Jump to content

No Shortage of Dreams | A KSP Skylab Alternative History


Recommended Posts




No Shortage of Dreams


ad_scientiam.png



Intro: 
For around 3 months I have spent a lot of time researching the Skylab program and procrastinating about what an alternative history of Skylab would've looked like if it went right. This will be my own take based on what I love and dozens of studies, PDFs, concepts, etc from the various space agencies/companies pitched for Skylab, mainly the Reuse Study by McDonnel Douglas and the Power Tower studies by Lockheed. It will focus mainly on Skylab being a S&D station and extended by the Space Shuttle. The thread will contain 1 mission per post containing KSP Screenshots and diagrams.




Thanks:
@Talverd
 For their help with certain ideas, pure support, and the main inspiration for all of this, and please check out their fantastic "Chasing Dreams" alternative history.
@Kuiper_Belt With their Incredible Shuttle Adventures 




The Beginning.

220200_20220514023347_1.png
Skylab 1 and Skylab 2 (SLM-1) wait on their respected pads. May 14th 1973.


Mission List

Skylab 1 - Finished
Skylab 2 / SLM-1 Finished
Skylab 3 / SLM-2 - Finished
Skylab 4 / SLM-3Finished

Skylab 5 / SLM-4 / TRS-1 - Finished
Skylab 6 / SLM-5 / STS-2 - Finished 
Skylab 7 / SLM-6 / STS-5 - Finished
Skylab 8 / SLM-7 / STS-6 - Finished 
Skylab 9 / SLM-8 / STS-7 - Finished
Skylab 10 / SLM-9 / STS-12 - Finished
Skylab 11 / SLM-10 / STS-14Finished
Skylab 12 / SLM-11 / STS-16 - Finished

Skylab 13 / SLM-12 / STS-18Finished

Skylab 14 / SLM-13 / STS-21 - Finished

Skylab 15 / SLM-14 / STS-22 - Finished

Skylab 16 / SLM-15 STS-24 - Finished

Edited by TruthfulGnome
Link to comment
Share on other sites

Skylab 1 - May 14 1973
Part 1

unknown.png


After hard work since 1968 Skylab which was originally named Orbital Workshop (OWS) is finally ready to soar the skies, it is a historical day for NASA and the United States as it marks the last launch of the Saturn V, the first launch of an American space station, and the largest spacecraft ever built. Mans dreams long stays in space are about to become true.

220200_20220514022136_1.png


220200_20220514022649_1.png
Skylab 1 waits on LC-39A with Skylab 2 on LC-39B

220200_20220514032853_1.png
Skylab 1 prepares for launch.



220200_20220514033138_1.png
Swing Arm 3 retract.

220200_20220514033901_1.png
Mark! T-1 Minute and continuing to count.

220200_20220514033948_1.png
T-24 Seconds, Swing Arm 1 retract!

 220200_20220514034021_1.png
T-16 Swing Arm 2 retract!

220200_20220514034111_1.png
12.. 11.. 10.. 9.. 8.. We have ignition sequence.. 6.. 5.. 4.. 3.. 2.. 1..

220200_20220514034226_2.png
We have a liftoff! The Skylab lifting off the pad now!

220200_20220514034330_1.png
Skylab has cleared the tower!

220200_20220514034402_1.png
Mark T+18 seconds, pitch and roll program started, Saturn V currently now on flight path 

220200_20220514034446_1.png
T+ Minute, Display data shows stable thrust on all five engines

220200_20220514035410_1.png
Roll program complete. Anomaly

220200_20220514035511_1.png


220200_20220514035715_1.png
S-II performing on the spot

220200_20220514035747_1.png
Skylab Sep. Anomaly

Part 2 Coming soon!
 

Edited by TruthfulGnome
Link to comment
Share on other sites

Skylab 1 - Part 2
"Crippled Station"


220200_20220514035851_1.png
Skylab flips to 90° for direct alignment with the Sun.

220200_20220514035949_1.png
ATM deployment

220200_20220514040012_1.png


220200_20220514040023_1.png
ATM deploys her wings

220200_20220514040102_1.png

220200_20220521233134_1.png

220200_20220521233436_1.png
Skylab flips to a 45° angle instead of 90° for better thermal controls.

220200_20220521233442_1.png

220200_20220522002527_1.png
Goodnight Skylab.

After multiple anomalies and issues with the launch of Skylab NASA has delayed Skylab 2 until a solution for saving the crippled station with its solar panel deployment and thermal issues can be resolved, until then Skylab will remain in orbit with a 45° angle for better thermals instead of the originally desired 90° angle for solar generation.

Sorry folks for taking so long, it has been a super busy week I will try to get Skylab 2 done for next week

Link to comment
Share on other sites

Skylab 2 / SLM-1 - May 25 1973.
Part 1

Skylab2-min.png



We Fix Anything.
After the launch of Skylab NASA began noticing a lot of system issues mainly thermal heating that caused toxic materials in the station and solar loss however after days of hard work it was determined that during Max Q air got inside of the micrometeoroid shield completely shredding it while damaging Solar Wing 1 and jamming Solar Wing 2, Solar Wing 1 was torn off after the ullage motors on the S-II fired and Solar Wing 1 was deployed at only 10°. This left many hopeless with the Skylab space station as it was an extremely costly station but in the light of things Jack Kinzler (Named Mr. Fix It by NASA) created the genius Parasol that would be deployed through the Scientific Airlock and would drop Skylab's temperatures to a sustainable amount.

220200_20220524230540_1.png
Skylab 2 awaits for it's historical servicing mission.

220200_20220524230511_1.png


220200_20220524231039_1.png
T-3.1 Seconds engine startup sequence.

220200_20220524231059_1.png
We have launch commit and liftoff!

220200_20220524231142_1.png


220200_20220524231147_1.png
Skylab 2 has cleared the tower! 

220200_20220524231232_1.png
Pete Conrad: Houston - Skylab 2! We fix anything! we got a pitch and roll program. Boy is that a smooth ride!

220200_20220524231250_1.png
Mark 45 seconds cabin pressure adjusting from sea level to space environment.

220200_20220524231259_1.png
CAPCOM: Hello Houston you are feet wet! roger feet wet!

220200_20220525010519_1.png
You are go for staging! Center engine shutdown!

220200_20220524231344_1.png
Staging! We got an S-IVB light!

220200_20220525010530_1.png


220200_20220525010607_1.png
Tower jettison.

220200_20220525010819_1.png


220200_20220525011038_1.png


220200_20220525011126_1.png


220200_20220525012043_1.png
Correction burn.

220200_20220525012358_1.png
We got her in daylight.

220200_20220525012620_1.png


220200_20220525012645_1.jpg


220200_20220525012812_1.png
Okay Houston, the meteoroid shield area is solid gold!.

220200_20220525012840_1.png
Pete Conrad: A brief description is it's suspected Solar Wing- two right? two is gone, completely off the bird. Solar wing one is in fact partially deployed and the reason you've got different readings that symmetric between three solar panels and there's a bulge of meteorite shield underneath it in the middle and it looks to be holding it down.

220200_20220525013036_1.png
Pete Conrad: Now I get that our easiest thing to do is to just go to the end and try to deploy it.

220200_20220525012942_1.png


220200_20220525013541_1.png
Soft docking for small rest and eating.

220200_20220525013759_1.png


220200_20220525014516_1.png
Undock to position the CSM next to the solar wing.

220200_20220525014952_1.png
Weitz performing an EVA to attempt to free the jammed solar wing.

220200_20220525021803_1.png
Skylab 2 docks back to Skylab after an unsuccessful attempt.

220200_20220525021807_1.png


220200_20220525022029_1.png
After multiple failed hard dock attempts they finally succeeded in a hard dock attempt and entered the station

220200_20220525022120_1.png
After entering, the crew deployed the Parasol through the Scientific Airlock 

220200_20220525022157_1.png


220200_20220525022453_1.png


220200_20220525022316_1.png
Skylab with its new shield deployed

That is all for Part 1, I didn't realize how long these missions would be ;) 

Edited by TruthfulGnome
Link to comment
Share on other sites

Skylab 2 / SLM-1 - Part 2
We still got work to do


220200_20220526065731_1.png


220200_20220526065647_1.png
Skylab remains with a crippled solar panel

220200_20220526065835_1.png


220200_20220526070227_1.png


220200_20220526071532_1.png
Conrad and Weitz go EVA to fix the jammed solar wing

220200_20220526071725_1.png
Joseph Kerwin: Houston do you see the gold? 

220200_20220526071957_1.png
Conrad and Weitz argue for 17 minutes causing the media stations to mute the broadcast

220200_20220526073232_1.png


220200_20220526073304_1.png
The Solar Wing is now free

220200_20220526073346_1.png
After being flung back the crew makes their way back into the workshop after fixing her wing

220200_20220526073422_1.png


220200_20220526074905_1.png


220200_20220527214805_1.png


220200_20220527215821_1.png


220200_20220527220023_2.png
The crew opens the ATMs cameras.

220200_20220527221013_1.png
EVA for retrieval of camera film 

220200_20220527220841_1.png


220200_20220527221229_1.png
Departure after a historical servicing nd repair mission.

220200_20220527221400_1.png


220200_20220527221534_1.png
Deorbit burn

220200_20220527221653_1.png
SM sep

220200_20220527221746_2.png


220200_20220527221952_1.png


220200_20220527222043_1.png
Drogue Chutes have been deployed

220200_20220527222055_1.png


220200_20220527222146_1.png


220200_20220527223021_1.png
Splashdown! welcome home Skylab 2!

Edited by TruthfulGnome
Link to comment
Share on other sites

8 hours ago, Rutabaga22 said:

Will the ISS come into play in some way? I know this is meant about skylab, but with it succeeding in this alternate history I'd assume it would have some effect on the development of the ISS.

Yes most likely but that’s far down the road right now, I do have rough ideas on what would change with Freedom/ISS

Link to comment
Share on other sites

  • 3 weeks later...

Skylab 3 / SLM-2 - June 28 - September 25 1973

15197767201_08bea5c8ec_o.png?width=786&height=676


After success with the saving of Skylab on Skylab 2, NASA moves ahead with the Skylab program many are hopeful of this new era in the space industry. The Skylab 3 crew will test the Astronaut Maneuvering Unit inside the workshop and the multiple experiments 

220200_20220531231749_1.png?width=1203&h


220200_20220531232005_1.png?width=1203&h
Skylab 3 Rollout

220200_20220606060023_1.png?width=1203&h
Skylab 3 awaiting on LC-39B

220200_20220606060039_1.png?width=1203&h
Saturn booster marked with 'SA-207'. The first stage engines will be lit up at 3.1 second in the countdown.

220200_20220606121839_1.png?width=1203&h
Liftoff!

220200_20220606121947_1.png?width=1203&h


220200_20220606122127_1.png?width=1203&h
Inboard cutoff

220200_20220606122253_1.png?width=1203&h
Tower Jettison

220200_20220606122418_1.png?width=1203&h


220200_20220606123030_1.png?width=1203&h
Skylab 3 in orbit with Luna in the background

220200_20220606125135_1.png?width=1203&h
We have a view of the workshop

220200_20220606125340_1.png?width=1203&h


220200_20220606125747_1.png?width=1203&h


220200_20220606125918_1.png?width=1203&h


220200_20220606130011_1.png?width=1203&h


220200_20220606164621_1.png?width=1203&h
Docked

220200_20220612175842_1.png?width=1203&h
After only a few days after launch the crew started to get hit with space sickness and became aware of a mysterious leak from one of the quad RCS thrusters on the Service Module. With this severity the rescue crew, Don Lind and Vance Brand started getting prepared for a launch in the Skylab Rescue Vehicle.

220200_20220616192615_1.png?width=1203&h
KSC started to move fast and rolled out the special Skylab Rescue Saturn IB to LC-39B and arranged it for launch in the coming days.

220200_20220617112841_1.png?width=1203&h
Ultimately these problems were fixed and the stack will be used for the upcoming Skylab mission.

220200_20220617115545_1.png?width=1203&h


220200_20220617123004_1.png?width=1203&h
Alan Bean and Owen Garriott embark on an EVA to retrieve and add film

220200_20220617123101_1.png?width=1203&h


220200_20220617123028_1.png?width=1203&h


220200_20220617123605_1.png?width=380&he


220200_20220617124206_1.png?width=1203&h
Undocking

220200_20220617124350_1.png?width=1203&h
View of Skylab from Skylab 3

220200_20220617124442_1.png?width=1203&h
Deorbit

220200_20220617125151_2.png?width=1203&h


220200_20220617125206_1.png?width=1203&h


220200_20220617125414_1.png?width=1203&h


220200_20220617125530_1.png?width=1203&h



220200_20220617125540_1.png?width=1203&h


220200_20220617125711_1.png?width=1203&h


220200_20220617125728_1.png?width=1203&h
Splashdown!





Sorry for this being short, Skylab 3 and 4 are very boring to recreate so excuse the lower quality

Link to comment
Share on other sites

8 hours ago, Rutabaga22 said:

Ok, this sounds wild, but hear me out, Lunar Skylab, in this universe where skylab succeeds, would nasa loose funding? maybe they could drum up interest with skylab! maybe there would be a lunar gateway style skylab.

 

Lunar Skylab would be interesting but there’s only two Saturn Vs left (SA-514 and SA-515) meaning you have one to launch Moonlab and one to launch crew, you could have crew on the first one similar to Apollo Venus. They could also create more hardware and possibly a Saturn V with Shuttle derived hardware but that is costly. For this TL majority of the funding is in STS and Skylab for expansion 

Link to comment
Share on other sites

  • 2 weeks later...
This thread is quite old. Please consider starting a new thread rather than reviving this one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...