including folding in the solar array as much as possible.

After this, the Shuttle captures the satellite, and the work truly begins.

screenshot5126.png

 The KH-9 was captured on a new piece of equipment called the Shuttle Active Capture-Servicing Platform (SAC-SP) which, being a new system, didn't perform a perfectly aligned capture. Thus, the Astronauts perform a "Spacewalk 0" to add locking struts to fully secure the satellite to the platform.

Once this is completed, the crew return to the Shuttle and are given some time to rest.

screenshot5129.png

Returning from the rest period, the crew prepare for Spacewalk 1. This spacewalk will install a new flight computer that will override the KH-9's aging avionics. Some of the most meticulous and difficult on-orbit work is done during this EVA, and many tools had to be built specifically for this spacewalk to assist the astronauts. Nevertheless after 5 hours, the computer is installed.

screenshot5132.png

Spacewalk 2 refueled the KH-9's RCS thrusters, while Spacewalk 3 installed a new star tracker and an optical pathfinder camera to better select targets for observation. 

Spacewalk 5 and 6 were the final planned spacewalks, and would've attempted to install new solar arrays. However, on Flight Day 7, one of Columbia's inertial measurement units begins acting up, and while attempting to troubleshoot the issue, it fails entirely. NASA has to inform the DoD that the Shuttle has to land at the next opportunity, and the mission cannot continue. The DoD is, for lack of a better word upset, but there is nothing that can be done, the Shuttle must return. They must watch as Spacewalk 5 is repurposed to disconnect the locking struts, and preparing for the release of a non-functional KH-9.

3 hours later, the KH-9 is released from the Shuttle, completely inoperable.

screenshot5139.png

Columbia then de-orbits on Flight Day 8.

screenshot5140.png

screenshot5144.png

screenshot5146.png

screenshot5149.png

The DoD is not happy about how the mission ended, but nevertheless 61C has paved the way for future on orbit servicing missions. They'll take whatever positives they can get from the mission, despite the early conclusion.

To end February, a test is conducted of the modified Lunar Module Descent Engine to be used on the ACOV service module. It will undergo a rigorous testing campaign through ground and vacuum chamber firings throughout the year.

screenshot5161.png

     To kick off March, NASA representatives meet with executives from Japan's NASDA space agency in Tokyo. They are hoping to discuss options for joint Shuttle and Skylab missions. Japan has already licensed Delta rockets and currently utilize a version they have dubbed the "N-II" succeeding their previous "N-I" rocket, not to be confused with the Soviet N-1. NASDA is a hopeful agency with ambitious goals, so working with NASA and ESA could provide them with better opportunities in the future.

     The meetings are a massive success, and lay the foundation of positive relations in the future. NASDA is hopeful to get a Japanese astronaut on a 1985 Shuttle flight, which NASA is open to.

     But as new partnerships are formed, and old rocket is poised for its final flight. Grumman's Valkyrie rocket stands at LC-20 for it's final launch. The venerable light-lifter has been a workhorse for small DoD and NASA payloads since the mid-70s, with 36 previous flights, to be capped off by this final 37th. Things are changing, the Air Force would rather use its surplus of Titan missiles than continue this rocket, and Grumman doesn't want to step on it's own toes by entering Valkyrie into the commercial market, directly competing with SSV. Thus today is the final flight, carrying a Retriever-Swarm of small reconnaissance satellites for the Air Force.

screenshot5226.png

The launch is successful, sending out the GAC Valkyrie on a great flight. The payloads were part of a ramping up of classified missions that has been occurring lately. But why?

Well, back on March 23rd, President Reagan made a speech from the Oval Office to the nation.

"I call upon the scientific community in our country, those who gave us nuclear weapons, to turn their great talents now to the cause of mankind and world peace, to give us the means of rendering these nuclear weapons impotent and obsolete."

ronaldreagansdi.jpg

     President Reagan announces the Strategic Defense Initiative, or SDI. This new program is intended to develop advanced defense systems to counter ballistic missiles and other threats by building space-based defense weaponry. The defensive part is crucial, as any "offensive weapons" in space are banned by the Outer Space Treaty, of which the US is a signatory alongside most of the world.

     Defensive weapons are a loophole, however, and the President hopes this will dissolve the concept of Mutually Assured Destruction, which he describes as a "suicide pact" by its idea of both parties of an all-out nuclear war being destroyed. This idea has hung over the heads of the nuclear superpowers since the Soviets first attained nuclear weaponry, but Reagan seeks to abolish it.

     Many are hopeful SDI will unintentionally lead to further budget increases of NASA, and the DoD has its eyes on the Space Shuttle and the upcoming SDLS rockets for usage with SDI payloads. Whatever the case, SDI has created a tense atmosphere on the world stage, and has most certainly scared the Soviets.

     With that out of the way, Discovery's wiring has finally be fixed, so the second youngest Shuttle launches on April 18th for mission 61D, carrying a new crew of Skylab and a whole load of cargo.

shuttlecoverageogl.png

Discovery successfully rotates the Skylab crew, and delivers cargo. Landing occurs at Edwards Air Force Base on April 28th, 1983.

With the spring Skylab rotation complete, NASA now moves towards a very important mission...

The first flight of Shuttle-Centaur.

STS-61E, flown by Challenger, will use Centaur G to deploy the Lunar Cartographer spacecraft. This is the second mission from the Earth-Moon System Project program, and will provide the highest resolution radar maps of the lunar surface ever.

This mission is crucial to ACOV, and future deep space payloads.

MISSION OVERVIEW: STS-61E |

Commander | Karol Bobko

Pilot | Guy Gardner

Mission Specialist 1| David Hilmers

Mission Specialist 2 | Robert Springer

Payload Specialist 1 | Byron Lichtenberg

OV-099 "Challenger"

Objectives: Deploy Lunar Cartographer with Centaur G stage.

This is the first Shuttle mission with a payload specialist, a new role where people not specifically astronauts will be trained to fly on Shuttle missions.

A new era of Shuttle missions begins as Challenger lifts off into the morning skies on May 10th, 1983.

"AND LIFTOFF OF THE SPACE SHUTTLE CHALLENGER THE FIRST FLIGHT OF SHUTTLE-CENTAUR TAKES TO THE SKIES!"

screenshot5255.png

screenshot5262.png

screenshot5266.png

Now in orbit, the Shuttle crew can breathe a sigh of relied. Shuttle-Centaur missions, while providing great capabilities, are the most dangerous the Shuttle can do. RTLS aborts (already near impossible) would require venting of Centaur's fuel in order to properly land, and the mass of the stage and payload pushes the Shuttle to its performance limit. This has earned these missions the nickname "Death Star" missions.

Nevertheless, Centaur is deployed as soon as possible, and about 2 hours later performs TLI to boost Lunar Cartographer to the Moon.

screenshot5354.png

TLI is successful, and Lunar Cartographer is separated from Centaur G, deploying its radar dish and solar arrays. Centaur G will be flung into a heliocentric orbit, while Lunar Cartographer will insert into an elliptical polar mapping orbit in a week to begin its mission.

screenshot5355.png

With the shiny explosive out of the payload bay, the next few days are spent on experiments and Earth photography, Challenger de-orbits on Flight Day 4 for a landing at Edwards.

screenshot5394.png

screenshot5398.png

screenshot5400.png

     A massive step towards future missions has been made with the completion of 61E. President Reagan is at Edwards with First Lady Nancy Reagan, and they speak with the crew of the Shuttle following the landing, and the President makes a speech in front of the landed Shuttle Challenger. In this speech, he announces his government's plans to cooperate further with NASA, and mentions their upcoming suite of robotic missions to Mars. The Shuttle has become an American icon, now a focus of the Reagan administration for PR purposes. Whether being simply a PR tool for the President is ideal, it's certainly getting the budget raised every year, so NASA has no complaints on that front.

     Doubling up on Centaur missions, Atlantis is launched on STS-61F to wrap up the first half of the year for the Shuttle. This is a classified mission, so coverage is limited, but Centaur being on the mission can't be hidden due to the RBUS being obviously extended and connected. Nevertheless the mission is successful, and Shuttle-Centaur has been successfully demonstrated. 

screenshot5417.png

screenshot5439.png

screenshot5442.png

     With 2 successful Centaur missions demonstrated, the path is clear for ACOV demonstration flights next year. The Shuttle has gone through most of its flight schedule in the first half of the year, with another flight in July and another in the autumn. This has been an unusual schedule, but 5 flights in 6 months is a positive trend in the Shuttle's flight cadence. The Shuttle's turnaround time is the main thing keeping it from flying even more consistently, which has been a point of focus from several Rockwell and NASA studies about future upgrades. Including one presented this month in the Space Shuttle Technical Report from Dryden and Ames. These reports have for a long time been advocating for Shuttle upgrades, and they're starting to gain traction.

     Meanwhile across the pond, the UKSA has been gaining political relevance, as their Comet B rocket will be providing many new jobs across the UK. NASA has also gotten interested in the project, and has begun discussing possible joint projects with the UKSA.

     For the Soviets, they are still grinding away at Energia development, with test articles and engine development coming along as of the summer. VKK is also beginning construction for its first flights in a few years.

     But as late June rolls around, there's one thing on the minds of everybody in the world of spaceflight.

Iapyx is about to enter orbit of Saturn.

I'd like to thank everyone who has helped this page reach 8,000 views! Thank you for all the continued support and viewership, it means a lot to me as I continue writing!

Link to comment
Share on other sites

Saturn and A Series of Spacecraft

June 26th, 1983

"We're uh, patiently awaiting the completion of orbital insertion, here at JPL Mission Control."

"Just about 1 minute left in orbital insertion."

"Data is looking good."

"20 seconds."

"Confirmation of main engine shutdown!"

"Now awaiting the data return."

"..."

"And we have a NOMINAL CONFIRMATION OF SATURN ORBIT, THE IAPYX SPACECRAFT HAS BECOME THE FIRST TO ORBIT SATURN."

"We're getting the instrument data back now... oh my it's beautiful."

screenshot5788.png

     3 years since its departure from Earth, Iapyx has officially become the first spacecraft to orbit Saturn. After many years of hard work from countless men and women, this bold little robotic spacecraft has done what so many have dreamed and hope for since the 1960s. JPL is ecstatic, as the pictures return, and Iapyx swings back out away from Saturn, revealing stunning views. The mission has been not only a physical success, but a massive one in the realm of public relations. Iapyx represents a revival of robotic missions that is soon to come, and the ability of NASA to continue to pioneer in all fields of space exploration. President Reagan receives a debriefing with photos and data from the spacecraft 2 days later, on June 28th. He then makes a speech to the nation, congratulation JPL and NASA on their achievements, and asking the country to follow the discoveries of the mission as it begins an incredible new phase of exploration.

     Iapyx will sit in Saturn orbit until October, when it will then attempt it's first flyby of Saturn's largest Moon, and the mission's highest priority target (other than Saturn itself), Titan. The moon will give Iapyx a boost towards the next flyby of the outermost major moon of Saturn, Iapetus. The flyby of Iapetus will be retrograde, pulling the spacecraft back down towards Saturn for a tour of the inner moons. This flyby process preserves fuel and maximizes mission lifespan. 

     The pictures being returned are already mesmerizing the world, revealing new detail in the rings, and providing fascinating insights into the cloud structure of Saturn. With its massive suite of instruments, Iapyx is revealing new things about the Saturnian system with every return of data. There are so many wonders left to be discovered, and NASA is enthusiastic about this mission.

     A billion miles away, back on Earth. Things are shaking up to be uhh... rather anticlimactic for the second half of the year. 2 more Shuttle missions in the span of 5 months. But there are lots of interesting developments going on regardless of the Shuttle's absence in the second half of the year. ESA and the UKSA are planning to begin test flights of the MPCS on Ariane 1 at the end of the year, followed by the first uncrewed Coelus mission at the start of next year. They are very enthusiastic, and have been garnering world interest over the past few months.

     Meanwhile, for the Soviets, it is time for their inconsistently often "Let's try out TKS" mission, this time on Sokol. TKS has been in limbo ever since it first flew, as an attempt to replace Soyuz that has never gotten fully off the ground. With the upcoming development of VKK it is uncertain whether TKS will survive, although its project managers remain hopeful for more funding.

screenshot5446.png

     Sokol appears to be an ideal launch platform for TKS, although the boosters are likely unnecessary. Recently there has been quite a bit of interest in TKS from the Soviet government, and it may have a future as a Soyuz replacement to operate alongside VKK. However, with recent... words by Ronald Reagan and the announcement of SDI, the Soviet military has been further entrenched as the dominant budget. All the space program can do is hope for funding to either stay consistent or increase. It appears, however, that the Soviet government sees the space program, finally, as a valuable propaganda tool. They have warmed to the idea of propping it up again as they did in the late 50s and early 60s. This is the Soviet space program's hope for the future, similar to NASA's.

    As July begins, America's beloved Space Shuttle Enterprise rolls out for launch. The oldest Shuttle has been entrusted with an important mission for the future of the program. This mission, STS-61G, was originally a Shuttle rideshare mission, but payload delays have lead NASA to bump those commercial payloads to the next rideshare mission, and designate 61G a mission for some little NASA payloads, and a very important test. You see, the Space Shuttle's mission duration is limited by its fuel cells, which are the primary source of power. On top of this,  the Shuttle can only carry so much hydrogen and oxygen for them to use to generate power. However they can be slowed down to consume less hydrogen and oxygen, increasing the time until they run out. But this would result in the Shuttle having less power and therefore might not function well. To supplement the loss of power, engineers at Ames designed what they call the Orbital Mission Length ExTension (OMLET). OMLET, with its incredible backronym, is a power bus that can be placed in the payload bay of the Shuttle, with a large, state-of-the-art solar array to generate extra power for the Shuttle. Combining the fuel cell overhead and the extra solar power, this could allow for Shuttle missions up to 20 days in duration. However that is likely only possible with Challenger, which has extra hydrogen and oxygen storage for the fuel cells. The other Shuttles are likely capable of 18 days. This mission will not draw power from OMLET, but it will measure how much power is generated over several days, thus providing invaluable data for operational usage.

     Enterprise begins an essential voyage on July 4th, 1983.

"2..., 1... ZERO, BOOSTER IGNITION AND LIFTOFF OF ENTERPRISE! Delivering spacecraft to orbit and preparing for extended duration Shuttle missions!"

screenshot5860.png

screenshot5864.png

screenshot5875.png

The other 2 payloads on the mission are being stored in sunshades. These are NASA's Deep Space Relay Experiment (DeSpRE) which is intended to test better methods of orbital deep space communication, and 4 COmpact RAdar Satellites (CORSAs) which are operated in collaboration with USC. So technically 5 other payloads. There is also a panoramic camera at the front of the payload bay for capturing images of payload deployment.

DeSpRE and CORSA will be deployed first, before OMLET is utilized towards the end of the mission.

Finally, on Flight Day 7, OMLET's solar array is extended.

screenshot5887.png

screenshot5891.png

The kilowatt output from the solar array is promising, and data is collected over three days.

screenshot5893.png

On Flight Day 10, Enterprise returns for a landing at the Cape, where the landing restriction has been lifted, as this is the first flight with the improved nose wheel steering system.

screenshot5894.png

screenshot5898.png

screenshot5900.png

     A successful mission concluded. For Enterprise, she will be sent to Palmdale now for some... modifications. This is because Enterprise will be serving out of Vandenberg for the forseeable future, and must therefore represent her service to the Department of Defense with some upgrades and livery changes. NASA feels rather clever about giving the DoD the oldest Shuttle to fly, but the DoD couldn't care less, they just want dedicated Shuttle missions, and they are finally getting them.

     It's July and there's only one more Shuttle mission to go, yet it has flown 6 times already. A few mission cancellations have cut the manifest short for the year, but it has regardless been an impressive year for the Space Shuttle, and 1984 is planned to have a 9 flight manifest, assuming more missions don't get cancelled. NASA is also working on new "work overflow hangars" behind the Orbiter Processing Facility which will allow for Shuttles that need a bit less work to be handled, decreasing the strain on processing and hopefully increasing maximum flight capabilities.

     The rest of July is quiet, but on August 3rd... NASA has a special delivery.

screenshot5903.png

     Fresh from Michoud, the first SDLS core stage has arrived at the Kennedy Space Center. This is a momentous occasion. With the stage now delivered, NASA expects the first launch of SDLS to be in the first 2 quarters of 1984. The SRB segments have already arrived, and the upper stage is due to be delivered at the start of 1984. The pieces are now falling into place for the debut of SDLS. 

     On August 26th, Iapyx performs its first flyby of Titan. Hundreds of people gather at JPL to see the first images, only to get nothing... Concerning for the team, and disappointing for the public. However it appears to have been just a minor issue, the camera has a "sleep" mode and when a flyby begins it is told to "wake up" from this mode, at least in a normal case. The code to actually wake up the camera appears to not have worked as intended, and the team send commands to forget the sleep mode and make it a simple on/off for the camera. A test verifies this works by sending back a picture of Saturn on August 29th. But on the bright side, all other instruments collected heaps of data, and some of the other imaging instruments provided photos, although not in true color. The flyby shows just how much data Iapyx can return. Iapyx is now intended to simply sit in Saturn orbit for a study phase until the time is right for the Iapetus flyby in late 1984.

screenshot5911.png

To cap off the year for NASA, Atlantis launches on STS-61I to deliver a new crew to Skylab and bring supplies. The mission is successful, and lands back at the Cape on November 16th, 1983 after a 10 day mission.

screenshot6482.png

To conclude the year, ESA and the UK Space Agency will have their moment in the spotlight. On December 16th, Ariane 1 launches with an uncrewed MPCS to verify the launch vehicle for crewed MPCS missions to the Coelus Lab, and perform tests of some upgraded MPCS systems.

screenshot5917.png

screenshot5923.png

After a day in orbit, MPCS uses its new solid motors (intended for whatever kind of aborts that might be needed) to de-orbit. However, the trajectory is off and the descent is too steep, coming into the lower atmosphere much hotter than planned. But flying pizza roll does what it can to slow down, and the paraglider deploys. However, rough seas cause the MPCS to tip over after splashdown.

screenshot5925.png

Despite this landing tomfoolery, Ariane 1 was certified to carry crew with this mission, and necessary adjustments to MPCS will be made. Overall, Coelus remains on schedule.

     However, on December 24th...

     Rockwell sends NASA an early Christmas present.

screenshot6483.png

ACOV has arrived.

 

Комитет представит общую серию исследований космических аппаратов в феврале 1984 года.

-.. .-. -.-- -.. . -. / .- -. -.. / .- -- . ... / .-- .. .-.. .-.. / --- ..- - .-.. .. -. . / .- / .-. --- .- -.. -- .- .--. / --- ..-. / ... .... ..- - - .-.. . / ..- .--. --. .-. .- -.. . ... / .. -. / ... ... - .--. / .--- .- -. ..- .- .-. -.-- / .---- ----. ---.. ....- .-.-.-

 

1 Year

     I want to take this moment here at the end of the post to recognize that it's now been 1 year since I started this page on the forum! It's been an awesome experience and the kindness of everyone here on the KSP forums has encouraged me to keep writing and develop this story further. :)

Link to comment
Share on other sites

  • 2 weeks later...

Orwellian Year

     In his 1949 novel, author George Orwell depicted a dystopian reality set in the year 1984. As we enter this famed year, we are thankfully not in Orwell's dystopian reality. But in one filled with optimism for space exploration and scientific achievement. But over this excitement sets unease. The Cold War has gotten noticeably colder in the past few years, as President Reagan has taken a harsh stance towards the Soviet Union. The Strategic Defense Initiative has appeared to frighten the Soviets even more, and they appear to be ramping up production of nuclear weapons and ballistic missiles. On top of massively increasing the Soviet military budget. The US has responded in kind, as the threat posed by the Soviets has further solidified SDI as a necessary program in the eyes of many, including Congress.

     Impending doom aside, NASA has massive plans for this year. 2 missions to Mars will be launched, ACOV will fly for the first time, SDLS will too, and the budget continues to steadily rise. The FY 1984 budget is placed at 10 billion dollars (about 29 billion today) which is a major leap up. With this funding, NASA feels ready to make a major announcement

     At the Kennedy Space Center, the Stacking & Assembly Building (SAB) has finally been completed! This building can hold Shuttle launch stacks (ET and SRBs) as well as core stages for SDLS and boosters. This will take a lot of the load off of the VAB and reduce strain on the processing flow. With this major addition complete, NASA can see the launch cadence of the Shuttle increasing over the next few years. 

     To kick off the year, Challenger launches STS-71A on January 9th. This mission has 2 objectives. The first being to repair the Solar Maximum Mission, which was launched in February 1980. However, in November of that year, it suffered an attitude control failure. The Shuttle is now set to repair the spacecraft and return it to operational status. The other objective is to retrieve the LDEF, which Challenger deployed in 1980 on that memorably hectic launch.

screenshot5928.png

screenshot5934.png

On Flight Day 3, Solar Maximum is in position for capture.

screenshot5937.png

The Shuttle captures the spacecraft, and work begins a few hours later.

screenshot5939.png

The crew perform 3 spacewalks to repair SolarMax. These consist of replacing the entire attitude control system module, and the electronics module for the coronagraph/polarimeter instrument. A gas cover is also installed for the over the X-ray polychromator. 

screenshot5942.png

After these successful repairs, SolarMax is released and sent on its merry way.

screenshot5944.png

After this, Challenger performs a maneuver to rendezvous with the LDEF for its retrieval, reaching everyone's favorite 12 sided space cylinder on Flight Day 5.

screenshot5945.png

Challenger's flight that launched LDEF caused quite the stir due to what happened on ascent with one of the main engines. However this is a far less chaotic event, assuming the Canadarm cooperates. The Shuttle slowly moves in, readying the Canadarm for capture.

screenshot5947.png

After about 45 minutes of shenanigans, Canadarm has captured the LDEF.

screenshot5948.png

It takes another 90 minutes, but the LDEF is finally secured in the payload bay, and Challenger prepares to return home.

screenshot5949.png

Challenger is diverted to a landing at Wallops Flight Facility, a new alternative landing site with a runway completed last spring. This is due to poor weather at the Cape, the original landing site.

screenshot5950.png

     Despite the unexpected landing location, the mission is a complete success, and a good start to the Shuttle's busy year.

     After a year in planning, NASA is finally ready to make its big announcement on January 21st. President Reagan visits the National Air & Space Museum, and makes a speech on the steps of the building to the nation, and the world.

     "My fellow Americans, I speak to you today from the steps of the National Air & Space Museum. It is truly a remarkable place, dedicated to preserving this nation's aerospace history. But we are still writing that very history, pushing the boundaries of what is considered possible for mankind to accomplish. Our nation's incredible space agency, NASA, with its fleet of Shuttles, new spacecraft, and many scientific missions, has for the past 25 years amazed us all with their feats of engineering and science. From a child sitting in the family living room as Neil Armstrong took his first steps onto the lunar surface, or as tens of thousands of people watched the Space Shuttle lift off into the skies for the first time. We are still pushing the boundaries of what is possible, and that is why I am here today."

     "For centuries, mankind has looked up to a red dot in the sky. The Romans named it in honor of their god of war, Mars. Since then, we've learned a lot about this dusty red ball, and we've been amazed by it every step of the way. Human exploration of Mars is one of the most ambitious steps we will take as a species in the next several hundred years, and that is what we are beginning the process today. Ladies and Gentleman, our nation is beginning an exploration program to achieve a human landing on Mars by the turn of the century. In honor of one of the world's greatest and most legendary explorers, it will be named the Magellan program."

     "This is one of our nation's greatest endeavors, and it will fulfill the dreams and imaginations of countless who have come before us, and those to come after us.  A golden age of exploration is just beginning, and the United States intends to lead it. Thank you, and God Bless America."

magellanflag.png

        World news is electric following the announcement. Americans feel like they're getting a bit of deja vu, as Carter's attempt with the Aris program fell back into a development program that will actually now help Magellan. But this is different, setting the goal to before 2000 makes this very realistically achievable. The Reagan admin is willing to pony up the funding to make it happen as well, so there is a different feeling with the announcement this time around. NASA feels actually prepared to take on this challenge, and they've set out a reasonable timeframe to do it. The following is NASA's initial schedule for Magellan.

  • 1984: Finalized concept studies
  • 1985: Development of concepts
  • 1986: Contracts go out for essential hardware
  • 1987: Contracts for minor hardware
  • 1988: Construction on essential hardware begins
  • 1989: Construction on minor hardware begins
  • 1990: Construction complete, first flight

     While the first flight date might be a bit optimistic, the development pace is achievable, and work to expand Michoud for dedicated transfer vehicle assembly is already in the final phase of planning before construction begins.

     As the news begins to cool down after the announcement, ESA and the UKSA make their next big step towards crewed Coelus missions. The first Coelus Lab is launched aboard the first Ariane 3 on February 10th, 1984.

screenshot6045.png

screenshot6048.png

screenshot6049.png

     The Coelus Lab is at the very edge of Ariane 3's capabilities, and in fact it had to be re-designed because it was too heavy for it. But those issues aside, it is finally in orbit. This Lab will service both the MPCS test flight and the first crewed flight, which is currently slated for April. The uncrewed MPCS is set to arrive in 3 weeks.

     Indeed it does arrive in 3 weeks. On March 5th, Ariane 1 lifts the uncrewed pizza roll into the skies for this crucial test mission. This flight is also important because it is the first time MPCS is using its new Coelus Module, which is a new aft "service module" of sorts that holds 2 large solar arrays and the docking port, as well as eventually an airlock for crews. The mission is completely successful, and MPCS returns to Earth 3 days after launch.

screenshot6484.png

     The path is now clear for the first crewed launch of MPCS, now scheduled for May after some unexpected delays to the delivery of the spacecraft. This is tolerable however as Coelus Lab's orbit is calculated to not decay until 1985. But with some time until that mission, the Shuttle is scheduled to make its debut at a new launch site. The DoD's patience has finally paid off, as Space Shuttle Enterprise is stacked at Launch Complex 6 at Vandenberg Air Force Base, for the first West Coast Shuttle launch.

     This is a monumental moment for both the DoD and NASA. Although she is now clad with an Air Force insignia on her side and "USA" in the Amarillo Air Force font on the tail, she remains a NASA Space Shuttle, with the iconic red worm above the name on the right wing. Although the primary use for now is national security missions, NASA sees potential in civilian flights from Vandenberg.

     On April 10th, a crew of highly trained Air Force astronauts board Shuttle Enterprise, and prepare for a great first in the Shuttle Program.

screenshot6501.png

"Main engine start... 2... 1..."

"Solid Motor Ignition and Liftoff."

"Copy Liftoff."

"Roll Program."

"Roger."

screenshot6508.png

screenshot6509.png

screenshot6513.png

     Despite noticeable wear across the vehicles tiles and thermal blankets beginning to develop, Enterprise remains as steady and as capable as ever, now with a slight livery update to represent her national security service. Enterprise has, though, taken a backseat in NASA's eyes to the newer and more capable shuttles, which made it the perfect Orbiter to let the Air Force do their missions with. This mission played host to many firsts, including the first flight with the new striking black Filament Wound Casing SRBs, which are planned to eventually be used at Cape Canaveral, pending modifications to launch infrastructure.

     The Air Force crew regardless have nothing but compliments for the Space Shuttle, as they prepare to begin their mission in orbit. Which... wait what is their mission? Well, as you may remember, early last year Columbia "serviced" a KH-9 spy satellite, to less than optimal effect, however that was a testbed satellite to prove that it could be done. Now Enterprise is going to perform this for the first time operationally. The DoD has been preparing for this for quite some time, as all KH-9s launched since 1974 have a "film retrieval system" which allows astronauts to retrieve film from the satellite on a spacewalk, giving the satellite life beyond the use of its film buckets.

     On Flight Day 2, Enterprise has caught up to this monolithic spy satellite.

screenshot6514.png

     Shenanigans ensue, as capturing the KH-9 remains a difficult task. The DoD has kept this in mind for its new generation of spysats, which no longer utilize film, and will simply be upgraded, boosted, and repaired by the Shuttle. They will be equipped with fixtures for the Canadarm, and proper capture ports. The DoD is also experimenting with these features on the final 3 KH-9 satellites to be launched, one of which is already in orbit. Nevertheless this doesn't help the crew of STS-72A, as they are having to maneuver in with a literal claw to grab onto "pressure points" on the KH-9 service module. These pressure points are in a very awkward position, as the solars and orbital engine block a capture from the bottom. Oddball could simply be taken apart to get a clean capture, but the DoD would rather avoid that with this functional unit.

     Eventually, with some world-class space maneuvering, Enterprise has hold of the mighty spysat, and work can begin.

screenshot6517.png

     Relatively speaking, the workload on this satellite is light, it is a newer unit launched in 1979, and is still functioning well. The DoD just wants the film retrieved, and some experimental upgrades, as well as some maintenance, completed. A new override control module is installed, as well as a new electronics control module, and the satellite is refueled from a fuel canister on the front of the capture platform. With this, and the film retrieval, this satellite will likely receive one more visit before being left to retirement and eventual deorbit.

screenshot6521.png

     To the DoD's delight, the Shuttle's IMUs behave themselves, and the servicing of the satellite is fully completed by Flight Day 6, with a gentle release, putting it back into operational service. 

screenshot6523.png

     On Flight Day 8, Enterprise de-orbits for a landing back at Vandenberg Air Force Base.

screenshot6524.png

"300 feet."

"200."

"100."

"50."

"20."

"10."

"5."

"Main Gear Touchdown."

"Nose Gear Touchdown."

"Wheel Stop."

"Copy, Wheel Stop."

screenshot6528.png

     Under California clouds, the first West Coast Shuttle mission has been completed. The DoD is thrilled to finally have their own Space Shuttle operations, and will have Enterprise at Vandenberg until 1987, when there will be a swap to another Shuttle, most likely Discovery.

     Regardless, Enterprise will be taken to Palmdale for some work, and fly another classified mission soon. While ESA now prepares for a monumental step, their first independent manned mission. Taking to the skies on May 16th, with a 5-man crew composed of 2 Frenchman, 2 Germans, and 1 Englishman.

 

 

screenshot6486.png

Once in orbit, the solar arrays are deployed, and MPCS sets up for a rendezvous with the Coelus Lab the next day. Orienting towards the sun because the solars are not capable of tracking it.

screenshot6488.png

26 hours later, MPCS arrives at the Lab for docking.screenshot6490.png

"30."

"20."

"15."

"10."

"5."

"2."

"1."

"Contact!"

"Amarrage dur confirmé !"

screenshot6493.png

     A monumental achievement for ESA and the UKSA. The stay will be brief, only 4 days, so there are many tests performed to ensure Coelus Lab is indeed comfortable for crews. When all is said and done, MPCS departs the station, and returns for quite possibly its last splashdown in the Atlantic Ocean. All future flights are going to land on... well land. The landing skid pads were actually installed on MPCS, although they are non-functional. MPCS also continues to use its "expendable" forward RCS thrusters on the front, this is going to be changed for operational crewed flights scheduled to start at the end of the year.

screenshot6494.png

screenshot6497.png

screenshot6498.png

screenshot6499.png

     With that, ESA has become the third space agency to fly humans into space. World news covers the mission each day, and it has rallied Western Europe behind ESA, as a source of pride for their nations. Both NASA and the Soviets congratulate ESA, although the Soviets seem less enthusiastic about the achievement than NASA. Japan has struck a deal to fly an astronaut next year on MPCS, on top of their agreements to fly on a Shuttle mission. As NASA gains more and more partners, the Soviets continue to be isolated, and will be forced to make big leaps over the coming years to keep pace.

     Back at the Cape, however, NASA is preparing for its own monumental mission to round out the second half of the year. This mission has been highly anticipated for a few years now, and it sets into motion the next phase of lunar exploration.

     The first flight of ACOV.

     Under the massive lights of LC-39A, as the summer sun is a few hours out from rising on June 10th, 1984, Space Shuttle Atlantis is set to take flight on STS-71E, the first of 2 planned test flights for ACOV, with this one being intended to demonstrate life support systems, propulsion, power, and other key functions with crew aboard. The Shuttle is carrying 5 crew, 3 of which will board ACOV, attached to an enlarged Centaur G' known as "Super Centaur" which will boost them out into an elliptical High Earth Orbit. They will orbit a few times, while doing a second orbit boost using ACOV's own main engine, before de-orbiting and landing north of Hawaii in the Pacific Ocean.

"Solid Rocket Motor Ignition and LIFTOFF! LIFTOFF of Atlantis and the first ACOV spacecraft!"

screenshot6534.png

screenshot6536.png

screenshot6538.png

     Once in orbit, the crew must still quickly get Centaur and ACOV out of the payload bay, as standard Shuttle-Centaur practice. The 3 crew of ACOV (Richard Covey, Dale Gardner, and Franklin Chiang-Diaz) board the spacecraft through a retractable crew tunnel that connects to the APAS-75 port's docking latches, it is a rather compact system, but it works with the minimal space available. After all 3 crew have their pressure suits on, and are firmly seated, the tunnel is depressurized and retracting, clearing the way for the CISS (Centaur Integrated Support System) to begin rotating the stack out of the payload bay of Atlantis. The first step is to a 23 degree rotation, called the "checkout position" where final systems checks are made.     

screenshot6539.png

    Following this, the CISS rotates up to 45 degrees for release.

screenshot6541.png

     "Alright, copy Houston. This is ACOV and everything is GO on our end."

    "Roger that, ACOV. Atlantis, Houston, you have the GO for release."

     "Houston, Atlantis, we copy and we are GO for release."

     "10 seconds to release."

     "5."

     "3."

     "2."

     "1."

     "RELEASE LIGHT."

     "Confirmed release."

screenshot6547.png

     With the boost maneuver for ACOV near orbital sunset, they make as much separation from the Shuttle as they can, and not too long after, the 2 RL10 engines light up to boost ACOV into an elliptical orbit.

screenshot6548.png

screenshot6549.png

     Orbiting around the Earth, the crew capture fantastic photos, before coming back down for a test of ACOV's main engine to further boost the orbit.

screenshot6551.png

screenshot6552.png

     A little while later, ACOV de-orbits for a landing north of Hawaii in the Pacific Ocean.

screenshot6553.png

screenshot6555.png

screenshot6556.png

screenshot6560.png

screenshot6562.png

     Despite the rather rough splashdown, ACOV's first test flight has been a great success, and fully certified the vehicle. Atlantis lands at Edwards on June 16th, concluding STS-71E.

screenshot6565.png

screenshot6567.png

     The second and last test flight is scheduled to take place at the start of next year, and will be a full circumlunar flight, although it will not enter orbit as ACOV requires refueling to return to Earth from lunar orbit.

     Speaking of that, as the first half of the year comes to a close. NASA shows the public the first photos of the in construction Propulsion and Control Module (PCM) for the Tranquility station. On top of this, the depot modules, and the first Autonomous Lunar Refueling Vehicle, are now under construction. The ALRV's development has been rather quiet, but it is essentially a tanker based off of the Apollo Block III service module for refueling the depot modules of Tranquility.

     With all of these busy developments, and Magellan announced, NASA finally gives the Apollo Follow-On Program its own name. Fittingly, the program has been named after a child of Apollo.

Orpheus

     Now with a fancy name, the Orpheus program remains on track for 1985. But as the first half of the year comes to a close, there are busy developments in the VAB...

SDLS is stacked and ready for its inaugural launch.

Первый полет БТС-02 запланирован на 3 июля, мы приглашаем всех получателей этого письма присоединиться к нам на авиабазе Жуковский, чтобы стать свидетелями этого монументального шага.

Edited by track
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...