Jump to content

No Shortage of Dreams | A KSP Skylab Alternative History


Recommended Posts

  • 4 weeks later...
  • 2 weeks later...


Skylab 8 | SLM-7 | STS-6 - June 7 - 12, 1982
Back To Back



Crew
Commander: Paul J. Weitz

Pilot: Rober F. Overmyer
Mission Specialist 1: Joseph P. Allen
Mission Specialist 2: Norman Thagard

Orbiter:
OV-099 | Challenger

Today, Challenger the sister Orbiter to Columbia is ready for her maiden flight and a back to back Skylab mission, a first since the Apollo days. STS-6 will consist of two main goals with one to deploy TDRS-1 (Tracking and Data Relay Satellite System) which will provide future constant communications with Skylab to NASA compared to the current short communication system that depends on the location of the Orbiter. The second goal will be to deploy SPPT (Solar Panel Prototype) which is a solar panel testbed for the future Power Module built by Lockheed which is nearing completion with launch slated for 1984. Even with the modifications done on Challenger there have been talks stirring up about the possibility to stop painting the External Tank to help with weight reduction after STS-6.




220200_20220824185449_1.png
Challenger awaiting launch

220200_20220824190416_1.png
Crew arm retract

220200_20220824190505_1.png


220200_20220824190526_1.png


220200_20220824190556_1.png
T-35 Seconds and counting

220200_20220824190656_1.png
T-10

220200_20220824190756_1.png
Liftoff of STS-6!

220200_20220824190853_1.png


220200_20220824191715_1.png
Roger roll Challenger!


220200_20220824191737_1.png
25 seconds, roll maneuverer complete

220200_20220824192217_1.png
Go at throttle up!

220200_20220824192308_1.png
Solid Rocket Booster separation

220200_20220824192355_1.png


220200_20220824221127_1.png


220200_20220824221335_1.png
Burn looking good!

220200_20220824221535_1.png


220200_20220824221620_1.png
SSME Shutdown

220200_20220824221705_1.png
Clean ET Sep

220200_20220824221725_1.png


220200_20220824221837_1.png
OMS burn

220200_20220824222118_1.png
Payload bay opens revealing TDRS-1 and SPPT

220200_20220824222126_1.png
Orbiter payload bay view of PPST and TDRS-1

220200_20220824222207_1.png


220200_20220824224656_1.png


220200_20220824224808_1.png
All systems looking good on IUS and TDRS-1

220200_20220824232701_1.png


220200_20220824232721_1.png


220200_20220824232852_1.png
TDRS-1 Fully erected at 45° angle

220200_20220824232905_1.png


220200_20220824233244_1.png
TDRS has been deployed

220200_20220824233343_1.png
TDRS-1 will now make its way to GEO

220200_20220825104716_1.png
Challenger in a rest period after deployment

220200_20220825112154_1.png


220200_20220825112234_1.png
Challenger awaiting SPPT deployment

220200_20220825115658_1.png
SPPT deployment

220200_20220825115719_1.png


220200_20220825121625_1.png


220200_20220826174950_1.png
SPPT fully deployed

220200_20220825122345_1.png
After successful deployment and data, SPPT will retract

220200_20220826175101_1.png
SPPT retracting

220200_20220826180030_1.png


220200_20220826180918_1.png
Preparing for deorbit burn

220200_20220826181025_2.png
OMS ignites for deorbit

220200_20220826181819_1.png


220200_20220826182034_1.png
Re-entry of Challenger

220200_20220826182055_2.png


220200_20220826182252_1.png


220200_20220826182817_1.png
Approaching Edwards

220200_20220826182949_1.png


220200_20220826183249_1.png


220200_20220826183306_2.png


220200_20220826183404_1.png
Wheel stop and the end of Challenger's maiden flight!

Link to comment
Share on other sites

  • 2 weeks later...


Skylab 9 | SLM-8 | STS-9 | Spacelab-1 - August 23 - 31, 1983


Crew:
Commander: John Young
Pilot: Robert Gibson
Mission Specialist 1 Robert L. Stewart
Mission Specialist 2: Owen Garriott  
Payload Specialist 1: Ulf Merbold 
Payload Specialist 2: Bryon K. Lichtenberg


Orbiter:
OV-102 | Columbia


Launch pad:
LC-39A


Columbia is set to start her first normal scheduled stay at Skylab and the final mission of Skylab Reuse Phase 2 with Phase 3 beginning in 1984. During this historical mission, the Columbia crew will carry out Spacelab experiments, three EVAs if possible,  ATM solar inspection for the upcoming crew of Skylab 10, and evaluate compatibility with Skylab for the future module planned in Phase 3.  Additionally, this will also be the first flight of an ESA astronaut and the reusable laboratory Spacelab which will mark a significant boost in the European space sector. Sadly, this will be John Young's final spaceflight, a true legendary pioneer in our space program.



220200_20220913000320_1.png


220200_20220913000423_1.png


220200_20220913001941_1.png
Crew arm retract

220200_20220913003031_1.png


220200_20220913003136_1.png


220200_20220913003340_1.png


220200_20220913004500_1.png
Go for main engine start

220200_20220913005655_1.png
Liftoff of STS-9!

220200_20220913010129_1.png


220200_20220913011810_1.png
Roger roll

220200_20220913011904_1.png
Roll complete

220200_20220913012148_1.png


220200_20220913012158_1.png
Columbia - Houston you are go at throttle up

220200_20220913022409_1.png
SRB Separation

220200_20220913014304_1.png


220200_20220913014457_1.png
Columbia on trajectory to Skylab

220200_20220913014745_1.png
ET Sep

220200_20220913014700_1.png


220200_20220913023828_1.png


220200_20220913024208_1.png


220200_20220913024835_1.png


220200_20220913024922_1.png
Payload bay opening revealing Spacelab-1

220200_20220913025225_1.png


220200_20220913025422_1.png


220200_20220913025508_1.png
Newfoundland captured by the crew

220200_20220913170244_1.png


220200_20220913170359_1.png


220200_20220913170542_1.png


220200_20220913171146_1.png
Rendezvous boost to Skylab

220200_20220913171613_1.png
Skylab in view photographed by STS-9

220200_20220913171552_1.png


220200_20220913171814_1.png


220200_20220913172036_1.png
Columbia - Houston go with docking

220200_20220913172656_1.png


220200_20220913172833_1.png
Approaching APAS-1

220200_20220913173431_1.png


220200_20220913173737_1.png


220200_20220913173752_1.png


220200_20220913173855_1.png
Berthed.

220200_20220913175053_1.png


220200_20220913175258_1.png


220200_20220913175802_1.png


220200_20220913180100_1.png


220200_20220913180441_1.png


220200_20220913180810_1.png


220200_20220913180958_1.png


220200_20220913181733_1.png


220200_20220913182857_1.png
First EVA of the program since Skylab 4

220200_20220913183326_1.png
ATM inspection

220200_20220913185204_1.png


220200_20220914002021_1.png


220200_20220914002448_1.png
Columbia preparing for undocking

220200_20220914004513_1.png
Undocking

220200_20220914004546_1.png


220200_20220914004706_1.png


220200_20220914004802_1.png


220200_20220914004812_1.png
Photographs while leaving Skylab

220200_20220914005412_1.png


220200_20220914005424_1.png
Final science instrument deployment

220200_20220914005950_1.png


220200_20220914010422_1.png
Deorbit

220200_20220914010935_1.png
Reentry

220200_20220914011317_1.png


220200_20220914011555_1.png


220200_20220914015431_1.png


220200_20220914015538_1.png
Columbia approaching pre final

220200_20220914020000_1.png
Gear down

220200_20220914020057_1.png
Touchdown

220200_20220914020242_1.png
Gear contact. Columbia is home.




this was supposed to be posted days ago just thought it was quite boring and put it off for a bit, but I am fine with it now and I hope you guys like it!

Edited by TruthfulGnome
Link to comment
Share on other sites

  • 3 weeks later...


Skylab 10 | SLM-9 | TRS-3 | STS-12| - December 17 - 24, 1983

Ending the year with the start of Reuse Phase 3 and the anticipated higher flight rate of 1984 and beyond has many excited about the future of Skylab and the STS program. Today, STS-12 will conduct ATM solar inspections, an EVA to retract the two forward ATM (Apollo Telescope Mount) solar panels which allows clearance for PM deployment on Skylab 11 which is scheduled for launch in February 1984, TRS-3 stow for docking with PM, and system checkouts for future kit installations. 

Crew:
Commander: Robert Crippen
Pilot: Francis R. Scobee
Mission specialist 1:Terry Hard
Mission Specialist 2: Richard Mullane
Payload Specialist 1: George Nelson


Orbiter: 
OV-102 | Columbia

Launch Pad:
LC-39A


220200_20221113044434_1.png


220200_20221113045404_1.png


220200_20221113045522_1.png


220200_20221113045545_1.png
Coming up on the 30 second mark.

220200_20221113050746_1.png
We are go for main engine start!

220200_20221113050757_1.png
Main engine ignition!

220200_20221113050848_1.png
Liftoff of Columbia!

220200_20221113050919_1.png
Roll maneuver 

220200_20221113051016_1.png


220200_20221113051126_1.png
Throttle down

220200_20221113051152_1.png


220200_20221113051229_1.png


220200_20221113051413_1.png
"Solid Rocket Booster separation confirmed"

220200_20221113051714_1.png


220200_20221113051900_1.png
External Tank sep

220200_20221113052042_1.png
Orbit burn

220200_20221113052605_1.png
Payload bay opening

220200_20221113053251_1.png


220200_20221113053439_1.png


220200_20221113053608_1.png
Columbia resting before Skylab rendezvous

220200_20221113053832_1.png

220200_20221113053913_1.png

220200_20221113054112_1.png
Arrival at Skylab

220200_20221113054227_1.png


220200_20221113054836_1.png
"PM deployed, look at her go!"

220200_20221113054925_1.png


220200_20221113055127_1.png
TRS aligned for docking

220200_20221113055208_1.png


220200_20221113055453_1.png
TRS-3 docked to Skylab

220200_20221113060123_1.png
Approach for docking

220200_20221113060353_1.png
Columbia docked 

220200_20221115071856_1.png


220200_20221115073223_1.png


220200_20221115073422_1.png


220200_20221115074145_1.png
EVA 2

220200_20221115074235_1.png


220200_20221115074325_1.png


220200_20221115074634_1.png
Solar 1 retract

220200_20221115075923_1.png


220200_20221115080044_1.png
Solar 2 retract

220200_20221115081349_1.png


220200_20221115081533_1.png


220200_20221115081651_1.png
Skylab seen with 2 of its solars retracted 

220200_20221115094457_1.png


220200_20221126000551_1.png


220200_20221126001242_1.png


220200_20221126001329_1.png
Luna

220200_20221126002642_1.png


220200_20221126000802_1.png
Columbia undocking

220200_20221126004100_1.png


220200_20221126004814_2.png
Payload bay sealing.

220200_20221126004958_1.png
Deorbit burn

220200_20221126005257_1.png
Preparing for reentry

220200_20221126005502_1.png


220200_20221126010703_1.png


220200_20221126010712_1.png
"Columbia now approaching Edwards"

220200_20221126011028_1.png
Gear down

220200_20221126011114_1.png
"Touchdown!"

220200_20221126011200_1.png
"Wheel stop! Columbia has finished yet another big mission for Skylab!"

Link to comment
Share on other sites

  • 3 weeks later...
  • 4 weeks later...
41 minutes ago, Kerbalsaurus said:

I saw you were planning to do something with making the Skylab multi-modular and now I wonder, how are you going to do that? Skylab was quite obviously designed to be a monolithic station.

You will see soon ;) 

Link to comment
Share on other sites


Skylab 11 | SLM-10 | STS-14 | February 9-16, 1984
We Have Power!



Crew:
Commander: Thomas K. Mattingly

Pilot: David M. Walker
Mission Specialist 1: Ellison S. Onizuka
Mission Specialist 2: David C. Leestma
Payload Specialist 1: Paul D. Skully-Power
Payload Specialist 2: Gary E. Payton


Orbiter:
OV-099 | Challenger


Following Ronald Reagans speech on January 25, 1984  where he said "America has always been greatest when we dared to be great. We can reach for further greatness, we can expand our dreams to distant stars living working in space for peaceful economic and scientific gain. Tonight, I am directing NASA to continue developing Skylab as a science platform and to develop a permanently manned space station for Low Earth Orbit exploration and further, and to do it within a decade after Skylab's lifetime. We want our friends and allies to share in their benefits, NASA will invite other countries to participate so we can strengthen peace, build prosperity, and expand freedom for all who share our goals." NASA is ready to push forwards with Phase 3 and attach the PM (Power Module) to Skylab, the PM built by Lockheed shares identical parts to the upcoming Hubble Space Telescope slated to launch in 1986, the PM will be removed from the Orbiters payload bay by TRS-3 and transported to Skylab where Challenger will dock afterwards and install the last remaining science kits. All of these achievements will allow the refurbished workshop to become fully operational, Shuttle tended, and allow full habitability of 3 crew.


The next mission to Skylab, Skylab 12, is scheduled for launch in May 1984 and will resupply the station's TACS fuel. This will be the final mission in Phase 3, after which the program will move on to Phase 4. Phase 4 will consist of several missions, including the installation of a new airlock, modified Spacelab, the use of a short modified Spacelab equipped with a science pallet, and the addition of a thermal shield wrap. These missions are expected to take place between 1985 and 1987.



220200_20221214145716_1.png


220200_20221215004714_1.png


220200_20221215011254_1.png
T-25 seconds, sequence now controlling the final seconds.

220200_20221215011839_1.png
Main engine start!

220200_20221215012028_1.png
Liftoff of Challenger to Skylab!

220200_20221215012150_1.png


220200_20221215012344_1.png
Roll program complete, now on trajectory with Skylab.

220200_20221215012644_1.png
Solid Rocket Booster separation

220200_20221215012742_1.png


220200_20221215013106_1.png
MECO

220200_20221215013242_1.png


220200_20221215013815_1.png
Challenger with her payload bay open.

220200_20221215022049_1.png


220200_20221215022310_2.png


220200_20221215022803_1.png
Rendezvous burn

220200_20221215023029_1.png
Skylab arrival

220200_20221215023232_1.png


220200_20221215023643_1.png


220200_20221215131533_1.png
TRS undocking

220200_20221215132752_1.png


220200_20221215133334_1.png
TRS approaching Challenger

220200_20221215133609_1.png
220200_20221215133621_1.png
220200_20221215133634_1.png


220200_20221215133739_1.png


220200_20221215134215_1.png
TRS-3 removes PM from Challenger.

220200_20221215134346_1.png


220200_20221215134434_1.png


220200_20221215134607_1.png


220200_20221215140505_1.png


220200_20221215140707_1.png
Soft dock

220200_20221215141721_1.png
TRS-3 undocks from PM to dock with the alternate docking port on Skylab.

220200_20221215141936_1.png


220200_20221215151202_1.png
Challenger soft docks to Skylab

220200_20221215151325_1.png


220200_20221215151844_1.png


220200_20221215151929_1.png
PM solar deploy

220200_20221215152113_1.png
PM solars fully deployed with TDRS communication antennas deployed.

220200_20221215152130_1.png


220200_20221215152233_1.png
Skylab now in its fully operational configuration.

220200_20230114114316_1.png


220200_20230114114419_1.png


220200_20230114115414_1.png
Undocking.

220200_20230114115646_1.png


220200_20230114123343_1.png
Deorbit.

220200_20230114123541_1.png


220200_20230114124414_1.png


220200_20230114125215_1.png


220200_20230114125313_1.png


220200_20230114125410_1.png
Wheel stop! wonderful mission you guys!

Link to comment
Share on other sites

  • 1 month later...
  • 2 weeks later...


Skylab 12 | SLM-11 | STS-16 | May 21-27 | 1984
The Ball

Crew:
Commander: Robert F. Overmyer
Pilot: Donald E. Williams
Mission Specialist 1: Rhea Sheddon
Mission Specialist 2: James F. Buchii
Payload Specialist 1: Jake Garn



Orbiter:

OV-099 | Challenger

Following the successful attachment of the PM and Skylab now being in its fully operational state, Challenger is prepared to send off Phase 3 of the program, which involved replenishing the TACS fuel on the Workshop. This mission is crucial to the program as Skylab is low on fuel. Challenger will carry a gaseous nitrogen "ball" which will require an EVA to have a cable run from the Orbiter's payload bay to the TACS section. This marks a one of a kind mission as NASA is developing an automated resupply system to keep fuel levels at a balanced level. After a short visit, the Skylab 12 will make necessary preparations for the arrival the Skylab 13 crew, who will conduct out final Spacelab compatibility tests between it and Skylab for permanent attachment on Skylab 14.


Additionally, Martin Marietta has been awarded a contract by the USAF to study and develop an inline External Tank for the proposed Hammerhead ET. This new Hammerhead ET will enable the Shuttle Orbiters to carry wider payloads. Meanwhile, Boeing has begun studying the SRB-X, a rocket with a core RSRM and two RSRM boosters which would be shared with STS launches, with this launcher Boeing hopes to provide an alternative to Martin Marietta's Titan launchers, SRB-X also aims to reduce the number of cargo launches on Space Shuttle.220200_20230207165728_1.png
Challenger preparing for flight

220200_20230207165934_1.png


220200_20230207170014_1.png


220200_20230207170103_2.png
Booster ignition and lift off!

220200_20230207170209_1.png
Roll program

220200_20230207170224_1.png


220200_20230207170512_1.png
Challenger soars on her way to Skylab

220200_20230207172620_2.png
Solid Rocket Booster sep!

220200_20230207172636_2.png


220200_20230207172750_1.png


220200_20230207172959_2.png


220200_20230207173136_1.png
Preparing for ET separation

220200_20230207173322_1.png


220200_20230207173725_1.png
Payload bay doors open revealing the large nitrogen TACS refueling ball.

220200_20230207180326_1.png


220200_20230207175813_1.png


220200_20230207181658_1.png
Arrival at Skylab

220200_20230207182252_1.png
Soft dock.

220200_20230207182751_1.png


220200_20230207182841_1.png
Hard dock, Skylab 12 will shortly begin refueling Skylab.

220200_20230207183345_1.png


220200_20230207183806_1.png


220200_20230207192352_1.png


220200_20230212005123_1.png


220200_20230212005402_1.png


220200_20230212010031_1.png
Skylab rests after being refueled

220200_20230212011436_1.png


220200_20230212011515_2.png


220200_20230212160434_1.png
Challenger undocks from Skylab

220200_20230212160623_1.png


220200_20230212161151_1.png


220200_20230212162527_1.png


220200_20230212163156_1.png
Preparing for deorbit and reentry

220200_20230212180750_1.png


220200_20230212181210_1.png
Reentry

220200_20230212181630_2.png


220200_20230212181651_1.png


220200_20230212181928_1.png


220200_20230212182137_1.png


220200_20230212182200_1.png
Touchdown

220200_20230212182350_1.png


220200_20230212182511_1.png


220200_20230212182811_1.png
Wheel stop and the end of Skylab 12.

this post is shorter than usual and will most likely be the last mission in this format, I plan on moving to a format with 2-3 missions in one post.

Edited by TruthfulGnome
Link to comment
Share on other sites

  • 4 weeks later...

 

Skylab 13 | SLM-12 | STS-18 | November 30 - December 11 | 1984

 

 

Orbiter: OV-099 | Challenger

 

Challenger prepares for a critical mission in the Skylab program, Skylab 13 will rendezvous and dock with the Skylab station to conduct final crucial experiments with the Spacelab module, This will pave the way for future Spacelab module attachments to the Orbital Workshop on Skylab 14 and Skylab 19. The Spacelab modules, developed by the European Space Agency are expected to play a pivotal role in advancing key space sciences, future space station capabilities, and manned permanent stays with crew rotations without the need of a Orbiter docked to the station.

Following President Roland Regan's announcement of the Teachers in Space Program, which will send teachers into space aboard the Space Shuttle to conduct teachings on the Skylab space station, even larger interest into the Space Shuttle and Skylab program has risen. With this massive program, NASA hopes young ones across the globe are inspired to pursue STEM fields to reach for the stars and expand mans' long dream of space.

 

In other news, the United States Air Force (USAF) continues to expand their involvement with the Space Shuttle and space industry overall. The USAF announced a Shuttle Orbiter to only be flown by the USAF ordered from Rockwell International, this Orbiter named 'Resolution' will be the sister orbiter to OV-103 Discovery. Discovery will conduct Vandenberg SLC-6 missions until Resolution is available to fly. Resolution will fly with the Hammerhead ET to enable larger payloads, it's noted that what the USAF's specific objectives with these missions are unknown.

 

220200_20230218022358_1.png

Challenger rests awaiting launch from LC-39A

 

220200_20230218023737_1.png?width=1200&h

 

 

220200_20230218070746_2.png

 

 

220200_20230218071237_1.png

Titan LC-41 visible in the background, a planned launch site for Skylab resupply launches.

 

220200_20230218071406_1.png

 

 

220200_20230218071827_1.png

T-35 seconds. The SRB hydraulic power unites have started.

 

220200_20230218072036_1.png

T-5..4..3..2..

 

220200_20230218073148_1.png

Roll program putting Challenger on track to Skylab

 

220200_20230218073500_1.png

Max-Q

 

220200_20230218073922_1.png

Solid shutdown.

 

220200_20230218074114_1.png

 

 

220200_20230218074528_1.png

External Tank separation

 

220200_20230218074922_2.png

 

 

220200_20230218075543_1.png

Rendezvous burn to Skylab.

 

220200_20230219022404_2.png

 

 

 

220200_20230219023339_1.png

Approaching Skylab

 

220200_20230219023547_2.png

 

 

220200_20230219024240_1.png

"Good alignment, nearing MDIM APAS forward node."

 

220200_20230219024457_1.png

Soft berth.

 

220200_20230305134820_1.png

 

 

220200_20230305154528_1.png

Challenger fully docked to the Skylab station.

 

220200_20230305154739_1.png

 

 

220200_20230305154858_1.png

 

 

220200_20230305155501_1.png

After a few days of final compatibility tests with Spacelab to Skylab, Challenger undocks from the station and prepares for a return to Earth.

 

220200_20230305155816_1.png

 

 

220200_20230305194320_1.png

 

 

220200_20230305194510_1.png

 

 

220200_20230305194838_2.png

Payload doors closing

 

220200_20230305200055_1.png

 

 

220200_20230305200427_1.png

Reentry.

 

220200_20230305201202_1.png

 

 

220200_20230305201748_1.png

 

image.png

 

 

image.png

Main gear touchdown

 

220200_20230305203053_1.png

Nose gear touchdown at Edwards Airforce Base

 

220200_20230305203247_2.png

Wheel stop, a perfect landing and finish to Skylab 13.

 

Note: I am retconning the radiator on the Power Module

Edited by TruthfulGnome
Link to comment
Share on other sites

This thread is quite old. Please consider starting a new thread rather than reviving this one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...